Technical Papers
May 12, 2021

Pipeline Construction Cost Forecasting Using Multivariate Time Series Methods

Publication: Journal of Pipeline Systems Engineering and Practice
Volume 12, Issue 3

Abstract

Pipe material and labor costs constitute about 70% of pipeline construction costs. Pipe and labor costs are subject to considerable fluctuations over time. These fluctuations are problematic for cost estimation and bid preparation in pipeline projects, which are mostly large and long-term projects. The accurate prediction of pipe and labor costs is invaluable for cost estimators to prepare accurate bids and manage the cost contingencies. However, the existing literature does not take advantage of the leading indicators of pipeline construction cost time series to accurately forecast cost fluctuations in pipeline projects. The objective of this research is to identify the leading indicators of pipeline construction costs and develop multivariate time series models for forecasting cost fluctuations in pipeline projects. Nineteen potential leading indicators of pipe and labor costs were initially selected based on a comprehensive review of construction cost forecasting literature. The leading indicators were identified from this pool of potential leading indicators based on unit root tests and Granger causality tests. Multivariate time series models were developed based on the results of cointegration tests. Vector error correction (VEC) models were developed for the cointegrated variables, while vector autoregressive (VAR) models were developed for the non-cointegrated variables. Since multivariate time series models include information from the identified leading indicators, multivariate time series models are often expected to deliver more accurate forecasts than univariate time series models. The forecasting accuracies of multivariate time series models were compared with those of univariate time series models based on three common error measures: mean absolute prediction error (MAPE), root-mean-squared error (RMSE), and mean average error (MAE). The results show that multivariate time series models outperform univariate models for forecasting cost fluctuations in pipeline projects. The findings of this research contribute to the state of knowledge by identifying leading indicators of pipe and labor costs and developing multivariate time series models to forecast them. The multivariate time series models with leading indicators are more accurate than univariate models for forecasting cost fluctuations in pipeline projects. It is expected that the proposed multivariate time series forecasting models contribute to the enhancement of the theory and practice of pipeline construction cost forecasting and help cost engineers and investment planners to prepare more accurate bids, cost estimates, and budgets for pipeline projects.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code generated or used during the study are available in a repository online in accordance with funder data retention policies. The ENR data used in this study are available online in the ENR Construction Economics Archive (https://www.enr.com/economics/current_costs).

Acknowledgments

This research is based on work supported by the National Science Foundation under Grant No. 1926792.

