Abstract

The visibility of material status information is vital to effective decision-making and improving supply chain performance. Information technologies (IT) have been developed to improve visibility through information sharing in the supply chain. However, effective use of shared information for actionable decision-making requires enablers to achieve performance gains. Despite investment in visibility, knowledge about enablers that improve effective information use for the supply chain is largely missing from the construction body of knowledge. This research identified and defined 32 enablers that support effective use of information shared using IT on industrial projects during detailed design, procurement, and construction. These enablers were identified and defined with the aid of a panel of industry experts using structured workshops and qualitative content analysis. Their definition identifies essential capabilities necessary to benefit from investments in improved visibility. Further investigation via survey was conducted to evaluate the enablers’ ability to impact projects and their frequency of competent execution on projects. The analysis of the survey responses to the enablers’ ability to impact projects validated criticality 23 of the 32 enablers used for the survey. The analysis of the frequency of competent execution responses shows that 27 of 32 enablers are competently executed less than frequently on projects, suggesting structural limits to investments in visibility. This study advances our understanding of necessary investment in capabilities or specific enablers that leverage concomitant investments in IT. As such, the study provides specific guidance to practitioners in the industrial construction supply chain and provides an expanded basis for future measurement and study by academia.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

The data generated or analyzed during the study are available from the corresponding author by request.

Acknowledgments

This research was sponsored by the Construction Industry Institute (CII). The authors would like to thank the industry expert panel and the survey respondents for participating in this research effort.

