Remedies to the PPP Crisis in the Covid-19 Pandemic: Lessons from the 2008 Global Financial Crisis

Publication: Journal of Management in Engineering
Volume 38, Issue 3

Abstract

The COVID-19 pandemic has triggered a global economic crisis and is leading multiple local, regional, and national governments to increase public debt to unprecedented levels. This situation endangers current and future road public-private partnership (PPP) programs, given their dependence on user fees and/or government availability payments. Accordingly, this study aims to explore recovery measures to address short- and long-term road PPP-related challenges associated with the COVID-19 pandemic, by considering recuperation actions implemented during the 2008 global financial crisis (GFC). To do so, this research examines the PPP-crisis literature through the lens of social network analysis (SNA) and concepts linked to network modularity and community detection techniques. The analysis focuses on unraveling semantic relationships between PPP-related keywords in order to understand lessons learned from the GFC and to propose suitable remedies for overcoming the consequences of the global economic crisis derived from the COVID-19 pandemic. Findings show that the PPP-crisis literature forms a comprehensive self-contained interwoven network that can be organized into five semantic communities according to concepts related to risk, financing, governance, procurement, and institutional environment. Based on such communities, the analysis suggests five recovery measures and highlights two implementation challenges (i.e., global supply chain disruptions and quantitative easing policies). Future research is required to examine effective ways to apply the proposed PPP remedies in the long-term.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or codes that support the findings of this study are available from the corresponding author upon reasonable request.

Acknowledgments

This work was supported by Universidad de los Andes under Fondo de Apoyo para Profesores FAPA.

References

Abdul Nabi, M., and I. H. El-adaway. 2020. “Modular construction: Determining decision-making factors and future research needs.” J. Manage. Eng. 36 (6): 04020085. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000859.
Acerete, B., M. Gasca, and A. Stafford. 2019. “Two decades of DBFO roads in the UK and SPAIN: An evaluation of the financial performance.” Ann. Public Cooperative Econ. 90 (2): 269–289. https://doi.org/10.1111/apce.12237.
Akomea-Frimpong, I., X. Jin, and R. Osei-Kyei. 2020. “A holistic review of research studies on financial risk management in public–private partnership projects.” In Engineering, construction and architectural management. Bradford, UK: Emerald Publishing.
Aladağ, H., and Z. Işık. 2019. “Design and construction risks in BOT type mega transportation projects.” Eng. Constr. Archit. Manage. 26 (10): 2223–2242. https://doi.org/10.1108/ECAM-08-2018-0351.
Almadhoob, H. 2020. Self-organising networks in complex infrastructure projects: The case of London Bank Station Capacity Upgrade Project. London: Univ. College London.
Amann, M., J. K. Roehrich, M. Eßig, and C. Harland. 2014. “Driving sustainable supply chain management in the public sector: The importance of public procurement in the European Union.” Supply Chain Manage. 19 (3): 351–366. https://doi.org/10.1108/SCM-12-2013-0447.
Assaad, R., and I. H. El-adaway. 2020. “Enhancing the knowledge of construction business failure: A social network analysis approach.” J. Constr. Eng. Manage. 146 (6): 04020052. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001831.
Assad, R., and I. H. El-adaway. 2021. “Guidelines for responding to COVID-19 pandemic: Best practices, impacts, and future research directions.” J. Manage. Eng. 37 (3): 1–17.
Bagaya, O., and J. Song. 2016. “Empirical study of factors influencing schedule delays of public construction projects in Burkina Faso.” J. Manage. Eng. 32 (5): 05016014. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000443.
Bao, F., A. P. C. Chan, C. Chen, and A. Darko. 2018. “Review of public-private partnership literature from a project lifecycle perspective.” J. Infrastruct. Syst. 24 (3): 04018008. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000424.
Barua, S. 2021. “Understanding Coronanomics: The economic implications of the Covid-19 pandemic.” J. Dev. Areas Project Muse 55 (3): 435–450. https://doi.org/10.1353/jda.2021.0073.
Bautista Rodriguez, S. C., C. P. Mauricio, M. Laure, and B. Christophe. 2018. “Sustainable management of roadside: Towards a research agenda.” In Proc., 2018 IEEE Int. Conf. on Engineering, Technology and Innovation, ICE/ITMC 2018, 1–9. New York: IEEE. https://doi.org/10.1109/ICE.2018.8436326.
Baxter, D., and C. B. Casady. 2020a. “A coronavirus (COVID-19) triage framework for (Sub)national public-private partnership (PPP) programs.” Sustainability (Switzerland) 12 (13): 1–6.
