TECHNICAL PAPERS
Mar 1, 2005

Determination of Haul Distance and Direction in Mass Excavation

This article has a reply.
VIEW THE REPLY
Publication: Journal of Construction Engineering and Management
Volume 131, Issue 3

Abstract

Currently, construction professionals can easily determine the amount of cut and fill on a mass excavation project, but can only make an educated and intuitive guess as to the required minimum haul distances and the directions to move the earth. This paper develops a mathematical optimization model for the determination of these minimum haul distances and directions. The two-dimensional model presented uses linear programming. An example of how this generic model works is detailed in this paper. Necessary inputs are the cut and fill quantities and the location of these on the site. With this mathematical model, the quantity of earth hauled, the minimum haul distances, and the locations to haul the material are determined. The solution is then made into a vector diagram detailing the quantity and direction to move material that can be used by nontechnical personnel in the field. The formulation presented in this paper will assist construction professionals by providing a method to find an optimal solution to the mass earthmoving problem. A pilot user interface is tested to investigate the possible use of an automated input system to reduce input error.

Get full access to this article

View all available purchase options and get full access to this article.

References

Caterpillar (2000). Caterpillar performance handbook, 31st Ed., Caterpillar Inc., Peoria, Ill.
Christian, J., and Caldera, H. (1988). “Earthmoving cost optimization by operational research.” Can. J. Civ. Eng., 15(4), 679–684.
Easa, S. M. (1988). “Earthwork allocations with linear unit costs.” J. Constr. Eng. Manage., 114(4), 641–655.
Jayawardane, A. K. W., and Harris, F. C. (1990).“Further development of integer programming in earthwork optimization.” J. Constr. Eng. Manage., 116(1), 18–34.
Jayawardane, A. K. W., and Price, A. D. F. (1994a). “A new approach for optimizing earth moving operations. Part I.” Proc. Inst. Civ. Eng., Transp., 105(3), 195–207.
Jayawardane, A. K. W., and Price, A. D. F. (1994b).“A new approach for optimizing earth moving operations. Part 2.” Proc. Inst. Civ. Eng., Transp., 105(4), 249–258.
Peurifoy, R. L., and Schexnayder, C. J. (2002). Construction planning, equipment, and methods, 6th Ed., McGraw-Hill, New York.
Scharge, L. (1982), User’s manual for LINDO, Scientific Press, Palo Alto, Calif.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 131Issue 3March 2005
Pages: 302 - 309

History

Received: Jan 13, 2002
Accepted: Jun 10, 2004
Published online: Mar 1, 2005
Published in print: Mar 2005

Permissions

Request permissions for this article.

Authors

Affiliations

Jaeho Son
Director, CM Group, JINA Architects & Engineering Co., LTD, KFA Bldg 3F, 1581-13 Seocho-dong, Seocho-gu, Seoul 137-070, Korea. E-mail: [email protected]
Kris G. Mattila
Associate Professor, Dept. of Civil & Environmental Engineering, Michigan Technological Univ., Houghton, MI 49931.
Donald S. Myers
Graduate Student, Construction Management, Dept. of Civil Engineering, Univ. of Nevada Las Vegas, Las Vegas, NV 89154.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share