References

Abidin, N. A. Z., and B. Ingirige. 2018. “The dynamics of vulnerabilities and capabilities in improving resilience within Malaysian construction supply chain.” Constr. Innovation 18 (4): 412–432. https://doi.org/10.1108/CI-09-2017-0079.
Akcay, E. C., S. Ergan, and D. Arditi. 2017. “Modeling information flow in the supply chain of structural steel components.” J. Civ. Eng. Manage. 23 (6): 753–764. https://doi.org/10.3846/13923730.2017.1281841.
Anumba, C. J., A. Akanmu, and J. Messner. 2010. “Towards a cyber-physical systems approach to construction.” In Construction research congress 2010: Innovation for reshaping construction practice, 528–537. Reston, VA: ASCE.
Aram, S., C. Eastman, and R. Sacks. 2013. “Requirements for BIM platforms in the concrete reinforcement supply chain.” Autom. Constr. 35: 1–17. https://doi.org/10.1016/j.autcon.2013.01.013.
Bhattacharya, S., K. S. Momaya, and K. C. Iyer. 2020. “Benchmarking enablers to achieve growth performance: A conceptual framework.” Benchmarking: Int. J. 27 (4): 1475–1501. https://doi.org/10.1108/BIJ-08-2019-0376.
Caldas, C. H., C. L. Menches, P. M. Reyes, L. Navarro, and D. M. Vargas. 2014. “Materials management practices in the construction industry.” Pract. Period. Struct. Des. Constr. 20 (3): 04014039. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000238.
Chan, A. P., A. Darko, E. E. Ameyaw, and D.-G. Owusu-Manu. 2016. “Barriers affecting the adoption of green building technologies.” J. Manage. Eng. 33 (3): 04016057. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000507.
Chen, Q., B. T. Adey, C. Haas, and D. M. Hall. 2020a. “Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies.” In Construction innovation. Bingley, UK: Emerald Publishing.
Chen, Q., D. M. Hall, B. T. Adey, and C. T. Haas. 2020b. “Identifying enablers for coordination across construction supply chain processes: A systematic literature review.” In Engineering, construction and architectural management. Bingley, UK: Emerald Publishing.
Choi, J. O., B. K. Shrestha, Y. H. Kwak, and J. S. Shane. 2020. “Critical success factors and enablers for facility design standardization of capital projects.” J. Manage. Eng. 36 (5): 04020048. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000788.
Christopher, M., and H. Lee. 2004. “Mitigating supply chain risk through improved confidence.” Int. J. Phys. Distrib. Logist. Manage. 34 (5): 388–396. https://doi.org/10.1108/09600030410545436.
CII (Construction Industry Institute). 2013. Advanced work packaging: Design through workface execution, 1–40. Austin, TX: CII.
CII (Construction Industry Institute). 2016. Effective project alignment for construction success, 135. Austin, TX: CII.
Dallasega, P., E. Rauch, and C. Linder. 2018. “Industry 4.0 as an enabler of proximity for construction supply chains: A systematic literature review.” Comput. Ind. 99 (Aug): 205–225. https://doi.org/10.1016/j.compind.2018.03.039.
Dharmapalan, V., and W. J. O’Brien. 2018. “Benefits and challenges of automated materials technology in industrial construction projects.” Proc. Inst. Civ. Eng. Smart Infrastruct. Constr. 171 (4): 144–157. https://doi.org/10.1680/jsmic.19.00009.
Dharmapalan, V., W. J. O’Brien, and D. Morrice. 2021a. “Defining supply chain visibility for industrial construction projects.” Front. Built Environ. 7: 1–16. https://doi.org/10.3389/fbuil.2021.651294.
Dharmapalan, V., W. J. O’Brien, D. Morrice, and M. Jung. 2021b. “Assessment of visibility in industrial construction projects: A viewpoint from supply chain stakeholders.” Constr. Innovation 21 (4): 782–799. https://doi.org/10.1108/CI-07-2020-0114.
Dumont, P. R., G. E. Gibson, Jr., and J. R. Fish. 1997. “Scope management using project definition rating index.” J. Eng. Manage. 13 (5): 54–60. https://doi.org/10.1061/(ASCE)0742-597X(1997)13:5(54).
Ekanayake, E., G. Shen, and M. M. Kumaraswamy. 2020a. “Critical capabilities of improving supply chain resilience in industrialized construction in Hong Kong.” Eng. Constr. Archit. Manage. 28 (10): 3236–3260. https://doi.org/10.1108/ECAM-05-2020-0295.
Ekanayake, E., G. Q. Shen, and M. M. Kumaraswamy. 2020b. “Identifying supply chain capabilities of construction firms in industrialized construction.” Prod. Plann. Control 32 (4): 303–321. https://doi.org/10.1080/09537287.2020.1732494.
El-Sabek, L. M., and B. Y. McCabe. 2018. “Framework for managing integration challenges of last planner system in IMPs.” J. Constr. Eng. Manage. 144 (5): 04018022. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001468.
Ergen, E., and B. Akinci. 2008. “Formalization of the flow of component-related information in precast concrete supply chains.” J. Constr. Eng. Manage. 134 (2): 112–121. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:2(112).
