Technical Papers
Sep 22, 2023

Exploring Critical Risk Factors in Volumetric Modular Construction: Fault Tree Analysis with Stakeholders' Perspectives on Probability and Impact

Publication: Journal of Architectural Engineering
Volume 29, Issue 4

Abstract

Numerous benefits are delivered by the utilization of volumetric modular construction (VMC); however, it carries unique risks at different project stages, which is one of the significant reasons for its low adoption. To date, scant research has adequately examined VMC’s risks during projects. This study aims to address this knowledge gap by identifying and assessing critical risk factors (CRFs) within VMC from different stakeholder group perspectives in Australia and New Zealand (NZ). A survey of 110 VMC professionals from Australia and NZ, which examined 31 specific CRFs, was established via a literature review. The CRFs were divided into their associated VMC project stage: (1) design and planning (DP); (2) off-site manufacturing (OM); (3) transport and logistics (TL); and (4) on-site assembly (OA). Fault tree analysis (FTA) was then used to analyze the CRFs. The results indicate that the DP stage risks are the most significant since they could affect VMC's downstream stages. Essential CRFs at each stage were design freeze or change order issues, module geometry conflicts, size and weight restrictions, and dimensional and geometrical variabilities. To the best of the authors’ knowledge, this study represents a first attempt at analyzing VMC CRFs in the Australian and NZ construction industry. Overall, this study could contribute to enhancing VMC practices and furthering VMC's adoption as a sustainable and circular construction practice.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, and codes generated or used during the study appear in the published article.

