Technical Papers
Oct 29, 2022

Sensor-Integrated Hybrid Blockchain System for Supply Chain Coordination in Volumetric Modular Construction

Publication: Journal of Construction Engineering and Management
Volume 149, Issue 1

Abstract

Volumetric modular construction (VMC) needs streamlined supply chain coordination to achieve its full potential benefits, such as reduced schedule and cost, with consistent quality. Studies have noted that blockchain technology has significant potential for increasing the efficacy of supply chain coordination by providing reliable information sharing among VMC stakeholders. However, it is not well known how blockchain technology’s enhanced information sharing ultimately can lead to better supply chain coordination in VMC. To address this issue, we developed and tested a blockchain-based information collecting, storing, and sharing system with an automated contract execution method. A sensor-integrated decentralized application collects project information and sends it to the blockchain network to be shared among project participants for data-driven actions in VMC. We demonstrated the system through a hypothetical case project in which stakeholders took photos with their mobile devices to share the module’s status information to trigger an automated payment promptly, facilitating efficient supply chain coordination. The results show that any photos collected from the stakeholder’s mobile device can be traceably stored and shared in the suggested blockchain system regardless of their file size, triggering nearly real-time automated payments. The primary contribution of this study is the development and demonstration of a blockchain system that realizes accountable project-related information sharing with automated contract execution functions across VMC stakeholders for better supply chain coordination.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

Acknowledgments

This research was supported by the Chung-Ang University Research Grants in 2021. This study is supported financially by a National Research Foundation of Korea (NRF) grant funded by the Korea government Ministry of Science and ICT (MSIP) (Nos. NRF-2020R1A4A4078916 and NRF-2022R1G1A1012897).

