Online Planning and Management of Design Coordination Tasks with BIM: Challenges and Opportunities

Publication: Journal of Management in Engineering
Volume 38, Issue 3

Abstract

While cloud-based collaborative building design processes have become commonplace, colocated meetings remain a central and integral part of the management of such processes in the construction industry. The restrictions on colocated meetings due to the Covid-19 pandemic have therefore created challenges for the management of building design. This study sought to develop an alternative method for design coordination in a cloud-based Building Information Modeling (BIM) environment, which reduces the need for such meetings. This was also seen as an opportunity to improve the way design coordination is currently managed in the construction industry, by changing several practices that for a long time have been assumed to be the default choice. It was found that online design coordination requires a more structured and formal approach and the definition of design tasks at a much higher level of detail or granularity than is currently common. There is consequently a need for a systematic process and supporting tools to correctly plan and effectively control the execution of a larger number of individual design tasks. A suitable method has been defined for online design coordination, which incorporates tools such as resource leveling and four-dimensional BIM that have not previously been used in this context. The method was successfully implemented in a real project, highlighting its feasibility and the ability to reduce the need for colocated meetings, while at the same time improving the design process.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

References

Alhava, O., E. Laine, and A. Kiviniemi. 2015. “Intensive big room process for co-creating value in legacy construction projects.” J. Inf. Technol. Constr. 20: 146–158.
Allen, I. E., and C. A. Seaman. 2007. “Likert scales and data analyses.” Qual. Prog. 40 (7): 64–65.
Alreshidi, E., M. Mourshed, and Y. Rezgui. 2018. “Requirements for cloud-based BIM governance solutions to facilitate team collaboration in construction projects.” Requirements Eng. 23 (1): 1–31. https://doi.org/10.1007/s00766-016-0254-6.
Antwi-Afari, M. F., H. Li, E. A. Pärn, and D. J. Edwards. 2018. “Critical success factors for implementing building information modelling (BIM): A longitudinal review.” Autom. Constr. 91 (Jul): 100–110. https://doi.org/10.1016/j.autcon.2018.03.010.
Azhar, S., I. Ahmad, and M. K. Sein. 2009. “Action research as a proactive research method for construction engineering and management.” J. Constr. Eng. Manage. 136 (1): 87–98. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000081.
Ballard, G. 1997. “Lookahead planning: The missing link in production control.” In Proc., 5th Annual Conf. of the Int. Group for Lean Construction. Nathan, QLD: Griffith Univ.
Blanchard, A. L. 2021. “The effects of COVID-19 on virtual working within online groups.” Group Process. Intergroup Rel. 24 (2): 290–296. https://doi.org/10.1177/1368430220983446.
Blanchard, A. L., L. E. Caudill, and L. S. Walker. 2020. “Developing an entitativity measure and distinguishing it from antecedents and outcomes within online and face-to-face groups.” Group Process. Intergroup Rel. 23 (1): 91–108. https://doi.org/10.1177/1368430217743577.
Blanchard, A. L., and A. McBride. 2020. “Putting the ‘Group’ in group meetings: Entitativity in face-to-face and online meetings.” In Managing meetings in organizations. Bingley, UK: Emerald Publishing Limited.
Bølviken, T., B. Gullbrekken, and K. Nyseth. 2010. “Collaborative design management.” In Proc., 18th Annual Conf. of the Int. Group for Lean Construction. Haifa, Israel: Technion—Israel Institute of Technology.
Boton, C., S. Kubicki, and G. Halin. 2015. “The challenge of level of development in 4D/BIM simulation across AEC project lifecyle. A case study.” Procedia Eng. 123: 59–67. https://doi.org/10.1016/j.proeng.2015.10.058.
Dave, B., E. Pikas, H. Kerosuo, and T. Mäki. 2015. “ViBR—Conceptualising a virtual big room through the framework of people, processes and technology.” Procedia Econ. Finance 21: 586–593. https://doi.org/10.1016/S2212-5671(15)00216-6.