References

Abediniangerabi, B., S. M. Shahandashti, N. Ahmadi, and B. Ashuri. 2017. “Empirical investigation of temporal association between architecture billings index and construction spending using time-series methods.” J. Constr. Eng. Manage. 143 (10): 04017080. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001391.
Akaike, H. 1974. “A new look at the statistical model identification.” IEEE Trans. Autom. Control 19 (6): 716–723. https://doi.org/10.1109/TAC.1974.1100705.
Anaman, K. A. 2003. “Can the construction industry pull the rest of the economy out of a recession? Evaluation of the causality links between the construction industry and the macro-economy in Brunei Darussalam.” In Applied economic analysis in Brunei Darussalam: Evaluation of economic growth and trade, microeconomic efficiency and analysis of socio-economic problems, 16–23. Bandar Seri Begawan, Brunei: Universiti Brunei Darussalam.
Ashuri, B., and J. Lu. 2010. “Time series analysis of ENR construction cost index.” J. Constr. Eng. Manage. 136 (11): 1227–1237. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000231.
Ashuri, B., and S. M. Shahandashti. 2012. “Quantifying the relationship between construction cost index (CCI) and macroeconomic factors in the United States.” In Vol. 14 of Proc., 48th ASC Annual Int. Conf. Birmingham, UK: Birmingham City Univ.
Ashuri, B., S. M. Shahandashti, and J. Lu. 2012a. “Empirical tests for identifying leading indicators of ENR construction cost index.” Construct. Manage. Econ. 30 (11): 917–927. https://doi.org/10.1080/01446193.2012.728709.
Ashuri, B., S. M. Shahandashti, and J. Lu. 2012b. “Is the information available from historical time series data on economic, energy, and construction market variables useful to explain variations in ENR construction cost index?” In Proc., Construction Research Congress 2012, 457–464. Reston, VA: ASCE.
Catani, P. S., and N. J. C. Ahlgren. 2017. “Combined Lagrange multiplier test for ARCH in vector autoregressive models.” Econom. Stat. 1 (Jan): 62–84. https://doi.org/10.1016/j.ecosta.2016.10.006.
Cheung, Y. W., and K. S. Lai. 1993. “Finite-sample sizes of Johansen’s likelihood ratio tests for cointegration.” Oxford Bull. Econ. Stat. 55 (3): 313–328. https://doi.org/10.1111/j.1468-0084.1993.mp55003003.x.
Dean, R. T., and W. T. Dunsmuir. 2016. “Dangers and uses of cross-correlation in analyzing time series in perception, performance, movement, and neuroscience: The importance of constructing transfer function autoregressive models.” Behav. Res. Methods 48 (2): 783–802. https://doi.org/10.3758/s13428-015-0611-2.
Faghih, S. A. M., and H. Kashani. 2018. “Forecasting construction material prices using vector error correction model.” J. Constr. Eng. Manage. 144 (8): 04018075. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001528.
FHWA (Federal Highway Administration). 2012. “Request for proposal: Index-based cost estimation with accuracy and precision analysis.” Accessed February 17, 2020. https://cms7.fhwa.dot.gov/research/projects/index-based-cost-estimation-procedures-accuracy-precision-analysis.
Flyvbjerg, B. 2014. “What you should know about megaprojects and why: An overview.” Project Manage. J. 45 (2): 6–19. https://doi.org/10.1002/pmj.21409.
Granger, C. W. 1969. “Investigating causal relations by econometric models and cross-spectral methods.” Econometrica 37 (3): 424–438. https://doi.org/10.2307/1912791.
Hafner, C. M., and H. Herwartz. 2009. “Testing for linear vector autoregressive dynamics under multivariate generalized autoregressive heteroskedasticity.” Stat. Neerl. 63 (3): 294–323. https://doi.org/10.1111/j.1467-9574.2009.00424.x.
Ibrahim, M. H. 2000. “Cointegration and Granger causality tests of stock price and exchange rate interactions in Malaysia.” ASEAN Econ. Bull. 17 (1): 36–47. https://doi.org/10.1355/AE17-1D.
Jebb, A. T., L. Tay, W. Wang, and Q. Huang. 2015. “Time series analysis for psychological research: Examining and forecasting change.” Front. Psychol. 6 (Jun): 727. https://doi.org/10.3389/fpsyg.2015.00727.
Johansen, S. 1988. “Statistical analysis of cointegration vectors.” J. Econ. Dyn. Control 12 (2–3): 231–254. https://doi.org/10.1016/0165-1889(88)90041-3.
Johansen, S. 1995. Likelihood-based inference in cointegrated vector autoregressive models. Oxford, UK: Oxford University Press.
Johansen, S., and K. Juselius. 1990. “Maximum likelihood estimation and inference on cointegration—With applications to the demand for money.” Oxford Bull. Econ. Stat. 52 (2): 169–210. https://doi.org/10.1111/j.1468-0084.1990.mp52002003.x.
Lowe, D. J., M. W. Emsley, and A. Harding. 2006. “Predicting construction cost using multiple regression techniques.” J. Constr. Eng. Manage. 132 (7): 750–758. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:7(750).
Matsuura, T., S. Duling, B. Spiller, and G. Simpson. 2010. “Managing project budget expectations through the monitoring and reporting of pipeline material costs.” In Proc., Pipelines 2010: Climbing New Peaks to Infrastructure Reliability: Renew, Rehab, and Reinvest, 1514–1522. Reston, VA: ASCE.
Memon, A. H., I. A. Rahman, M. Akram, and N. M. Ali. 2014. “Significant factors causing time overrun in construction projects of Peninsular Malaysia.” Modern Appl. Sci. 8 (4): 16.
Osterwald-Lenum, M. 1992. “A note with quantiles of the asymptotic distribution of the maximum likelihood cointegration rank test statistics.” Oxford Bull. Econ. Stat. 54 (3): 461–472. https://doi.org/10.1111/j.1468-0084.1992.tb00013.x.
Pfaff, B. 2008. Analysis of integrated and cointegrated time series with R. New York: Springer.
Rui, Z., P. A. Metz, and G. Chen. 2012. “An analysis of inaccuracy in pipeline construction cost estimation.” Int. J. Oil Gas Coal Technol. 5 (1): 29–46. https://doi.org/10.1504/IJOGCT.2012.044176.
Rui, Z., P. A. Metz, D. B. Reynolds, G. Chen, and X. Zhou. 2011a. “Historical pipeline construction cost analysis.” Int. J. Oil Gas Coal Technol. 4 (3): 244–263. https://doi.org/10.1504/IJOGCT.2011.040838.
Rui, Z., P. A. Metz, D. B. Reynolds, G. Chen, and X. Zhou. 2011b. “Regression models estimate pipeline construction costs.” Oil Gas J. 109 (14): 120–127.
Shahandashti, S. M., and B. Ashuri. 2013. “Forecasting Engineering News-Record construction cost index using multivariate time series models.” J. Constr. Eng. Manage. 139 (9): 1237–1243. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000689.
Shahandashti, S. M., and B. Ashuri. 2016. “Highway construction cost forecasting using vector error correction models.” J. Manage. Eng. 32 (2): 04015040. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000404.
Shumway, R. H., and D. S. Stoffer. 2017. Time series analysis and its applications. New York: Springer.
Touran, A., and R. Lopez. 2006. “Modeling cost escalation in large infrastructure projects.” J. Constr. Eng. Manage. 132 (8): 853–860. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:8(853).
Wong, J. M., and S. T. Ng. 2010. “Forecasting construction tender price index in Hong Kong using vector error correction model.” Construct. Manage. Econ. 28 (12): 1255–1268. https://doi.org/10.1080/01446193.2010.487536.
Wooldridge, J. M. 2016. Introductory econometrics: A modern approach. Toronto: Nelson Education.

Information & Authors

Information

Published In

Go to Journal of Pipeline Systems Engineering and Practice
Journal of Pipeline Systems Engineering and Practice
Volume 12Issue 3August 2021

History

Received: Jul 13, 2020
Accepted: Dec 14, 2020
Published online: May 12, 2021
Published in print: Aug 1, 2021
Discussion open until: Oct 12, 2021

Permissions

Request permissions for this article.

Authors

Affiliations

Graduate Student, Dept. of Civil Engineering, Univ. of Texas at Arlington, 416 S. Yates St., Arlington, TX 76010 (corresponding author). ORCID: https://orcid.org/0000-0002-2681-2715. Email: [email protected]
Postdoctoral Research Fellow, Dept. of Civil Engineering, Univ. of Texas at Arlington, 416 S. Yates St., Arlington, TX 76010. ORCID: https://orcid.org/0000-0002-6848-1125. Email: [email protected]
Mohsen Shahandashti, M.ASCE [email protected]
Assistant Professor, Dept. of Civil Engineering, Univ. of Texas at Arlington, 416 S. Yates St., Arlington, TX 76010. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share