Baxter, D., and C. B. Casady. 2020b. “A coronavirus (COVID-19) triage framework for (Sub) national public–private partnership (PPP) programs.” Sustainability (Switzerland) 12 (5253): 1–6.
Bayat, M., M. Khanzadi, and F. Nasirzadeh. 2020a. “Bargaining game model to determine concessionary items in build-operate-transfer contracts.” J. Constr. Eng. Manage. 146 (2): 04019109. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001774.
Bayat, M., M. Khanzadi, F. Nasirzadeh, and A. Chavoshian. 2020b. “Financial conflict resolution model in BOT contracts using bargaining game theory.” Constr. Innovation 20 (1): 18–42.
Blondel, V. D., J.-L. Guillaume, R. Lambiotte, and E. Lefebvre. 2008. “Fast unfolding of communities in large networks.” J. Stat. Mech.: Theory Exp. 2008 (10): P10008. https://doi.org/10.1088/1742-5468/2008/10/P10008.
Borgatti, S. P., A. Mehra, D. J. Brass, and G. Labianca. 2009. “Network analysis in the social sciences.” Science 323 (5916): 892–895. https://doi.org/10.1126/science.1165821.
Burke, R., and I. Demirag. 2015. “Changing perceptions on PPP games: Demand risk in Irish roads.” Crit. Perspect. Accounting 27 (Mar): 189–208. https://doi.org/10.1016/j.cpa.2013.11.002.
Burke, R., and I. Demirag. 2019. “Risk management by SPV partners in toll road public private partnerships.” Public Manage. Rev. 21 (5): 711–731. https://doi.org/10.1080/14719037.2018.1523450.
Carpintero, S., J. M. Vassallo, and A. Sánchez. 2015. “Dealing with traffic risk in Latin American toll roads.” J. Manage. Eng. 31 (2): 05014016. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000266.
Casady, C. B., and D. Baxter. 2020. “Pandemics, public-private partnerships (PPPs), and force majeure: COVID-19 expectations and implications.” Construct. Manage. Econ. 38 (12): 1077–1085. https://doi.org/10.1080/01446193.2020.1817516.
Castelblanco, G., and J. Guevara. 2020. “Risk allocation in PPP unsolicited and solicited proposals in Latin America: Pilot study in Colombia.” Constr. Res. Congress 2020: 1321–1329. https://doi.org/10.1061/9780784482889.141.
Castelblanco, G., J. Guevara, and P. Mendez-Gonzalez. 2021a. “Sustainability in PPPs: A network analysis.” In Proc., Interdisciplinary Civil and Construction Engineering Projects. ISEC-11. Fargo, ND: ISEC Press.
Castelblanco, G., J. Guevara, and P. Mendez-Gonzalez. 2022a. “PPP renegotiation flight simulator: A system dynamics model for renegotiating PPPs after pandemic crisis.” In Proc., Construction Research Congress 2022. Reston, VA: ASCE.
Castelblanco, G., J. Guevara, and P. Mendez-Gonzalez. 2022b. “In the name of the pandemic: A case study of contractual modifications in PPP solicited and unsolicited proposals in COVID-19 times.” In Proc., Construction Research Congress 2022. Reston, VA: ASCE.
Castelblanco, G., J. Guevara, H. Mesa, and D. Flores. 2020. “Risk allocation in unsolicited and solicited road public-private partnerships: Sustainability and management implications.” Sustainability 12 (11): 4478. https://doi.org/10.3390/su12114478.
Castelblanco, G., J. Guevara, H. Mesa, and A. Hartmann. 2022c. “Social legitimacy challenges in toll road PPP programs: Analysis of the Colombian and Chilean cases.” J. Manage. Eng. 38 (3): 05022002. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001010.
Castelblanco, G., J. Guevara, H. Mesa, and A. Sanchez. 2021b. “Semantic network analysis of literature on public-private partnerships.” J. Constr. Eng. Manage. 147 (5): 04021033. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002041.
Chan, A. P. C., and E. K. Owusu. 2017. “Corruption forms in the construction industry: Literature review.” J. Constr. Eng. Manage. 143 (8): 04017057. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001353.
Chen, B., F. M. Lio, and C. P. Huang. 2012. “Optimal financing mix of financially non-viable private-participation investment project with initial subsidy.” Eng. Econ. 23 (5): 452–461.
Chen, H.-C., and C.-W. Yeh. 2021. “Global financial crisis and COVID-19: Industrial reactions.” Finance Res. Lett. 42 (Oct): 101940. https://doi.org/10.1016/j.frl.2021.101940.
