Inspection, Failure Risk Analysis, and Repair of Cooling-Water Lines in One Outage

Publication: Pipelines 2008: Pipeline Asset Management: Maximizing Performance of our Pipeline Infrastructure

Abstract

In cooling-water lines of nuclear, coal-fired, and gas-fired power plants, large-diameter pipelines are used to convey water between the cooling towers and condenser heat exchangers. Several failures of cooling-water pipes raised the awareness of the risk of pipe failure and high costs of repair and loss of revenue from power generation. Inspection and repair of the distressed pipe pieces needs to be performed during planned outages. A power plant outage typically lasts between one and four weeks and occurs at three-or-more-year intervals. Since failure may result between inspection and repair time if a high risk pipe is left without repair, a program needs to be developed to inspect, assess the risk of failure, and repair of distressed pipes at high risk of failure during the same outage. This paper presents the results of a 108 in. diameter pipeline inspection, failure risk analysis, and repair of pipes during a two-week outage at the Tri-State power plant in Craig, Colorado. The cooling-water lines were inspected using electromagnetic inspection and on-site risk assessment of pipes with broken wires. Internal inspection and repair prioritization was performed at the beginning of the outage. CFRP and post-tensioning pipe repairs were designed prior to the outage, and a contractor was on standby so that the pipe pieces with the highest risk of failure could be repaired during the same outage. Four pipes were repaired using either internal CFRP lining or external post-tensioning within the scheduled time frame.

Get full access to this article

View all available purchase options and get full access to this chapter.

Information & Authors

Information

Published In

Go to Pipelines 2008
Pipelines 2008: Pipeline Asset Management: Maximizing Performance of our Pipeline Infrastructure
Pages: 1 - 10

History

Published online: Apr 26, 2012

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Rasko Ojdrovic [email protected]
Simpson Gumpertz & Heger Inc., 41 Seyon St., Waltham, MA 02453. E-mail: [email protected]
Gerald LaBonte [email protected]
Tri-State Power Generation and Transmission, Craig Station, Craig, CO. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share