The Euromax Quay Wall: A Durable Construction
Publication: Ports 2010: Building on the Past, Respecting the Future
Abstract
At the Port of Rotterdam, civil contractor BAM Civiel constructed the quay wall for the deep water container terminal known as `Euromax'. The work was executed under a design and construct contract. Delta Marine Consultants first developed the bid design for BAM Civiel and, after contract award, performed the detailed design for construction. The quay wall has to accommodate 12,500 TEU containerships, the design water depth is 22 meters and the total retained height of the wall is 27 meters. During the bid stage seven possible design concepts, subdivided into approximately twenty design options, were prepared by Delta Marine Consultants and evaluated in close cooperation with the estimating and work preparation departments of BAM Civiel. Based on criteria of economy, reliability and durability two designs were selected and proposed to the client in two separate proposals. In one proposal the main retaining element of the quay wall consisted of a steel combi wall (tubular steel piles alternated with steel sheet piles) and in the other proposal the steel wall was replaced by a concrete diaphragm wall. In the past many quay walls in the Rotterdam harbor area have been constructed utilizing steel walls as the main soil retaining element. However, due to corrosion problems with these steel walls, and especially the phenomenon of accelerated low water corrosion, the Port of Rotterdam encouraged the bidders to submit designs that did not use steel retaining walls. Despite the higher construction costs, the Port of Rotterdam opted for the second proposal with the concrete diaphragm wall, for reasons of durability and maintenance. This quay wall is the first in the Netherlands to utilize a diaphragm wall. The contract was awarded in April 2005, the first 375 meters of the quay wall was handed over to the client in May 2006 and the complete quay wall with a length of 1,975 meters was handed over in June 2007. This paper elaborates upon the designs of the quay wall. Specific features are the precautions taken in design and construction to ensure the quality of the diaphragm wall. The result is a high quality reinforced concrete quay wall that is not susceptible to corrosion. The first quay walls to be constructed on the future Maasvlakte 2 extension of the Rotterdam harbor will be of the same design. Construction of these walls is expected to start in 2010.
Get full access to this article
View all available purchase options and get full access to this chapter.
Information & Authors
Information
Published In
Copyright
© 2010 American Society of Civil Engineers.
History
Published online: Apr 26, 2012
ASCE Technical Topics:
- Business management
- Construction engineering
- Construction management
- Contracts and subcontracts
- Diaphragm walls
- Diaphragms (structural)
- Foundations
- Geotechnical engineering
- Hydraulic engineering
- Hydraulic structures
- Pile foundations
- Piles
- Ports and harbors
- Practice and Profession
- Retaining structures
- Steel piles
- Structural engineering
- Structural members
- Structural systems
- Walls
- Water and water resources
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.