References

Arashpour, M., Y. Bai, G. Aranda-mena, A. Bab-Hadiashar, R. Hosseini, and P. Kalutara. 2017. “Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction.” Autom. Constr. 84 (Dec): 146–153. https://doi.org/10.1016/j.autcon.2017.08.032.
Azhar, S., M. Y. Lukkad, and I. Ahmad. 2013. “An investigation of critical factors and constraints for selecting modular construction over conventional stick-built technique.” Int. J. Construct. Educ. Res. 9 (3): 203–225. https://doi.org/10.1080/15578771.2012.723115.
Caldarelli, G. 2020. “Understanding the blockchain oracle problem: A call for action.” Information 11 (11): 509. https://doi.org/10.3390/info11110509.
Chen, Z., K. Khan, A. Khan, K. Javed, and J. Liu. 2021. “Exploration of the multidirectional stability and response of prefabricated volumetric modular steel structures.” J. Constr. Steel Res. 184 (21): 106826. https://doi.org/10.1016/j.jcsr.2021.106826.
Choi, J. O. 2014. “Links between modularization critical success factors and project performance committee.” Ph.D. Dissertation, Univ. of Texas at Austin. https://repositories.lib.utexas.edu/handle/2152/25030.
Choi, J. O., X. B. Chen, and T. W. Kim. 2019. “Opportunities and challenges of modular methods in dense urban environment.” Int. J. Construct. Manage. 19 (2): 93–105. https://doi.org/10.1080/15623599.2017.1382093.
Dai, H. N., Z. Zheng, and Y. Zhang. 2019. “Blockchain for internet of things: A survey.” IEEE Internet Things J. 6 (5): 8076–8094. https://doi.org/10.1109/JIOT.2019.2920987.
Dhillon, V., D. Metcalf, and M. Hooper. 2017. “The hyperledger project.” In Blockchain enabled applications, 139–149. Berlin: Springer.
Elghaish, F., S. Abrishami, and M. R. Hosseini. 2020. “Integrated project delivery with blockchain: An automated financial system.” Autom. Constr. 114 (Jun): 103182. https://doi.org/10.1016/j.autcon.2020.103182.
Ezzeddine, A., and B. García de Soto. 2021. “Connecting teams in modular construction projects using game engine technology.” Autom. Constr. 132 (Dec): 103887. https://doi.org/10.1016/j.autcon.2021.103887.
Goodier, C. 2014. “Introduction to planning of modular buildings.” In Design in modular construction, 85–100. London: CRC Press.
Hamledari, H., and M. Fischer. 2021. “Measuring the impact of blockchain and smart contracts on construction supply chain visibility.” Adv. Eng. Inf. 50 (4): 101444. https://doi.org/10.1016/j.aei.2021.101444.
Hsu, P. Y., M. Aurisicchio, and P. Angeloudis. 2019. “Risk-averse supply chain for modular construction projects.” Autom. Constr. 106 (Oct): 102898. https://doi.org/10.1016/j.autcon.2019.102898.
Hussein, M., A. Darko, A. E. E. Eltoukhy, and T. Zayed. 2022. “Sustainable logistics planning in modular integrated construction using multimethod simulation and Taguchi approach.” J. Constr. Eng. Manage. 148 (6): 04022022. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002273.
Hussein, M., A. E. E. Eltoukhy, A. Karam, I. A. Shaban, and T. Zayed. 2021. “Modelling in off-site construction supply chain management: A review and future directions for sustainable modular integrated construction.” J. Cleaner Prod. 310 (Aug): 127503. https://doi.org/10.1016/j.jclepro.2021.127503.
Hwang, B. G., M. Shan, and K. Y. Looi. 2018. “Key constraints and mitigation strategies for prefabricated prefinished volumetric construction.” J. Cleaner Prod. 183 (May): 183–193. https://doi.org/10.1016/j.jclepro.2018.02.136.
Lee, D., and S. Lee. 2021. “Digital twin for supply chain coordination in modular construction.” Appl. Sci. 11 (13): 5909. https://doi.org/10.3390/app11135909.
Lee, D., S. Lee, N. Masoud, M. S. Krishnan, and V. C. Li. 2021. “Integrated digital twin and blockchain framework to support accountable information sharing in construction projects.” Autom. Constr. 127 (Jul): 103688. https://doi.org/10.1016/j.autcon.2021.103688.
Li, X., W. Lu, F. Xue, L. Wu, R. Zhao, J. Lou, and J. Xu. 2022. “Blockchain-enabled IoT-BIM platform for supply chain management in modular construction.” J. Constr. Eng. Manage. 148 (2): 04021195. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002229.
Li, X., L. Wu, R. Zhao, W. Lu, and F. Xue. 2021. “Two-layer adaptive blockchain-based supervision model for off-site modular housing production.” Comput. Ind. 128 (Jun): 103437. https://doi.org/10.1016/j.compind.2021.103437.
Li, Z., G. Q. Shen, and X. Xue. 2014. “Critical review of the research on the management of prefabricated construction.” Habitat Int. 43 (Apr): 240–249. https://doi.org/10.1016/j.habitatint.2014.04.001.
Musa, M. F., M. R. Yusof, M. F. Mohammad, and N. Samsudin. 2016. “Towards the adoption of modular construction and prefabrication in the construction environment: A case study in Malaysia.” J. Eng. Appl. Sci. 11 (13): 8122–8131. http://www.arpnjournals.org/jeas/research_papers/rp_2016/jeas_0716_4572.pdf.
Nanayakkara, S., S. Perera, S. Senaratne, G. T. Weerasuriya, and H. M. N. D. Bandara. 2021. “Blockchain and smart contracts: A solution for payment issues in construction supply chains.” Informatics 8 (2): 36. https://doi.org/10.3390/informatics8020036.
Norta, A. 2016. Designing a smart-contract application layer for transacting decentralized autonomous organizations BT—Advances in computing and data sciences. Berlin: Springer.
O’Connor, J. T., W. J. O’Brien, and J. O. Choi. 2014. “Critical success factors and enablers for optimum and maximum industrial modularization.” J. Constr. Eng. Manage. 140 (6): 04014012. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000842.
O’Connor, J. T., W. J. O’Brien, and J. O. Choi. 2016. “Industrial project execution planning: Modularization versus stick-built.” Pract. Period. Struct. Des. Constr. 21 (1): 04015014. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000270.
Pan, X., B. Zhong, D. Sheng, X. Yuan, and Y. Wang. 2022. “Blockchain and deep learning technologies for construction equipment security information management.” Autom. Constr. 136 (Apr): 104186. https://doi.org/10.1016/j.autcon.2022.104186.
Pawar, M. K., P. Patil, M. Sharma, and M. Chalageri. 2021. “Secure and scalable decentralized supply chain management using Ethereum and IPFS platform.” In Proc., 2021 Int. Conf. on Intelligent Technologies (CONIT), 1–5. New York: IEEE.
Qian, X., and E. Papadonikolaki. 2021. “Shifting trust in construction supply chains through blockchain technology.” Eng. Constr. Archit. Manage. 28 (2): 584–602. https://doi.org/10.1108/ECAM-12-2019-0676.
Sheng, D., L. Ding, B. Zhong, P. E. D. Love, H. Luo, and J. Chen. 2020. “Construction quality information management with blockchains.” Autom. Constr. 120 (Dec): 103373. https://doi.org/10.1016/j.autcon.2020.103373.
Tatum, C. B., J. A. Vanegas, and J. M. Williams. 1986. Constructability improvement using prefabrication, preassembly, and modularization. Stanford, CA: Stanford Univ.
Tezel, A., P. Febrero, E. Papadonikolaki, and I. Yitmen. 2021. “Insights into blockchain implementation in construction: Models for supply chain management.” J. Manage. Eng. 37 (4): 1–19. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000939.
Thai, H.-T., T. Ngo, and B. Uy. 2020. “A review on modular construction for high-rise buildings.” Structures 28 (Dec): 1265–1290. https://doi.org/10.1016/j.istruc.2020.09.070.
Vujičić, D., D. Jagodić, and S. Ranđić. 2018. “Blockchain technology, bitcoin, and Ethereum: A brief overview.” In Proc., 2018 17th Int. Symp. Infoteh-Jahorina (Infoteh), 1–6. New York: IEEE.
Wan, P. K., L. Huang, and H. Holtskog. 2020. “Blockchain-enabled information sharing within a supply chain: A systematic literature review.” IEEE Access 8 (Feb): 49645–49656. https://doi.org/10.1109/ACCESS.2020.2980142.
Wang, J., P. Wu, X. Wang, and W. Shou. 2017. “The outlook of blockchain technology for construction engineering management.” Front. Eng. Manage. 4 (1): 67–75. https://doi.org/10.15302/J-FEM-2017006.
Wang, Z., H. Hu, J. Gong, X. Ma, and W. Xiong. 2019. “Precast supply chain management in off-site construction: A critical literature review.” J. Cleaner Prod. 232 (Sep): 1204–1217. https://doi.org/10.1016/j.jclepro.2019.05.229.
Wang, Z., T. Wang, H. Hu, J. Gong, X. Ren, and Q. Xiao. 2020. “Blockchain-based framework for improving supply chain traceability and information sharing in precast construction.” Autom. Constr. 111 (Mar): 103063. https://doi.org/10.1016/j.autcon.2019.103063.
Wu, H., B. Zhong, H. Li, J. Guo, and Y. Wang. 2021. “On-site construction quality inspection using blockchain and smart contracts.” J. Manage. Eng. 37 (6): 04021065. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000967.
Wu, L., W. Lu, R. Zhao, J. Xu, X. Li, and F. Xue. 2022. “Using blockchain to improve information sharing accuracy in the onsite assembly of modular construction.” J. Manage. Eng. 38 (3): 04022014. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001029.
Wuni, I. Y., and G. Q. Shen. 2020. “Critical success factors for modular integrated construction projects: A review.” Build. Res. Inf. 48 (7): 763–784. https://doi.org/10.1080/09613218.2019.1669009.
Yang, Y., M. Pan, and W. Pan. 2022. “Integrated offsite logistics scheduling approach for high-rise modular building projects.” J. Constr. Eng. Manage. 148 (6): 04022032. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002280.
Yang, Y., M. Pan, W. Pan, and Z. Zhang. 2021. “Sources of uncertainties in offsite logistics of modular construction for high-rise building projects.” J. Manage. Eng. 37 (3): 04021011. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000905.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 149Issue 1January 2023