Ergen, E., B. Akinci, and R. Sacks. 2007a. “Life-cycle data management of engineered-to-order components using radio frequency identification.” Adv. Eng. Inf. 21 (4): 356–366. https://doi.org/10.1016/j.aei.2006.09.004.
Ergen, E., B. Akinci, and R. Sacks. 2007b. “Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS.” Autom. Constr. 16 (3): 354–367. https://doi.org/10.1016/j.autcon.2006.07.004.
Fellows, R. F., and A. M. Liu. 2015. Research methods for construction. Chichester, UK: Wiley.
Gao, S., and S. P. Low. 2014. Vol. 10 of Lean construction management, 978–981. Singapore: Springer.
Gebretekle, Y. T., D. W. Kamau, M. Raoufi, and A. R. Fayek. 2021. “Digitalization opportunities road mapping tool: A framework to assess digitalization opportunities in construction organizations.” Can. J. Civ. Eng. 49 (2): 171–182. https://doi.org/10.1139/cjce-2020-0762.
Gibson, G. E., and D. A. Whittington. 2010. “Charrettes as a method for engaging industry in best practices research.” J. Civ. Eng. Manage. 136 (1): 66–75. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000079.
Gong, J., and M. Azambuja. 2013. “Visualizing construction supply chains with google cloud computing tools.” In ICSDEC 2012: Developing the frontier of sustainable design, engineering, and construction. Reston, VA: ASCE.
Gosling, J., D. R. Towill, M. M. Naim, and A. R. Dainty. 2015. “Principles for the design and operation of engineer-to-order supply chains in the construction sector.” Prod. Plann. Control 26 (3): 203–218.
Grzybowska, K. 2012. “Sustainability in the supply chain: Analysing the enablers.” In Environmental issues in supply chain management, 25–40. Berlin: Springer.
Guerra, B. C., and F. Leite. 2020. “Bridging the gap between engineering and construction 3D models in support of advanced work packaging.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (3): 04520029. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000419.
Hadidi, L., S. Assaf, and A. Alkhiami. 2017. “A systematic approach for ERP implementation in the construction industry.” J. Civ. Eng. Manage. 23 (5): 594–603. https://doi.org/10.3846/13923730.2016.1215348.
Hall, D. M., A. Algiers, and R. E. Levitt. 2018. “Identifying the role of supply chain integration practices in the adoption of systemic innovations.” J. Manage. Eng. 34 (6): 04018030. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000640.
Hinkka, V. 2013. Implementation of RFID tracking across the entire supply chain. Espoo, Finland: Aalto Univ.
Irizarry, J., E. Karan, and F. Jalaei. 2013. “Integrating BIM and GIS to improve the visual monitoring of construction supply chain management.” Autom. Constr. 31 (May): 241–254. https://doi.org/10.1016/j.autcon.2012.12.005.
Kaming, P., G. Holt, and S. Kometa. 1998. “Severity diagnosis of productivity problems—A reliability analysis.” Int. J. Project Manage. 16 (2): 107–113. https://doi.org/10.1016/S0263-7863(97)00036-7.
Kan, C., and C. J. Anumba. 2019. “Digital twins as the next phase of cyber-physical systems in construction.” In Computing in civil engineering 2019: Data, sensing, and analytics, 256–264. Reston, VA: ASCE. https://doi.org/10.1061/980784482438.033.
Kang, Y., W. J. O’Brien, J. Dai, S. P. Mulva, S. P. Thomas, R. E. Chapman, and D. Butry. 2013a. “Interaction effects of information technologies and best practices on construction project performance.” J. Constr. Eng. Manage. 139 (4): 361–371. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000627.
Kang, Y., W. J. O’Brien, and S. P. Mulva. 2013b. “Value of IT: Indirect impact of IT on construction project performance via best practices.” Autom. Constr. 35 (Nov): 383–396. https://doi.org/10.1016/j.autcon.2013.05.011.
Kang, Y., W. J. O’Brien, and J. T. O’Connor. 2015. “Information-integration maturity model for the capital projects industry.” J. Manage. Eng. 31 (4): 04014061. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000274.
Kirppendorff, K. 2004. Content analysis: An introduction to its methodology. 2nd ed. Thousand Oaks, CA: SAGE.
Lee, J., J. Song, K. Oh, and N. Gu. 2013. “Information life-cycle management with RFID for material control on construction sites.” Adv. Eng. Inf. 27 (1): 108–119. https://doi.org/10.1016/j.aei.2012.11.004.
Li, H., G. Chan, J. K. W. Wong, and M. Skitmore. 2016. “Real-time locating systems applications in construction.” Autom. Constr. 63 (Mar): 37–47. https://doi.org/10.1016/j.autcon.2015.12.001.
Liu, Y., S. Van Nederveen, and M. Hertogh. 2017. “Understanding effects of BIM on collaborative design and construction: An empirical study in China.” Int. J. Project Manage. 35 (4): 686–698. https://doi.org/10.1016/j.ijproman.2016.06.007.