DSMweb.org. 2020. “Excel macros for partitioning and simulation.” Accessed September 28, 2020. https://dsmweb.org/excel-macros-for-partitioning-und-simulation.
Fosse, R., and G. Ballard. 2016. “Lean design management in practice with the last planner system.” In Proc., 24th Annual Conf. of the Int. Group for Lean Construction. Boston: International Group for Lean Construction.
Gebala, D. A., and S. D. Eppinger. 1991. “Methods for analyzing design procedures.” In Proc., ASME 3rd Int. Conf. on Design Theory and Methodology, 227–233. New York: Design Engineering Division, ASME.
Getuli, V., P. Capone, A. Bruttini, and S. Isaac. 2020. “BIM-based immersive virtual reality for construction workspace planning: A safety-oriented approach.” Autom. Constr. 114 (Jun): 103160. https://doi.org/10.1016/j.autcon.2020.103160.
Hartmann, T., J. Gao, and M. Fischer. 2008. “Areas of application for 3D and 4D models on construction projects.” J. Constr. Eng. Manage. 134 (10): 776–785. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:10(776).
ISO. 2018. Organization of information about construction works—Information management using building information modeling—Part 2: Delivery phase of assets. ISO 19650-2. Geneva, Switzerland: ISO.
Jacob, J., and K. Varghese. 2018. “A framework for ad hoc information management for the building design process.” Eng. Constr. Archit. Manage. 25 (8): 1034–1052. https://doi.org/10.1108/ECAM-06-2017-0097.
Knotten, V., O. Lædre, and G. K. Hansen. 2017. “Building design management—Key success factors.” Archit. Eng. Des. Manage. 13 (6): 479–493. https://doi.org/10.1080/17452007.2017.1345718.
Knotten, V., F. Svalestuen, G. K. Hansen, and O. Lædre. 2015. “Design management in the building process—A review of current literature.” Procedia Econ. Finance 21: 120–127. https://doi.org/10.1016/S2212-5671(15)00158-6.
Kubicki, S., A. Guerriero, L. Schwartz, E. Daher, and B. Idris. 2019. “Assessment of synchronous interactive devices for BIM project coordination: Prospective ergonomics approach.” Autom. Constr. 101 (May): 160–178. https://doi.org/10.1016/j.autcon.2018.12.009.
Le Dantec, C. A., and E. Y. L. Do. 2009. “The mechanisms of value transfer in design meetings.” Des. Stud. 30 (2): 119–137. https://doi.org/10.1016/j.destud.2008.12.002.
Ma, Z., D. Zhang, and J. Li. 2018. “A dedicated collaboration platform for integrated project delivery.” Autom. Constr. 86 (Feb): 199–209. https://doi.org/10.1016/j.autcon.2017.10.024.
Majava, J., H. Haapasalo, and K. Aaltonen. 2019. “Elaborating factors affecting visual control in a big room.” Constr. Innovation 19 (1): 34–47. https://doi.org/10.1108/CI-06-2018-0048.
Mehrbod, S., S. Staub-French, N. Mahyar, and M. Tory. 2019. “Characterizing interactions with BIM tools and artifacts in building design coordination meetings.” Autom. Constr. 98 (Feb): 195–213. https://doi.org/10.1016/j.autcon.2018.10.025.
Nøklebye, A., F. Svalestuen, R. Fosse, and O. Lædre. 2018. “Enabling lean design with management of model maturity.” In Proc., 26th Annual Conf. of the Int. Group for Lean Construction: Evolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers, IGLC 2018, 79–89. San Diego: International Group for Lean Construction.
Oroszi, T. 2020. “Egos at the table, a study of meeting behaviors.” Psychology 11 (4): 636. https://doi.org/10.4236/psych.2020.114043.
Park, J. H., and G. Lee. 2017. “Design coordination strategies in a 2D and BIM mixed-project environment: Social dynamics and productivity.” Build. Res. Inf. 45 (6): 631–648. https://doi.org/10.1080/09613218.2017.1288998.
Patti, A. L., J. P. Gilbert, and S. Hartman. 1997. “Physical co-location and the success of new product development projects.” Eng. Manage. J. 9 (3): 31–38. https://doi.org/10.1080/10429247.1997.11414949.
Robson, C., and K. McCartan. 2017. “Ethical and political considerations.” In Real weorld Research, 205–240. New York: Wiley.
Sacks, R., U. Gurevich, and P. Shrestha. 2016. “A review of building information modeling protocols, guides and standards for large construction clients.” J. Inf. Technol. Constr. (ITcon) 21 (29): 479–503.