References

Abas, N., and N. Blismas. 2021. “Identification of the hazards/risks involved in construction process for selected construction approaches in Malaysia.” J. Eng. Sci Technol. 16: 2571–2593.
Abdul Nabi, M., and I. El-adaway. 2021. “Understanding the key risks affecting cost and schedule performance of modular construction projects.” J. Manage. Eng. 37 (4). https://doi.org/10.1061/(ASCE)ME.1943-5479.0000917.
Ameyaw, E. E., and A. P. C. Chan. 2015. “Evaluation and ranking of risk factors in public–private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach.” Expert Syst. Appl. 42 (12): 5102–5116. https://doi.org/10.1016/j.eswa.2015.02.041.
Builtready. 2023. BuiltReady. Wellington, New Zealand: Building Performance.
Campanelli, P. 1996. “Floyd J. Fowler, Jr., ‘Improving survey questions: Design and evaluation’.” Public Opin. Q 38: 200.
Çetin, S., C. De Wolf, and N. Bocken. 2021. “Circular digital built environment: An emerging framework.” Sustainability 13 (11): 6348. https://doi.org/10.3390/su13116348.
Chatzimichailidou, M., and Y. Ma. 2022. “Using BIM in the safety risk management of modular construction.” Saf. Sci. 154: 105852. https://doi.org/10.1016/j.ssci.2022.105852.
Choi, J. O., X. B. Chen, and T. W. Kim. 2019. “Opportunities and challenges of modular methods in dense urban environment.” Int. J. Construct. Manage. 9 (2): 93–105. https://doi.org/10.1080/15623599.2017.1382093.
Chourasia, A., and S. Singhal. 2023. “Prefabricated volumetric modular construction: A review on current systems, challenges, and future prospects.” Pract. Period. Struct. Des. Constr. 28 (1): 1–16. https://doi.org/10.1061/PPSCFX.SCENG-1185.
Circle Economy. 2022. The circularity gap report 2022, 1–64. Amsterdam, Netherlands: Circle Economy.
Cochran, W. G. 1997. Cochran 1977 sampling techniques. 3rd ed. New York: Wiley.
Converse, J. M., and S. Presser. 1986. Survey questions: Handcrafting the standardized questionnaire. Quantitative applications in the social sciences, No. 07-001. Thousand Oaks, CA: Sage.
Dang, P., Z. Niu, S. Gao, L. Hou, and G. Zhang. 2020. “Critical factors influencing the sustainable construction capability in prefabrication of Chinese construction enterprises.” Sustainability 12 (21): 8996. https://doi.org/10.3390/su12218996.
Darko, A., A. P. C. Chan, Y. Yang, and M. O. Tetteh. 2020. “Building information modeling (BIM)-based modular integrated construction risk management – Critical survey and future needs.” Comput. Ind. 123: 103327. https://doi.org/10.1016/j.compind.2020.103327.
Davila Delgado, J. M., L. Oyedele, T. Beach, and P. Demian. 2020. “Augmented and virtual reality in construction: Drivers and limitations for industry adoption.” J. Constr. Eng. Manage. 146 (7): 1–17. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001844.
Dikmen, I., M. T. Birgonul, C. Anac, J. H. M. Tah, and G. Aouad. 2008. “Learning from risks: A tool for post-project risk assessment.” Autom. Constr. 18 (1): 42–50. https://doi.org/10.1016/j.autcon.2008.04.008.
Dongmin, L., W. Leyang, C. J. Ouk, and L. SangHyun. 2023. “Sensor-Integrated hybrid blockchain system for supply chain coordination in volumetric modular construction.” J. Constr. Eng. Manage. 149 (1): 4022147. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002427.
Du, J., H. Jing, D. Castro-Lacouture, and V. Sugumaran. 2020. “Multi-agent simulation for managing design changes in prefabricated construction projects.” Eng. Constr. Archit. Manage. 27 (1): 270–295. https://doi.org/10.1108/ECAM-11-2018-0524.
Ekanayake, E. M. A. C., G. Q. Shen, M. Kumaraswamy, and E. K. Owusu. 2021. “Critical supply chain vulnerabilities affecting supply chain resilience of industrialized construction in Hong Kong.” Eng. Constr. Archit. Manage. 28 (10): 3041–3059. https://doi.org/10.1108/ECAM-06-2020-0438.
Ezzeddine, A., and B. García de Soto. 2021. “Connecting teams in modular construction projects using game engine technology.” Autom. Constr. 132: 103887. https://doi.org/10.1016/j.autcon.2021.103887.
Fard, M. M., S. A. Terouhid, C. J. Kibert, and H. Hakim. 2017. “Safety concerns related to modular/prefabricated building construction.” Int. J. Inj. Contr. Saf. Promot. 24 (1): 10–23. https://doi.org/10.1080/17457300.2015.1047865.
Feldmann, F. G., H. Birkel, and E. Hartmann. 2022. “Exploring barriers towards modular construction – A developer perspective using fuzzy DEMATEL.” J. Cleaner Prod. 367: 133023. https://doi.org/10.1016/j.jclepro.2022.133023.
Gan, X. L., R. D. Chang, C. Langston, and T. Wen. 2019. “Exploring the interactions among factors impeding the diffusion of prefabricated building technologies: Fuzzy cognitive maps.” Eng. Constr. Archit. Manage. 26 (3): 535–553. https://doi.org/10.1108/ECAM-05-2018-0198.
Ginigaddara, B., S. Perera, Y. Feng, and P. Rahnamayiezekavat. 2021. “Offsite construction skills evolution: An Australian case study.” Constr. Innovation 22 (1): 41–56. https://doi.org/10.1108/CI-10-2019-0109.
