Continuity Testing of the Rampart and Homestake Pipelines

Publication: Pipelines 2009: Infrastructure's Hidden Assets

Abstract

The Rampart Raw Water Pipelines deliver water from Aurora's Rampart Reservoir to the Griswold and Wemlinger Water Treatment Plants for treatment and distribution to the City of Aurora's customers. The Rampart Raw Water Pipeline Phase III (Sta. 617+81 to Sta. 841+50) consists primarily of 54-inch-diameter Prestressed Concrete Cylinder Pipe (PCCP) manufactured by the Concrete Pipe Division of United States Pipe and Foundry Company in 1980. In addition, Aurora jointly owns (with the City of Colorado Springs) the Homestake Pipeline, a 66-inch Prestressed Concrete Non-Cylinder pipeline, which is an intermountain water supply that is the primary source for the water transported through the Rampart Pipeline. Simpson Gumpertz & Heger (SGH) prepared a Preliminary Failure Risk Analysis and Repair Priorities report (dated February 13, 2008), which presents the results of the company's risk analysis and repair priorities for the distressed PCCP between Sta. 762+11 and Sta. 815+29. Based on review of available data and risk analysis, SGH evaluated the pipe sections with a high distress rate in the area indicated above. PPIC had identified 80 pipe sections with broken wires in 2006, compared to 38 pipes in the 2002 inspection. The number of pipes with broken wires more than doubled over a 3-year period, which equates to an increase of 28% per year. Because of the apparently high increase in wire breaks or wire break activity, SGH recommended performing wire continuity measurements on 8 pipes identified by PPIC in 2006 as having more than 50 wire breaks to develop a relationship between the REF/TC-predicted and the number of broken wires indicated by the continuity test. Additionally, Pure Technologies performed electromagnetic testing (P-wave) in 2002, and PPIC performed RFEC/TC testing in 2002 and 2006 on portions of the Homestake Pipeline. One pipe, Pipe 352, was identified with 5 to 20 wire breaks in 2002 by Pure; with 25 in 2002; and with 50 in 2006 by PPIC. This pipe was selected as a candidate for continuity testing and, ultimately, dissection, to verify the actual number and location of broken wires. Two separate continuity-testing programs were performed on Pipe 352. The pipe was then removed, dissected, and documented. This paper presents the results of the continuity tests performed on certain pipe sections of the Rampart and Homestake Pipelines to develop a relationship between the REF/TC-predicted number of broken wires and the number of broken wires indicated by the continuity test.

Get full access to this article

View all available purchase options and get full access to this chapter.

Information & Authors

Information

Published In

Go to Pipelines 2009
Pipelines 2009: Infrastructure's Hidden Assets
Pages: 30 - 44

History

Published online: Apr 26, 2012

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Lawrence F. Catalano [email protected]
P.E.
M.ASCE
Capital Projects Division Manager, Aurora Water, City of Aurora, Colorado 14707 E. 2nd Ave., Ste. 150, Aurora, CO 80111. E-mail: [email protected]
Principal, Integra Engineering, 1095 S. Monaco Parkway, Denver, CO 80224. E-mail: randyp@integraEngineercom
Superintendant, Homestake Water Project, 37200 N. Highway 24, Buena Vista, CO 81211:. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share