History

Received: Dec 1, 2021
Accepted: Aug 12, 2022
Published online: Oct 29, 2022
Published in print: Jan 1, 2023
Discussion open until: Mar 29, 2023

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Dongmin Lee [email protected]
Assistant Professor, School of Architecture and Building Science, Chung-Ang Univ., Seoul 06974, Republic of Korea. Email: [email protected]
Leyang Wen, S.M.ASCE [email protected]
Ph.D. Student, Dept. of Civil and Environmental Engineering, Univ. of Michigan, 2350 Hayward St., G. G. Brown Bldg., Ann Arbor, MI 48109. Email: [email protected]
Associate Professor, Dept. of Civil and Environmental Engineering and Construction, Univ. of Nevada, 4505 S. Maryland Pkwy., Las Vegas, NV 89154. ORCID: https://orcid.org/0000-0003-3212-2304. Email: [email protected]
SangHyun Lee, M.ASCE [email protected]
Professor, Dept. of Civil and Environmental Engineering, Univ. of Michigan, 2350 Hayward St., G. G. Brown Bldg., Ann Arbor, MI 48109 (corresponding author). Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Transportation-Induced Impact on a Prefinished Volumetric Modular House Using Trailer Bogie: Case Study, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-14567, 150, 7, (2024).
  • Offsite Construction Supply Chain Challenges: An Integrated Overview, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-14444, 150, 7, (2024).
  • Secure and Formalized Blockchain-IPFS Information Sharing in Precast Construction from the Whole Supply Chain Perspective, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-13547, 150, 1, (2024).
  • Decision-Making Framework for Implementing Blockchain in Building Operations and Maintenance (O&M), Computing in Civil Engineering 2023, 10.1061/9780784485231.059, (493-500), (2024).
  • Exploring Critical Risk Factors in Volumetric Modular Construction: Fault Tree Analysis with Stakeholders' Perspectives on Probability and Impact, Journal of Architectural Engineering, 10.1061/JAEIED.AEENG-1608, 29, 4, (2023).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share