Chapter
Apr 26, 2012

Condition Assessment of a 66-Inch Diameter PCCP Raw Water Transmission Main

Publication: Pipelines 2008: Pipeline Asset Management: Maximizing Performance of our Pipeline Infrastructure

Abstract

The Central Pipeline (CPL), installed in 1965, is a 66-in diameter, 12.6 mile pipeline owned and operated by the Santa Clara Valley Water District (SCVWD) in San Jose, California. Approximately half of the pipeline is constructed using prestressed concrete cylinder pipe (PCCP), embedded-cylinder type. Development in PCCP inspection technology has made it possible to detect distressed pipe with broken wires using nondestructive methods. Once distressed pipes are identified, a utility must determine whether pipe replacement, and/or pipe rehabilitation/repair, and/or continued monitoring/inspection is warranted. This paper is presented in two parts. The first part outlines the strategies used by the SCVWD to determine the appropriate course of action once distressed pipes were identified within the CPL. Spending more time up front to understand the magnitude of distress and failure risk of distressed pipe is recommended. This approach may seem costly and time consuming but it may pay off for the utility by savings on the cost of unnecessary repairs. In the second part of the paper, the results of failure risk analysis of distressed pipe in the CPL will be discussed. Failure risk analysis is based on the one hand on technology derived from finite-element analysis, hydrostatic pressure testing, and field observation of distressed pipe, and on the other hand on field inspection of properly selected sample of distressed pipe consistent with the desired reliability of the pipeline. In total, five pipe pieces were inspected using wire continuity test. All broken wires were found to have only isolated breaks related to the manufacturing process and unrelated to the corrosion of pipe or hydrogen embrittlement of wires. No repair or rehabilitation of the pipeline was necessary and there was no need for frequent inspections or monitoring.

Get full access to this article

View all available purchase options and get full access to this chapter.

Information & Authors

Information

Published In

Go to Pipelines 2008
Pipelines 2008: Pipeline Asset Management: Maximizing Performance of our Pipeline Infrastructure
Pages: 1 - 12

History

Published online: Apr 26, 2012

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Louise Dion [email protected]
Associate, Civil Engineer, Santa Clara Valley Water District, 5750 Almaden Expressway, San Jose, California, 95118. E-mail: [email protected]
Mehdi Zarghamee [email protected]
F.ASCE
Senior Principal, Simpson Gumpertz & Heger Inc., 41 Seyon St., Building 1, Suite 500, Waltham, MA 02453. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share