Safety and Serviceability of Reinforced Concrete Beam-Column Joints Supported by Shores and Reshores during Construction
Publication: Journal of Structural Engineering
Volume 142, Issue 7
Abstract
Reshoring makes a floor support its own weight and decreases the construction load in the lower levels. However, a significant concern regarding reshoring lies in its safety and serviceability when shores are replaced while the construction load of the upper levels is applied. To investigate this concern and compare the construction load in shores and reshores, reinforced concrete (RC) beam-column joints at early ages were tested in the laboratory and were also monitored at a construction site. The specimens at ages of 2 and 3 days showed a shear-compression failure, and the specimens at ages of 7 or more days showed sufficient flexural behaviors. The test also found that the beam-column joints have sufficient stiffness even at the earliest ages that the joint can be safely assumed to be fully restrained regardless of the concrete age. Analysis of the test results showed that reshoring at 5 days of concrete age is 55% safer than keeping the shores until the age of 28 days, and no serviceability problems were identified, such as deflection, deformation, or cracks under the expected construction loads. The safety and serviceability concerns were also addressed by the field monitoring of beam deflections and the strain of the longitudinal rebar in the beams. The maximum beam deflection was only , and the maximum rebar strain was only 3.6% of the yield strain. Field monitoring of the construction load showed that the load on the shores decreased by 50% after reshoring and was also 35% lower than the load on shores that have been kept. This result coincides well with the predicted values based on the simplified analysis recommended by code provisions.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
This research is supported by the grant (Code#’09 R&D A01) from the High-Tech Urban Development Program funded by the Ministry of Land, Infrastructure and Transport in Korea.
References
ACI (American Concrete Institute). (2005a). “Guide for shoring/reshoring of concrete multistory buildings.” ACI 347.2R-05, Farmington Hills, MI.
ACI (American Concrete Institute). (2005b). “Specifications for structural concrete.” ACI 301-10, Farmington Hills, MI.
ACI (American Concrete Institute). (2008). “Guide for modeling and calculating shrinkage and creep in hardened concrete.” ACI 209.2R-08, Farmington Hills, MI.
ACI (American Concrete Institute). (2014). “Building code requirements for structural concrete and commentary.” ACI 318-14, Farmington Hills, MI.
AIA (American Institute of Architects). (2014). “Cast-in-place concrete.” AIA MasterSpec Section 033000, Salt Lake City.
AIK (Architectural Institute of Korea). (2006). “Standard specification for building construction.” Seoul (in Korean).
ASTM. (2009). “Standard test methods for tensile testing of metallic materials.” ASTM E8/E8M-09, West Conshohocken, PA.
Fang, D., Zhu, H., Geng, C., and Liu, X. (2001). “On-site measurement of load distribution in reinforced concrete buildings during construction.” ACI Struct. J., 98(2), 157–163.
Gardner, N., and Fu, H. (1987). “Effects of high construction loads on the long-term deflections of flat slabs.” ACI Struct. J., 84(3), 349–360.
Grundy, P., and Kabaila, A. (1963). “Construction loads on slab with shored formwork in multistory buildings.” ACI J., 60(12), 1729–1738.
Kang, S., Eom, T., and Kim, J. (2013). “Reshoring effects on deflections of multi-shored flat plate systems under construction.” Struct. Eng. Mech., 45(4), 455–470.
Karayannis, C. G., and Chalioris, C. E. (2000). “Capacity of RC joints subjected to early-age cyclic loading.” J. Earthquake. Eng., 4(4), 479–509.
Kim, J. (2010). “Calculation of slab construction loads in multistory-shored RC structure by considering construction conditions.” J. Comput. Struct. Eng. Inst. Korea, 23(4), 49–59 (in Korean).
Kim, O., Kang, S., and Oh, J. (2008). “Field instrumentation of load variation of shoring in apartment under construction according to construction stage.” Daelim Tech. Rev., (1), 67–75 (in Korean).
Mosallam, K., and Chen, W. (1991). “Determining shoring loads for reinforced concrete construction.” ACI Struct. J., 88(3), 340–350.
Park, H., Hwang, H., Hong, G., Kim, J., and Kim, J. (2011). “Slab construction load affected by shore stiffness and concrete cracking.” ACI Struct. J., 108(6), 679–688.
Park, H., Hwang, H., Hong, G., Kim, Y., and Kim, J. (2012). “Immediate and long-term deflections of reinforced concrete slabs affected by early-age loading and low temperature.” ACI Struct. J., 109(3), 413–422.
Puente, I., Azkune, M., and Insausti, A. (2007). “Shore-slab interaction in multistory reinforced concrete buildings during construction: An experimental approach.” Eng. Struct., 29(5), 731–741.
Rosowsky, D., Stewart, M., and Khor, E. (2000). “Early-age loading and long-term deflections of reinforced concrete beams.” ACI Struct. J., 97(3), 517–524.
Stivaros, P. (2012). “Control of deflection in concrete slabs and effects of construction loads.” ACI, 284(17), 1–22.
Information & Authors
Information
Published In
Copyright
© 2016 American Society of Civil Engineers.
History
Received: May 14, 2015
Accepted: Dec 10, 2015
Published online: Feb 18, 2016
Published in print: Jul 1, 2016
Discussion open until: Jul 18, 2016
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.