Chen, Q., A. Filardo, D. He, and F. Zhu. 2016. “Financial crisis, US unconventional monetary policy and international spillovers.” J. Int. Money Finance 67 (Oct): 62–81. https://doi.org/10.1016/j.jimonfin.2015.06.011.
Chen, W., H. Qu, and K. Chi. 2021. “Partner selection in China interorganizational patent cooperation network based on link prediction approaches.” Sustainability 13 (2): 1–16. https://doi.org/10.3390/su13021003.
Cherkos, F. D., and K. N. Jha. 2021. “Drivers of road sector public-private partnership adoption in new and inexperienced markets.” J. Constr. Eng. Manage. 147 (3): 04020186. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002004.
Cheung, E., and A. P. C. Chan. 2011. “Risk factors of public-private partnership projects in China: Comparison between the water, power, and transportation sectors.” J. Urban Plann. Dev. 137 (4): 409–415. https://doi.org/10.1061/(ASCE)UP.1943-5444.0000086.
Chiara, N., and N. Kokkaew. 2013. “Alternative to government revenue guarantees: Dynamic revenue insurance contracts.” J. Infrastruct. Syst. 19 (3): 287–296. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000145.
Chinowsky, P. S., J. Diekmann, and V. Galotti. 2008. “Social network model of construction.” J. Constr. Eng. Manage. 134 (10): 804–812. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:10(804).
Ćirilović, J., A. Nikolić, M. Mikić, and G. Mladenović. 2018. “Ex post analysis of road projects: Resilience to crisis.” Eur. J. Transp. Infrastruct. Res. 18 (4): 499–516. https://doi.org/10.18757/ejtir.2018.18.4.3262.
Clauset, A., M. E. J. Newman, and C. Moore. 2004. “Finding community structure in very large networks.” Phys. Rev. E 2004 (Dec): 1–6. https://doi.org/10.1103/physreve.70.066111.
Colon de Carbajal, B. 2011. “Private Finance Initiative y la gestión de infraestructuras en tiempos de crisis.” Revista de Obras Públicas 3518 (158): 1–6.
Connoly, C., and T. Wall. 2020. “The impact of the global financial crisis on public–private partnerships: A UK perspective.” In Rethinking public-private partnerships, 33–56. London: Routledge.
Costa, F., A. Denis Granja, A. Fregola, F. Picchi, and A. Portioli Staudacher. 2019. “Understanding relative importance of barriers to improving the customer-supplier relationship within construction supply chains using DEMATEL technique.” J. Manage. Eng. 35 (3): 04019002. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000680.
Cruz, C. O., and R. C. Marques. 2013. “Flexible contracts to cope with uncertainty in public–Private partnerships.” JPMA 31 (3): 473–483.
Davies, P. 2015. “The fall and rise of debt: Bank capital regulation after the crisis.” Eur. Bus. Organ. Law Rev. 16 (3): 491–512. https://doi.org/10.1007/s40804-015-0017-8.
de Castro e Silva Neto, D., C. O. Cruz, F. Rodrigues, and P. Silva. 2016. “Bibliometric analysis of PPP and PFI literature: Overview of 25 years of research.” J. Constr. Eng. Manage. 142 (10): 06016002. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001163.
de Castro Silva e Neto, D., C. Oliveira Cruz, and J. Miranda Sarmento. 2019. “Renegotiation of transport public private partnerships: Policy implications of the Brazilian experience in the Latin American context.” Case Stud. Transp. Policy 7 (3): 554–561. https://doi.org/10.1016/j.cstp.2019.07.003.
De Clerck, D., and E. Demeulemeester. 2016. “Creating a more competitive PPP procurement market: Game theoretical analysis.” J. Manage. Eng. 32 (6): 04016015. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000440.
Demirag, I., I. Khadaroo, and P. Stapleton. 2015. “A changing market for PFI financing: Evidence from the financiers.” Accounting Forum 39 (3): 188–200.
Didier, T., F. Huneeus, M. Larrain, and S. L. Schmukler. 2021. “Financing firms in hibernation during the COVID-19 pandemic.” J. Finance Stab. 53 (Apr): 100837. https://doi.org/10.1016/j.jfs.2020.100837.
Eissa, R., M. S. Eid, and E. Elbeltagi. 2021. “Current applications of game theory in construction engineering and management research: A social network analysis approach.” J. Constr. Eng. Manage. 147 (7): 04021066. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002085.
Engel, E., R. Fischer, and A. Galetovic. 2013. “The basic public finance of public-private partnerships.” J. Eur. Econ. Assoc. 11 (1): 83–111. https://doi.org/10.1111/j.1542-4774.2012.01105.x.
Eteifa, S. O., and I. H. El-adaway. 2018. “Using social network analysis to model the interaction between root causes of fatalities in the construction industry.” J. Manage. Eng. 34 (1): 04017045. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000567.