Mao, C., Q. Shen, W. Pan, and K. Ye. 2015. “Major barriers to off-site construction: The developer’s perspective in China.” J. Manage. Eng. 31 (3): 04014043. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000246.
Mello, M. H., J. O. Strandhagen, and E. Alfnes. 2015. “Analyzing the factors affecting coordination in engineer-to-order supply chain.” Int. J. Oper. Prod. Manage. 35 (7): 1005–1031. https://doi.org/10.1108/IJOPM-12-2013-0545.
O’Connor, J. T., W. J. O’Brien, and J. O. Choi. 2014. “Critical success factors and enablers for optimum and maximum industrial modularization.” J. Constr. Eng. Manage. 140 (6): 04014012. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000842.
Pan, W., A. G. Gibb, and A. R. Dainty. 2012. “Strategies for integrating the use of off-site production technologies in house building.” J. Constr. Eng. Manage. 138 (11): 1331–1340. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000544.
Patton, M. Q. 2014. Qualitative research & evaluation methods: Integrating theory and practice. Los Angeles, CA: SAGE.
Rahman, M. M. 2013. “Barriers of implementing modern methods of construction.” J. Manage. Eng. 30 (1): 69–77. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000173.
Ramsey, F., and D. Schafer. 2012. The statistical sleuth: A course in methods of data analysis. Boston: Cengage Learning.
Saldaňa, J. 2009. The coding manual for qualitative researchers, 3. Lontoo: SAGE.
Salganik, M. J., and D. D. Heckathorn. 2004. “Sampling and estimation in hidden populations using respondent-driven sampling.” Sociological Methodol. 34 (1): 193–240. https://doi.org/10.1111/j.0081-1750.2004.00152.x.
Sardroud, J. 2012. “Influence of RFID technology on automated management of construction materials and components.” Scientia Iranica 19 (3): 381–392. https://doi.org/10.1016/j.scient.2012.02.023.
Shi, Q., X. Ding, J. Zuo, and G. Zillante. 2016. “Mobile Internet based construction supply chain management: A critical review.” Autom. Constr. 72 (Dec): 143–154. https://doi.org/10.1016/j.autcon.2016.08.020.
Shrout, P. E., and J. L. Fleiss. 1979. “Intraclass correlations: Uses in assessing rater reliability.” Psychol. Bull. 86 (2): 420–428. https://doi.org/10.1037/0033-2909.86.2.420.
Sullivan, J. J., M. El Asmar, and K. T. Sullivan. 2019. “Consensus-building workshops to uncover new market entry decision factors for the sheet metal engineering and construction industry.” J. Manage. Eng. 35 (2): 04019001. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000679.
Vorster, M. C., S. A. Magrogan, and B. W. McNeil. 1998. PEpC: A breakthrough project delivery system that improves performance by reforming owner, contractor, supplier relationships. Austin, TX: Construction Industry Institute.
Wang, J., W. Shou, X. Wang, and H.-L. Chi. 2015. “An integrated approach for progress tracking in liquefied natural gas construction.” In Lecture notes in computer science, edited by Y. Luo, 259–267. Cham, Switzerland: Springer.
Wong, C., H. Skipworth, J. Godsell, and N. Achimugu. 2012. “Towards a theory of supply chain alignment enablers: A systematic literature review.” Supply Chain Manage. Int. J. 17 (4): 419–437. https://doi.org/10.1108/13598541211246567.
Young, D., C. Haas, P. Goodrum, and C. Caldas. 2011. “Improving construction supply network visibility by using automated materials locating and tracking technology.” J. Constr. Eng. Manage. 137 (11): 976–984. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000364.
Zhong, R. Y., Y. Peng, F. Xue, J. Fang, W. Zou, H. Luo, S. T. Ng, W. Lu, G. Q. Shen, and G. Q. Huang. 2017. “Prefabricated construction enabled by the internet-of-things.” Autom. Constr. 76 (Apr): 59–70. https://doi.org/10.1016/j.autcon.2017.01.006.

Information & Authors

Information

Published In

Go to Journal of Management in Engineering
Journal of Management in Engineering
Volume 38Issue 4July 2022

History

Received: Oct 14, 2021
Accepted: Feb 1, 2022
Published online: Mar 26, 2022
Published in print: Jul 1, 2022
Discussion open until: Aug 26, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Postdoctoral Scholar, Dept. of Civil and Environmental Engineering, California Polytechnic State Univ., Bldg. 13, Room 266, San Luis Obispo, CA 93407 (corresponding author). ORCID: https://orcid.org/0000-0003-1235-460X. Email: [email protected]
Professor, Dept. of Civil, Architectural and Environmental Engineering, Univ. of Texas at Austin, 301 E. Dean Keeton St., Austin, TX 78712-1094. ORCID: https://orcid.org/0000-0002-3366-3201. Email: [email protected]
Professor, Dept. of Information, Risk, and Operations Management, Univ. of Texas at Austin, 2110 Speedway, B6000, Austin, TX 78705. ORCID: https://orcid.org/0000-0001-8750-3820. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share