Hong, J. K., G. Q. P. Shen, Z. D. Li, B. Y. Zhang, and W. Q. Zhang. 2018. “Barriers to promoting prefabricated construction in China: A cost-benefit analysis.” J. Cleaner Prod. 172: 649–660. https://doi.org/10.1016/j.jclepro.2017.10.171.
Hsu, P. Y., M. Aurisicchio, and P. Angeloudis. 2019. “Risk-averse supply chain for modular construction projects.” Autom. Constr. 106 (March): 102898. https://doi.org/10.1016/j.autcon.2019.102898.
Hsu, P.-Y., M. Aurisicchio, P. Angeloudis, and J. Whyte. 2020. “Understanding and visualizing schedule deviations in construction projects using fault tree analysis.” Eng. Constr. Archit. Manage. 27 (9): 2501–2522. https://doi.org/10.1108/ECAM-01-2020-0058.
Hwang, B. G., M. Shan, and K. Y. Looi. 2018. “Key constraints and mitigation strategies for prefabricated prefinished volumetric construction.” J. Cleaner Prod. 183: 183–193. https://doi.org/10.1016/j.jclepro.2018.02.136.
Hyun, K. C., S. Min, H. Choi, J. Park, and I. M. Lee. 2015. “Risk analysis using fault-tree analysis (FTA) and analytic hierarchy process (AHP) applicable to shield TBM tunnels.” Tunnelling Underground Space Technol. 49: 121–129. https://doi.org/10.1016/j.tust.2015.04.007.
IPCC (Intergovernmental Panel on Climate Change). 2021. Climate change 2021: The physical science basis. Geneva: Intergovernmental Panel on Climate Change.
Kaicheng, S., L. Xiaodong, C. Xinying, and Z. Zhihui. 2022. “Prefabricated construction process optimization based on rework risk.” J. Constr. Eng. Manage. 148 (6): 4022031. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002277.
Kamali, M., and K. Hewage. 2017. “Development of performance criteria for sustainability evaluation of modular versus conventional construction methods.” J. Cleaner Prod. 142: 3592–3606. https://doi.org/10.1016/j.jclepro.2016.10.108.
Kayhani, N., H. Taghaddos, A. Mousaei, S. Behzadipour, and U. Hermann. 2021. “Heavy mobile crane lift path planning in congested modular industrial plants using a robotics approach.” Autom. Constr. 122 (December 2020): 103508. https://doi.org/10.1016/j.autcon.2020.103508.
Khan, A. A., R. Yu, T. Liu, N. Gu, and J. Walsh. 2023. “Volumetric modular construction risks: A comprehensive review and digital-technology-coupled circular mitigation strategies.” Sustainability 15 (8), 7019. https://doi.org/10.3390/su15087019.
Khan, A., R. Yu, T. Liu, H. Guan, and E. Oh. 2022. “Drivers towards adopting modular integrated construction for affordable sustainable housing: A total interpretive structural modelling (TISM) method.” Buildings 12 (5): 637. https://doi.org/10.3390/buildings12050637.
Li, C. Z., X. Xu, G. Q. Shen, C. Fan, X. Li, and J. Hong. 2018. “A model for simulating schedule risks in prefabrication housing production: A case study of six-day cycle assembly activities in Hong Kong.” J. Cleaner Prod. 185: 366–381. https://doi.org/10.1016/j.jclepro.2018.02.308.
Li, Z., S. W. Zhang, Q. F. Meng, and X. Hu. 2021. “Barriers to the development of prefabricated buildings in China: A news coverage analysis.” Eng. Constr. Archit. Manage. 28 (10): 2884–2903. https://doi.org/10.1108/ECAM-03-2020-0195.
Liu, Q. J., G. Ye, and Y. B. Feng. 2020. “Workers’ safety behaviors in the off-site manufacturing plant.” Eng. Constr. Archit. Manage. 27 (3): 765–784. https://doi.org/10.1108/ECAM-03-2019-0136.
Luo, L. Z., G. Q. Shen, G. Y. Xu, Y. L. Liu, and Y. J. Wang. 2019. “Stakeholder-associated supply chain risks and their interactions in a prefabricated building project in Hong Kong.” J. Manage. Eng. 35 (2): 05018015. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000675.
Masood, R., and K. Roy. 2022. “Review on prefabricated building technology.” In Scope, Contemporary Research Topics, Work based learning 4: Technology. Otago, New Zealand: Otago Polytechnic Press.
McKinsey & Company. 2017. Reinventing construction: A route to higher productivity. New York: McKinsey Global Institute.
Modern Manufacturing Strategy. 2020. Make it happen: The Australian government’s modern manufacturing strategy. Canberra, Australia: Dept. of Industry, Science and Resources.
Monash University. 2017. Handbook for the design of modular structures. Melbourne, Australia: Monash University.
O’Grady, T., R. Minunno, H.-Y. Chong, and G. M. Morrison. 2021. “Design for disassembly, deconstruction and resilience: A circular economy index for the built environment.” Resour. Conserv. Recycl. 175: 105847. https://doi.org/10.1016/j.resconrec.2021.105847.
Obi, L., M. Arif, E. I. Daniel, O. T. Oladinrin, and J. S. Goulding. 2023. “Establishing underpinning concepts for integrating circular economy and offsite construction: A bibliometric review.” Built Environ. Project Asset Manage. 13 (1): 123–139. https://doi.org/10.1108/BEPAM-01-2022-0009.