Fakhoury, I. N. 2020. “How the World Bank is looking at COVID-19 and public-private partnerships, right now and post-crisis.” Accessed December 30, 2020. https://blogs.worldbank.org/ppps/how-world-bank-looking-covid-19-and-public-private-partnerships-right-now-and-post-crisis.
Fernandes, C., M. Ferreira, and F. Moura. 2016. “PPPs—True financial costs and hidden returns.” Transp. Rev. 36 (2): 207–227. https://doi.org/10.1080/01441647.2015.1076905.
Foroni, C., M. Marcellino, and D. Stevanovic. 2021. “Forecasting the Covid-19 recession and recovery: Lessons from the financial crisis.” Int. J. Forecasting 2020 (Dec): 26. https://doi.org/10.1016/j.ijforecast.2020.12.005.
Fyfe, D. 2021. Supply-chain inflation: Transitory or durable?, 1–10. Boulder, CO: Univ. of Colorado.
Gajdzik, B., and R. Wolniak. 2021. “Influence of the COVID-19 crisis on steel production in Poland compared to the financial crisis of 2009 and to boom periods in the market.” Resources 10 (1): 1–17. https://doi.org/10.3390/resources10010004.
Garrido, L., J. Gomez, M. de los Ángeles Baeza, and J. M. Vassallo. 2017. “Is EU financial support enhancing the economic performance of PPP projects? An empirical analysis on the case of spanish road infrastructure.” Transp. Policy 56 (May): 19–28. https://doi.org/10.1016/j.tranpol.2017.02.010.
Garvin, M. J., and D. Bosso. 2008. “Assessing the effectiveness of infrastructure public–private partnership programs and projects.” Public Works Manage. Policy 13 (2): 162–178. https://doi.org/10.1177/1087724X08323845.
Gismondi, A. 2020. “P3 projects moving ahead despite pandemic, some accelerated.” Accessed December 30, 2020. https://canada.constructconnect.com/joc/news/projects/2020/05/p3-projects-moving-ahead-despite-pandemic-some-accelerated.
Grimsey, D., and M. Lewis. 2011. “Minimizing collateral damage: Options for financing public-private partnerships in the wake of the financial crisis.” In The financial crisis and the regulation of finance, 249–265. Cheltenham, UK: Edward Elgar Publishing.
Guerrero, M., F. G. Montoya, R. Baños, A. Alcayde, and C. Gil. 2017. “Adaptive community detection in complex networks using genetic algorithms.” Neurocomputing 266 (Nov): 101–113. https://doi.org/10.1016/j.neucom.2017.05.029.
Guerrero, M., F. G. Montoya, R. Baños, A. Alcayde, and C. Gil. 2018. “Community detection in national-scale high voltage transmission networks using genetic algorithms.” Adv. Eng. Inf. 38 (Oct): 232–241. https://doi.org/10.1016/j.aei.2018.07.001.
Guevara, J., M. J. Garvin, and N. Ghaffarzadegan. 2020a. “The forest and the trees: A systems map of governance interdependencies in the shaping phase of road public-private partnerships.” J. Manage. Eng. 36 (1): 04019031. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000726.
Guevara, J., J. Salazar, and M. J. Garvin. 2020b. “Social network analysis of road PPP equity markets in Canada, Chile, and the United States.” J. Manage. Eng. 36 (5): 04020058. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000830.
Haran, M., M. McCord, N. Hutchison, S. McGreal, A. Adair, J. Berry, and A. Kashyap. 2013. “Financial structure of PPPs deals post-GFC: An international perspective.” J. Financ. Manage. Property Constr. 18 (2): 184–203. https://doi.org/10.1108/JFMPC-07-2012-0028.
Hodge, G., C. Greve, and A. Boardman. 2017. “Public-private partnerships: The way they were and what they can become.” Aust. J. Public Admin. 76 (3): 273–282. https://doi.org/10.1111/1467-8500.12260.
Hodge, G. A., and C. Greve. 2016. “On public–private partnership performance: A contemporary review.” Public Works Manage. Policy 22 (1): 55–78. https://doi.org/10.1177/1087724X16657830.
Jain, A. K., M. N. Murty, and P. J. Flynn. 1999. Data clustering: A review. New York: Association for Computing Machinery.
Jeon, J., S. Padhye, A. Bhattacharyya, H. Cai, and M. Hastak. 2022. “Impact of COVID-19 on the US construction industry as revealed in the Purdue Index for Construction.” J. Manage. Eng. 38 (1): 04021082. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000995.