Sacks, R., L. Koskela, B. A. Dave, and R. Owen. 2010. “Interaction of lean and building information modeling in construction.” J. Constr. Eng. Manage. 136 (9): 968–980. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000203.
Shen, W., B. Choi, S. Lee, W. Tang, and C. T. Haas. 2018. “How to improve interface management behaviors in EPC projects: Roles of formal practices and social norms.” J. Manage. Eng. 34 (6): 04018032. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000639.
Steward, D. V. 1981. “The design structure system: A method for managing the design of complex systems.” IEEE Trans. Eng. Manage. EM-28 (3): 71–74. https://doi.org/10.1109/TEM.1981.6448589.
Sun, J., X. Ren, and C. J. Anumba. 2019. “Analysis of knowledge-transfer mechanisms in construction project cooperation networks.” J. Manage. Eng. 35 (2): 04018061. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000663.
Svalestuen, F., V. Knotten, O. Lædre, and J. Lohne. 2018. “Planning the building design process according to level of development.” Lean Constr. J. 16–33.
Taggart, M., L. Koskela, and J. Rooke. 2014. “The role of the supply chain in the elimination and reduction of construction rework and defects: An action research approach.” Construct. Manage. Econ. 32 (7–8): 829–842. https://doi.org/10.1080/01446193.2014.904965.
Tarr, B., M. Slater, and E. Cohen. 2018. “Synchrony and social connection in immersive virtual reality.” Sci. Rep. 8 (1): 1–8. https://doi.org/10.1038/s41598-018-21765-4.
Tauriainen, M., P. Marttinen, B. Dave, and L. Koskela. 2016. “The effects of BIM and lean construction on design management practices.” Procedia Eng. 164: 567–574. https://doi.org/10.1016/j.proeng.2016.11.659.
Tayeh, R., and R. R. Issa. 2020. “Interactive holograms for construction coordination and quantification.” J. Manage. Eng. 36 (6): 04020079. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000847.
Tilley, P. A. 2005. “Lean design management—A new paradigm for managing the design and documentation process to improve quality?” In Proc., 13th Annual Conf. of the Int. Group for Lean Construction. San Diego: International Group for Lean Construction.
Tommelein, I. D., and S. Gholami. 2012. “Root causes of clashes in building information models.” In Proc., 20th Annual Conf. of the Int. Group for Lean Construction. San Diego: International Group for Lean Construction.
Tribelsky, E., and R. Sacks. 2010. “Measuring information flow in the detailed design of construction projects.” Res. Eng. Des. 21 (3): 189–206. https://doi.org/10.1007/s00163-009-0084-3.
Wang, L., and F. Leite. 2012. “Toward process-aware building information modeling for dynamic design and management of construction processes.” In Proc., 19th Annual Workshop of the European Group for Intelligent Computing in Engineering (EG-ICE). Herrsching, Germany: Technische Universität München.
Warfield, J. N. 1973. “Binary matrices in system modeling.” IEEE Trans. Syst. Man Cybern. SMC-3 (5): 441–449. https://doi.org/10.1109/TSMC.1973.4309270.

Information & Authors

Information

Published In

Go to Journal of Management in Engineering
Journal of Management in Engineering
Volume 38Issue 3May 2022

History

Received: Mar 3, 2021
Accepted: Dec 1, 2021
Published online: Jan 24, 2022
Published in print: May 1, 2022
Discussion open until: Jun 24, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Eliav Tuval [email protected]
Dept. of Civil and Environmental Engineering, Ben Gurion Univ. of the Negev, P.O.B. 653, Beer-Sheva 8410501, Israel. Email: [email protected]
Senior Lecturer, Dept. of Civil and Environmental Engineering, Ben Gurion Univ. of the Negev, P.O.B. 653, Beer-Sheva 8410501, Israel (corresponding author). ORCID: https://orcid.org/0000-0001-8601-7601. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Configuring Success: Unveiling Key Configurations for Enhanced Design Coordination in Hydropower Projects, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-14830, 150, 12, (2024).
  • BIM-Based Management System for Off-Site Construction Projects, Applied Sciences, 10.3390/app12199878, 12, 19, (9878), (2022).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share