OUP (Oxford University Press). 2015. Methodological frameworks and sampling in qualitative research, 3–26. Oxford, UK: OUP.
Peiris, P. A. N., F. K. P. Hui, T. Ngo, C. Duffield, and M. G. Garcia. 2023. ‘“Challenges in transport logistics for modular construction: A case study BT.” In Proc., 12th Int. Conf. on Structural Engineering and Construction Management, edited by R. Dissanayake, P. Mendis, K. Weerasekera, S. De Silva, S. Fernando, and C. Konthesingha, 501–510. Singapore: Springer.
Rahman, M. M. 2014. “Barriers of implementing modern methods of construction.” J. Manage. Eng. 30 (1): 69–77. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000173.
Randiwela, P., and S. Wijayaratne. 2017. “Determinants of perceived brand globalness: FMCG and Airline Services.” In Proc., 3rd Int. Conf. on Business, Economics, Management and Marketing. Oxford, UK: FLE Learning.
Rose, K. H. 2013. “A guide to the project management body of knowledge (PMBOK® guide)—fifth edition.” Project Manage. J. 3 (44): e1. https://doi.org/10.1002/pmj.21345.
Shahtaheri, Y., C. Rausch, J. West, C. Haas, and M. Nahangi. 2017. “Managing risk in modular construction using dimensional and geometric tolerance strategies automation in construction.” Autom. Constr. 83: 303–315, https://doi.org/10.1016/j.autcon.2017.03.011.
Sudman, S. 1976. Applied sampling/Seymour Sudman. Quantitative studies in social relations. New York: Academic Press.
Sun, Y., J. Wang, J. Wu, W. Shi, D. Ji, X. Wang, and X. Zhao. 2020. “Constraints hindering the development of high-rise modular buildings.” Appl. Sci. 10 (20): 7159. https://doi.org/10.3390/app10207159.
Sutrisna, M., and J. Goulding. 2019. “Managing information flow and design processes to reduce design risks in offsite construction projects.” Eng. Constr. Archit. Manage. 26 (2): 267–284. https://doi.org/10.1108/ECAM-11-2017-0250.
Tavakol, M., and R. Dennick. 2011. “Making sense of Cronbach’s alpha.” Int. J. Med. Educ. 2: 53–55. https://doi.org/10.5116/ijme.4dfb.8dfd.
Thorndike, R. M. 1995. “Book Review: Psychometric theory (3rd ed.) by Jum Nunnally and Ira Bernstein New York: McGraw-Hill, 1994, xxiv+752 pp.” Appl. Psychol. Meas. 19 (3): 303–305. https://doi.org/10.1177/014662169501900308.
Tsz Wai, C., P. Wai Yi, O. Ibrahim Olanrewaju, S. Abdelmageed, M. Hussein, S. Tariq, and T. Zayed. 2021. “A critical analysis of benefits and challenges of implementing modular integrated construction.” Int. J. Constr. Manage. 23 (4): 656–668. https://doi.org/10.1080/15623599.2021.1907525.
Ullah, F., S. M. E. Sepasgozar, M. J. Thaheem, and F. Al-Turjman. 2021. “Barriers to the digitalisation and innovation of Australian Smart Real Estate: A managerial perspective on the technology non-adoption.” Environ. Technol. Innovation 22: 101527. https://doi.org/10.1016/j.eti.2021.101527.
van der Ham, M., and R. Opdenakker. 2021. “Overcoming process-related barriers in modular high-rise building projects.” Int. J. Constr. Manage. 23 (10): 1779–1789. https://doi.org/10.1080/15623599.2021.2007593.
Wang, J., X. Li, S. Han, and M. Al-Hussein. 2023. “3D standard motion time-based ergonomic risk analysis for workplace design in modular construction.” Autom. Constr. 147: 104738. https://doi.org/10.1016/j.autcon.2022.104738.
Wu, P., Y. Xu, R. Jin, Q. Lu, D. Madgwick, and C. M. Hancock. 2019. “Perceptions towards risks involved in off-site construction in the integrated design & construction project delivery.” J. Cleaner Prod. 213: 899–914. https://doi.org/10.1016/j.jclepro.2018.12.226.
Wuni, I. Y., G. Q. Shen, R. Osei-Kyei, and S. Agyeman-Yeboah. 2020. “Modelling the critical risk factors for modular integrated construction projects.” Int. J. Constr. Manage. 22 (11): 2013–2026. https://doi.org/10.1080/15623599.2020.1763049.
Xu, Z., T. Zayed, and Y. Niu. 2020. “Comparative analysis of modular construction practices in mainland China, Hong Kong and Singapore.” J. Cleaner Prod. 245: 118861. https://doi.org/10.1016/j.jclepro.2019.118861.
Yang, Y., M. Pan, W. Pan, and Z. Q. Zhang. 2021. “Sources of uncertainties in offsite logistics of modular construction for high-rise building projects.” J. Manage. Eng. 37 (3): 04021011. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000905.
Yuan, M. Q., Z. F. Li, X. D. Li, and X. W. Luo. 2021. “Managing stakeholder-associated risks and their interactions in the life cycle of prefabricated building projects: A social network analysis approach.” J. Cleaner Prod. 323: 129102. https://doi.org/10.1016/j.jclepro.2021.129102.
Zhang, Z., and W. Pan. 2021. “Multi-criteria decision analysis for tower crane layout planning in high-rise modular integrated construction.” Autom. Constr. 127 (April): 103709. https://doi.org/10.1016/j.autcon.2021.103709.
Zhang, Z., Y. Tan, L. Shi, L. Hou, and G. Zhang. 2022. “Current state of using prefabricated construction in Australia.” Build. 12 (9): 1355. https://doi.org/10.3390/buildings12091355.