Jin, X.-H., and G. Zhang. 2011. “Modelling optimal risk allocation in PPP projects using artificial neural networks.” Int. J. Project Manage. 29 (5): 591–603. https://doi.org/10.1016/j.ijproman.2010.07.011.
Johnson, S. C. 1967. “Hierarchical clustering schemes.” Psychometrika 32 (3): 241–254.
Joyce, M., D. Miles, A. Scott, and D. Vayanos. 2012. “Quantitative easing and unconventional monetary policy—An introduction.” Econ. J. 122 (564): F271–F288. https://doi.org/10.1111/j.1468-0297.2012.02551.x.
Jungfeng, C., Y. Wang, X. Liu, and Y. Liu. 2020. “Social network community analysis based large-scale group decision making approach with incomplete fuzzy preference relations.” Inf. Fusion 60 (Feb): 98–120.
Karim, S. S. A., and Q. A. Karim. 2021. “Omicron SARS-CoV-2 variant: A new chapter in the COVID-19 pandemic.” Lancet 398 (10317): 2126–2128. https://doi.org/10.1016%2FS0140-6736(21)02758-6.
Ke, Y., S. Wang, A. P. Chan, and E. Cheung. 2009. “Research trend of public-private partnership in construction journals.” J. Constr. Eng. Manage. 135 (10): 1076–1086. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:10(1076).
Khalifa, R. I., and T. U. Daim. 2021. “Project assessment tools evaluation and selection using the hierarchical decision modeling: Case of state departments of transportation in the United States.” J. Manage. Eng. 37 (1): 1–16.
Khallaf, R., N. Naderpajouh, and M. Hastak. 2018. “Modeling three-party interactional risks in the governance of public–private partnerships.” J. Manage. Eng. 34 (6): 04018040. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000646.
Kim, Y., J. Kim, S. S. Oh, S.-W. Kim, M. Ku, and J. Cha. 2021. “Community analysis of a crisis response network.” Soc. Sci. Comput. Rev. 39 (3): 371–390. https://doi.org/10.1177/0894439319858679.
Koc, K., and A. P. Gurgun. 2021. “Stakeholder-associated life cycle risks in construction supply chain.” J. Manage. Eng. 37 (1): 04020107. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000881.
Kokkaew, N., and N. Chiara. 2013. “A modeling government revenue guarantees in privately built transportation projects: A risk-adjusted approach.” Transport 28 (2): 186–192. https://doi.org/10.3846/16484142.2013.803262.
Kolaczyk, E. D., and G. Csárdi. 2020. Statistical analysis of network data with R. Berlin: Springer.
Ladley, H. 2020. “COVID-19 & infrastructure: Why governments must act to protect projects.” Accessed December 30, 2020. https://blogs.worldbank.org/ppps/covid-19-infrastructure-why-governments-must-act-protect-projects.
Levitt, R. E., W. Henisz, and D. Settel. 2009. “Defining and mitigating the governance challenges of infrastructure project development and delivery.” In Proc., Conf. on Leadership and Management of Construction, 2–17. Reston, VA: ASCE.
Liu, C., W. Ji, S. M. AbouRizk, and M.-F. F. Siu. 2019. “Equipment logistics performance measurement using data-driven social network analysis.” J. Constr. Eng. Manage. 145 (5): 04019033. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001659.
Loxley, J. 2012. “Public-private partnerships after the global financial crisis: Ideology trumping economic reality.” Studies Political Econ. 89 (1): 7–38. https://doi.org/10.1080/19187033.2012.11674999.
Lu, S., Y. Huang, Z. Zhao, and X. Yang. 2018. “Exploring the hierarchical structure of China’s railway network from 2008 to 2017.” Sustainability 10 (9): 3173. https://doi.org/10.3390/su10093173.
Mao, C., Q. Shen, W. Pan, and K. Ye. 2015. “Major barriers to off-site construction: The developer’s perspective in China.” J. Manage. Eng. 31 (3): 04014043. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000246.
Mathieu, E., H. Ritchie, E. Ortiz-Ospina, M. Roser, J. Hasell, C. Appel, C. Giattino, and L. Rodés-Guirao. 2021. “A global database of COVID-19 vaccinations.” Nat. Hum. Behav. 5 (7): 947–953. https://doi.org/10.1038/s41562-021-01122-8.
McGee, C., and M. Mayer. 2021. “Pitfalls and potholes: Examining the impacts of Covid-19 on the North Carolina Department of Transportation.” Public Works Manage. Policy 26 (1): 13–18. https://doi.org/10.1177/1087724X20969162.
Menezes, F., and M. Ryan. 2015. “Default and renegotiation in public-private partnership auctions.” J. Public Econ. Theory 17 (1): 49–77. https://doi.org/10.1111/jpet.12102.
