Structural Assessment of Concrete Cable-Stayed Bridge after Replacement of Closure Segment: The Service Stage
Publication: Practice Periodical on Structural Design and Construction
Volume 25, Issue 3
Abstract
To deal with failure in the closure segment in an existing concrete cable-stayed bridge, a new strengthening method, called the replacement of closure segment (RCS), has emerged in recent years in China. Basically, the construction process of RCS includes removing the failed closure segment, then constructing a new one, and finally improving the connection between the new closure segment and the original and residual part of the main girder by some strengthening measures. To assess the concrete cable-stayed bridge strengthened by RCS, a field loading test was implemented, and several structural indexes were investigated, including deflection of the bridge deck, horizontal displacement of pylons, concrete stress of critical sections in the main girder, and natural vibration characteristics. The results show that the concrete cable-stayed bridge after RCS behaves very well. The measured values of these structural indexes are very consistent with the analytical ones and tend to be safer. Thus, the strength and stiffness of the bridge structure after RCS can satisfy the load-carrying capacity and serviceability requirements specified in its original design. RCS opens up a new way and provides a beneficial exploration for strengthening existing concrete cable-stayed bridges during their use lifetime.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
All data, models, and code generated or used during the study appear in the published article.
Acknowledgments
The study presented in this paper was sponsored by the Fundamental Research Funds for the Central Public Welfare Research Institutes (Grant 2018-9021). The financial supports are gratefully acknowledged. The author also thanks all bridge engineers for their work in the retrofit design and field data acquisition of the Yonghe Bridge.
References
China National Center for Quality Supervision and Inspection of Roads and Bridges. 2005. Inspection and assessment of the Yonghe Bridge in Tianjin. [In Chinese.] Beijing: Research Institute of Highway, Ministry of Transport.
Ding, Y., A. Li, J. Sun, and Y. Deng. 2009. “Experimental and analytical studies on static and dynamic characteristics of steel box girder for Runyang cable-stayed bridge.” Adv. Struct. Eng. 11 (4): 425–438. https://doi.org/10.1260/136943308785836781.
Li, H. 2009. “Temperature effect analysis for structural state estimation of Pc cable-stayed bridge.” [In Chinese.] J. Civ. Archit. Environ. Eng. 31 (5): 81–85.
Li, H. 2012. “Construction stage analysis on replacement of closure segment in prestressed concrete cable-stayed bridges.” [In Chinese.] J. Civ. Archit. Environ. Eng. 34 (1): 47–53.
Li, H., T. Fang, and S. Cheng. 2008. “Dynamic characteristics of the Yonghe Bridge in Tianjin after maintenance and strengthening.” [In Chinese.] In Proc., National Symp. on Strengthening, Retrofitting and Evaluation for Existing Bridges, 50–54. Beijing: China Communications Press.
Li, H., W. Li, and J. Zhang. 2009. “Rehabilitation and strengthening of Yonghe bridge in Tianjin.” [In Chinese.] World Bridges 37 (1): 53–56.
Li, H., W. Li, and J. Zhang. 2012. “Analysis on safety of removing the closure segment in a prestressed concrete cable-stayed bridge.” Procedia Eng. 31 (4): 464–473. https://doi.org/10.1016/j.proeng.2012.01.1053.
Li, Z., P. Li, Z. Jiang, and H. Wei. 2016. “Difference of bridge damping ratio under different excitations.” [In Chinese.] J. Vibr. Shock 35 (3): 62–67. https://doi.org/10.13465/j.cnki.jvs.2016.03.010.
MIDAS (Modeling, Integrated Design and Analysis Software). 2010. User’s manual for MIDAS Civil 2010. Beijing: MIDAS IT.
MOT of China (Ministry of Transport of the People’s Republic of China). 1985. Specifications for design of reinforced concrete and prestressed concrete highway bridge and culverts. [In Chinese.]. Beijing: China Communications Press.
MOT of China (Ministry of Transport of the People’s Republic of China). 1989. General specifications for design of highway bridges and culverts. [In Chinese.]. Beijing: China Communications Press.
MOT of China (Ministry of Transport of the People’s Republic of China). 2011. Specification for inspection and evaluation of load-bearing capacity of highway bridges. [In Chinese.]. Beijing: China Communications Press.
MOT of China (Ministry of Transport of the People’s Republic of China). 2015. Load test methods for highway bridge. [In Chinese.]. Beijing: China Communications Press.
Ren, W., Y. Lin, and X. Peng. 2007. “Field load tests and numerical analysis of Qingzhou cable-stayed bridge.” J. Bridge Eng. 12 (2): 261–270. https://doi.org/10.1061/(ASCE)1084-0702(2007)12:2(261).
Shanghai Tonghao Civil Engineering Consulting. 2012. Bridge, user’s manual, revision 3.0. China: Shanghai Tonghao Civil Engineering Consulting.
Shao, C., and H. Xie. 1995. “Construction of closure parts in cable-stayed side and main spans of the second Changjing River Bridge in Wuhan.” [In Chinese.] Bridge Constr. 25 (3): 54–57.
Wang, J. 2008. “Design and construction for strengthening of the Yonghe Bridge.” [In Chinese.] In Proc., 18th National Symp. on Bridge Engineering, 356–362. Beijing: China Communications Press.
Zanardo, G., H. Hao, Y. Xia and A. J. Deeks, 2006. “Stiffness assessment through modal analysis of an RC slab bridge before and after strengthening.” J. Bridge Eng. 11 (5): 590–601. https://doi.org/10.1061/(ASCE)1084-0702(2006)11:5(590).
Zhang, X., H. Lang, and Q. Sun. 2004. “Closure design of main bridge of Fumin bridge in Shenyang.” [In Chinese.] Supplement, Bridge Constr. 34 (S1): 11–13.
Zhu, W., and Z. Li. 2005. “Construction of closure segment at midspan of Weiliulu cable-stayed bridge over railway line in Jinan.” [In Chinese.] Bridge Constr. 35 (2): 67–69.
Information & Authors
Information
Published In
Copyright
©2020 American Society of Civil Engineers.
History
Received: Dec 3, 2019
Accepted: Mar 20, 2020
Published online: Jun 8, 2020
Published in print: Aug 1, 2020
Discussion open until: Nov 8, 2020
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.