Information & Authors

Information

Published In

Go to Journal of Architectural Engineering
Journal of Architectural Engineering
Volume 29Issue 4December 2023

History

Received: Dec 21, 2022
Accepted: Aug 9, 2023
Published online: Sep 22, 2023
Published in print: Dec 1, 2023
Discussion open until: Feb 22, 2024

Permissions

Request permissions for this article.

Authors

Affiliations

Ayaz Ahmad Khan [email protected]
Univ. of South Australia, UniSA Creative, IVE: Australian Research Centre for Interactive and Virtual Environments, Adelaide, SA 5000, Australia (corresponding author). Email: [email protected]
Rongrong Yu [email protected]
Univ. of South Australia, UniSA Creative, IVE: Australian Research Centre for Interactive and Virtual Environments, Adelaide, SA 5000, Australia. Email: [email protected]
Univ. of South Australia, UniSA Creative, IVE: Australian Research Centre for Interactive and Virtual Environments, Adelaide, SA 5000, Australia. ORCID: https://orcid.org/0000-0002-5555-9165. Email: [email protected]
Tingting Liu [email protected]
School of Engineering and Built Environment, Griffith Univ., 1 Parklands Drive, Southport, Gold Coast, QLD 4222, Australia. Email: [email protected]
James Walsh [email protected]
Univ. of South Australia, UniSA STEM, IVE: Australian Research Centre for Interactive and Virtual Environments, Adelaide, SA 5000, Australia. Email: [email protected]
Samad Sepasgozar, M.ASCE [email protected]
School of Built Environment, Univ. of New South Wales, Sydney 2052, Australia. Email: [email protected]
Damien Crough [email protected]
Executive Chair, prefabAUS, Melbourne, Australia. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share