Milligan, E., M. Nayak, and C. Yasiejko. 2020. “Corporate contracts get a rewrite for the post-pandemic era.” Accessed December 30, 2020. https://www.bloombergquint.com/businessweek/l-brands-wework-fights-point-to-pandemic-premium-in-deals-ahead.
Moreno, J. L. 1937. “Sociometry in relation to other social sciences.” Sociometry 1 (1–2): 206–219. https://doi.org/10.2307/2785266.
Moseley, M. 2020. Restoring confidence in public-private partnerships: Reforming Risk Allocation and Creating More Collaborative PPPs. Manila, Philippines: Asian Development Bank.
Möykkynen, H., and A. Pantelias. 2020. “Viability gap funding for promoting private infrastructure investment in Africa: Views from stakeholders.” J. Econ. Policy Reform 24 (2): 253–269. https://doi.org/10.1080/17487870.2020.1785296.
Mu, R., M. de Jong, and E. ten Heuvelhof. 2010. “A typology of strategic behaviour in ppps for expressways: Lessons from china and implications for Europe.” Eur. J. Transp. Infrastruct. Res. 10(1), 42–62.
Newman, M. E. 2004. “Analysis of weighted networks.” Physical Rev. E 70 (5): 056131. https://doi.org/10.1103/PhysRevE.70.056131.
Newman, M. E. J., and M. Girvan. 2004. “Finding and evaluating community structure in networks.” Phys. Rev. E: Stat. Nonlinear Soft Matter Phys. 69 (2): 026113. https://doi.org/10.1103/PhysRevE.69.026113.
Nikolić, A., A. Roumboutsos, J. Ć. Stanković, and G. Mladenović. 2020. “Has the latest global financial crisis changed the way road public-private partnerships are funded? A comparison of Europe and Latin America.” Util. Policy 64 (Jun): 101044. https://doi.org/10.1016/j.jup.2020.101044.
Nocera, J. 2020. “Get ready for a tsunami of pandemic lawsuits over broken deals.” Accessed December 30, 2020. https://www.bloombergquint.com/businessweek/pandemic-lawsuits-will-ask-is-the-coronavirus-an-act-of-god.
Ortega, A., M. de los Angeles Baeza, and J. M. Vassallo. 2016. “Contractual PPPs for transport infrastructure in Spain: Lessons from the economic recession.” Transp. Rev. 36 (2): 187–206. https://doi.org/10.1080/01441647.2015.1076904.
Ortiz, I. N., and J. N. Buxbaum. 2008. “Protecting the public interest in long-term concession agreements for transportation infrastructure.” Public Works Manage. Policy 13 (2): 126–137. https://doi.org/10.1177/1087724X08326175.
Osei-kyei, R., and A. P. C. Chan. 2017. “Developing a project success index for public–private partnership projects in developing countries.” J. Infrastruct. Syst. 23 (4): 04017028. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000388.
Outerbridge, D., J. R. Lumière, S. Slavens, and N. Wall. 2020. “COVID-19 and force majeure clauses: Key considerations, implications, and practice tips.” Accessed May 1, 2021. https://www.torys.com/Our%20Latest%20Thinking/Publications//2020/03/covid-19-and-force-majeure-clauses/.
Owolabi, H., L. Oyedele, H. Alaka, S. Ajayi, M. Bilal, and O. Akinade. 2019. “Risk mitigation in PFI/PPP project finance: A framework model for financiers’ bankability criteria.” Built Environ. Project Asset Manage. 10 (1): 28–49. https://doi.org/10.1108/BEPAM-09-2018-0120.
Owolabi, H. A., L. O. Oyedele, H. A. Alaka, S. O. Ajayi, O. O. Akinade, and M. Bilal. 2020. “Critical success factors for ensuring bankable completion risk in PFI/PPP megaprojects.” J. Manage. Eng. 36 (1): 04019032. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000717.
Perera, N. A., M. Sutrisna, and T. W. Yiu. 2016. “Decision-making model for selecting the optimum method of delay analysis in construction projects.” J. Manage. Eng. 32 (5): 04016009. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000441.
Petersen, E., et al. 2021. “Emergence of new SARS-CoV-2 variant of concern Omicron (B.1.1.529)—Highlights Africa’s research capabilities, but exposes major knowledge gaps, inequities of vaccine distribution, inadequacies in global COVID-19 response and control efforts.” Int. J. Infect. Dis. 114 (Jan): 268–272. https://doi.org/10.1016/j.ijid.2021.11.040.
Pryke, S. D. 2004. “Analysing construction project coalitions: Exploring the application of social network analysis.” Constr. Manage. Econ. 22 (8): 787–797. https://doi.org/10.1080/0144619042000206533.
Queiroz, C., N. Vajdic, and G. Mladenovic. 2013. “Public-private partnerships in roads and government support: Trends in transition and developing economies.” Transp. Plan. Technol. 36 (3): 231–243. https://doi.org/10.1080/03081060.2013.779472.
Reeves, E., and D. Palcic. 2017. “Getting back on track: The expanded use of PPPs in Ireland since the global financial crisis.” Policy Studies 38 (4): 339–355. https://doi.org/10.1080/01442872.2017.1314456.
Reeves, E., D. Palcic, and D. Flannery. 2015. “PPP procurement in Ireland: An analysis of tendering periods.” Local Govern. Stud. 41 (3): 379–400. https://doi.org/10.1080/03003930.2014.982108.
Reis, R. F., and J. M. Sarmento. 2019. “‘Cutting costs to the bone’: The Portuguese experience in renegotiating public private partnerships highways during the financial crisis.” Transportation 46 (1): 285–302. https://doi.org/10.1007/s11116-017-9807-x.
Rojas, R., G. Bennison, V. Gálvez, E. Claro, and G. Castelblanco. 2020. “Advancing collaborative water governance: Unravelling stakeholders’ relationships and influences in contentious river basins.” Water 12 (12): 3316. https://doi.org/10.3390/w12123316.
Roper, S., and J. Turner. 2020. “R& D and innovation after COVID-19: What can we expect? A review of prior research and data trends after the great financial crisis.” Int. Small Bus. J. Researching Entrepreneurship 38 (6): 504–514. https://doi.org/10.1177/0266242620947946.
Salazar, J., J. Guevara, and K. Verhoest. 2021. “Inferential analysis of road infrastructure PPP sponsor networks.” J. Manage. Eng. 37 (6): 04021069. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000971.
Shehzad, K., L. Xiaoxing, and H. Kazouz. 2020. “COVID-19’s disasters are perilous than global financial crisis: A rumor or fact?” Finance Res. Lett. 36 (Apr): 101669. https://doi.org/10.1016/j.frl.2020.101669.
Sheldon, T. 2021. “Covid-19: Austria enters lockdown as cases surge across Europe.” BMJ 375: 2861. https://doi.org/10.1136/bmj.n2861.
Singla, A., J. Shumberger, and D. Swindell. 2021. “Paying for infrastructure in the post-recession era: Exploring the use of alternative funding and financing tools.” J. Urban Aff. 43 (4): 526–548. https://doi.org/10.1080/07352166.2019.1660580.
Soecipto, R. M., and K. Verhoest. 2018. “Contract stability in European road infrastructure PPPs: How does governmental PPP support contribute to preventing contract renegotiation?” Public Manage. Rev. 20 (8): 1145–1164. https://doi.org/10.1080/14719037.2018.1428414.
Soliño, A. S., and P. G. de Santos. 2010. “Transaction costs in transport public–private partnerships: Comparing procurement procedures.” Transp. Rev. 30 (3): 389–406. https://doi.org/10.1080/01441640903037941.
Stern, J. 2012. “The relationship between regulation and contracts in infrastructure industries: Regulation as ordered renegotiation” Regul. Governance 6 (4): 474–498. https://doi.org/10.1111/j.1748-5991.2012.01141.x.
Sumirat, E., S. R. Nidar, A. Herwany, and S. K. Wiryono. 2020. “Risk impact besides capital structure and investment valuation into public housing projects investment rate.” Acad. Strategic Manage. J. 19 (5): 1–9.
Tan-Kantor, A., M. Abbott, and C. Jubb. 2017. “Accounting choice and theory in crisis: The case of the victorian desalination plant.” Aust. Accounting Rev. 27 (3): 273–284. https://doi.org/10.1111/auar.12149.
Torchia, M., A. Calabrò, and M. Morner. 2015. “Public–private partnerships in the health care sector: A systematic review of the literature.” Public Manage. Rev. 17 (2): 236–261. https://doi.org/10.1080/14719037.2013.792380.
Tsai, I.-C., and H.-C. Tsai. 2017. “The price concessions of high- and low-priced housing in a period of financial crisis.” Quant. Finance Econ. 1 (1): 94–113. https://doi.org/10.3934/QFE.2017.1.94.
Tserng, H. P., S.-P. Ho, J.-S. Chou, and C. Lin. 2014. “Proactive measures of governmental debt guarantees to facilitate public-private partnerships project.” J. Civ. Eng. Manage. 20 (4): 548–560. https://doi.org/10.3846/13923730.2013.801883.
Valero, V. 2015. “Government opportunism in public-private partnerships.” J. Public Econ. Theory 17 (1): 111–135.
Vassallo, J. M., A. Ortega, and M. d. l. Á. Baeza. 2012. “Impact of the economic recession on toll highway concessions in Spain.” J. Manage. Eng. 28 (4): 398–406. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000108.
Whiteside, H. 2020. “Public-private partnerships: Market development through management reform.” Rev. Int. Political Econ. 27 (4): 880–902. https://doi.org/10.1080/09692290.2019.1635514.
Wojcik, D. J., N. M. Ardoin, and R. K. Gould. 2021. “Using social network analysis to explore and expand our understanding of a robust environmental learning landscape.” Environ. Educ. Res. 27 (9): 1263–1283.
Zhang, D., M. Hu, and Q. Ji. 2020. “Financial markets under the global pandemic of COVID-19.” Finance Res. Lett. 36 (Oct): 101528. https://doi.org/10.1016/j.frl.2020.101528.
Zhang, S., A. P. C. Chan, Y. Feng, H. Duan, and Y. Ke. 2016. “Critical review on PPP research—A search from the Chinese and international journals.” Int. J. Project Manage. 34 (4): 597–612. https://doi.org/10.1016/j.ijproman.2016.02.008.
Zhang, S., J. Li, Y. Li, and X. Zhang. 2021. “Revenue risk allocation mechanism in public-private partnership projects: Swing option approach.” J. Constr. Eng. Manage. 147 (1): 04020153. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001952.
Zhu, L., and D. K. H. Chua. 2018. “Identifying critical bankability criteria for PPP projects: The case of China.” Adv. Civ. Eng. 2018: 7860717. https://doi.org/10.1155/2018/7860717.

Information & Authors

Information

Published In

Go to Journal of Management in Engineering
Journal of Management in Engineering
Volume 38Issue 3May 2022

History

Received: Jun 30, 2021
Accepted: Dec 30, 2021
Published online: Mar 9, 2022
Published in print: May 1, 2022
Discussion open until: Aug 9, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Doctoral Research Assistant, Dept. of Civil and Environmental Engineering, Universidad de los Andes, Bogota 111711, Colombia (corresponding author). ORCID: https://orcid.org/0000-0001-6820-6644. Email: [email protected]
Jose Guevara [email protected]
Assistant Professor, Dept. of Civil and Environmental Engineering, Universidad de los Andes, Bogota 111711, Colombia. Email: [email protected]
Graduate Research Assistant, Dept. of Civil and Environmental Engineering, Universidad de los Andes, Bogota 111711, Colombia. ORCID: https://orcid.org/0000-0001-7519-0011. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Navigating PPP Renegotiations in the Wake of COVID-19: Insights from a Toll Road Program, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10.1061/JLADAH.LADR-1082, 16, 1, (2024).
  • Comprehensive Understanding of Factors Impacting Competitive Construction Bidding, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-14090, 150, 4, (2024).
  • System Dynamics Modeling for Investigating the Retention of Skilled Labor in the Construction Market, Computing in Civil Engineering 2023, 10.1061/9780784485248.068, (564-572), (2024).
  • Environmental Impact Assessment Effectiveness in Public–Private Partnerships: Study on the Colombian Toll Road Program, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5015, 39, 2, (2023).
  • Identifying the Critical Factors Affecting the Operational Performance of Characteristic Healthcare Town PPP Projects: Evidence from China, Journal of Infrastructure Systems, 10.1061/JITSE4.ISENG-2255, 29, 4, (2023).
  • System Dynamic Modeling to Study the Impact of Construction Industry Characteristics and Associated Macroeconomic Indicators on Workforce Size and Labor Retention Rate, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-13410, 149, 10, (2023).
  • Brace for Another Crisis: Empirical Evidence from US Construction Industry and Firm Performance during and after 2007–2009 Global Financial Crisis, Journal of Management in Engineering, 10.1061/(ASCE)ME.1943-5479.0001102, 39, 1, (2023).
  • Building Information Modeling for Risk Management: A Literature Review, Digitalisation: Opportunities and Challenges for Business, 10.1007/978-3-031-26953-0_1, (3-10), (2023).
  • Fiscal Pressure and Public–Private Partnership Investment: Based on Evidence from Prefecture-Level Cities in China, Sustainability, 10.3390/su142214979, 14, 22, (14979), (2022).
  • Mapping Studies on Sustainability in the Performance Measurement of Public-Private Partnership Projects: A Systematic Review, Sustainability, 10.3390/su14127174, 14, 12, (7174), (2022).
  • See more

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share