Factors Influencing Scheduling Activities of Construction Projects

Publication: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Volume 15, Issue 1

Abstract

While construction projects continue to grow rapidly every year, the industry still faces challenges in the form of underperformance as the result of inefficient project management. This is reflected in low productivity and cost and time overruns for construction projects. Better planning and scheduling are important in order to increase the success of construction projects. This study aimed to investigate factors influencing scheduling activities of construction projects in Indonesia. A systematic literature review was performed, leading to the identification of twenty factors influencing scheduling activities at the planning stage and twelve factors influencing scheduling activities at the implementation stage. Questionnaire surveys were distributed to obtain the primary data in this study. Following data collection, factor analysis was conducted to discover comprehensive underlying concepts influencing scheduling activities. Six groups of factors influencing scheduling activities at the planning stage and three groups influencing scheduling activities at the implementation stage were identified. These findings were synthesized to develop a framework. Therefore, this study contributes by identifying key factors influencing scheduling activities in both planning and implementation stages through factor analysis within a context-specific environment and presenting the scheduling-dispute framework as a practical tool for managing delay-related disputes that may arise due to these factors. Construction professionals can take advantage of this study to implement better scheduling practices and minimize construction disputes; such improvements ultimately lead to project success.

Practical Applications

Construction contracts typically include provisions for contractors to create construction programs based on their scheduling activities. However, contracts are usually silent with regard to scheduling fundamentals and the form of programs. The time aspect is one of the main aspects that must be met in the execution of a construction contract. Failure to complete work on time may result in the contractor being obliged to pay damages. Although many studies have been conducted concerning scheduling and delay-related disputes, the industry still suffers from challenges related to proper scheduling and delays. A context-based study is needed that focuses on the factors influencing scheduling activities in order to improve scheduling performance. This study is unique in that it presents these factors in two scheduling stages, planning and implementation. Based on the identification of primary influencing factors, a scheduling-dispute framework that describes the relationship between these various factors and delay-related disputes that occur was developed in this study. Contractors can take advantage of this framework and align their best practices with it to enhance their readiness in an effort to prevent delays through proper scheduling.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

References

Works Cited

Abdul-Malak, M. A. U., and R. K. Mehdi. 2020. “Investigation of the reasonable time computation under time-at-large construction schedule disputes.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 04519042. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000351.
Acharya, S., B. R. Bhandari, and N. Timilsina. 2021. “Time overrun study in construction projects of rural municipalities in Syangja, Gandaki Province, Nepal.” Int. J. Eng. Res. Technol. 10 (8): 561–570. https://doi.org/10.17577/IJERTV10IS080230.
Agritama, R. P., M. Huda, and T. S. Rini. 2018. “Faktor-Faktor Yang Mempengaruhi Keterlambatan Proyek Konstruksi di Surabaya.” Jurnal Rekayasa Manajemen Konstruksi 6 (1): 25–32.
Ahmed, R., and V. S. Anantatmula. 2017. “Empirical study of project manager’s leadership competence and project performance.” Eng. Manage. J. 29 (3): 189–205. https://doi.org/10.1080/10429247.2017.1343005.
Al-Kharashi, A., and M. Skitmore. 2009. “Causes of delays in Saudi Arabian public sector construction projects.” Construct. Manage. Econ. 27 (1): 3–23. https://doi.org/10.1080/01446190802541457.
Al Nasseri, H. A., K. Widen, and R. Aulin. 2016. “A taxonomy of planning and scheduling methods to support their more efficient use in construction project management.” J. Eng. Des. Technol. 14 (3): 580–601. https://doi.org/10.1108/JEDT-11-2013-0078.
Alnuaimi, A. S., R. A. Taha, M. Al Mohsin, and A. S. Al-Harthi. 2010. “Causes, effects, benefits, and remedies of Cos on public construction projects in Oman.” J. Constr. Eng. Manage. 136 (5): 615–622. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000154.
Anyaeche, C. O., O. O. Oluwole, P. J. Nnweremizu, and I. J. Orji. 2012. “Project progress evaluation: Methodology and reporting template.” In Vol. 3 of Proc., of the Nigerian Institute of Industrial Engineers Conf., 36–47. Ibadan, Nigeria: Univ. of Ibadan.
Ariyanto, A. S., K. A. P. Kamila, U. Supriyadi, and W. L. Mahmudi. 2019. “Pengaruh Keterlambatan material terhadap Risiko Proyek Pembangunan Gedung Parkir.” Bangun Rekaprima 5 (2): 51–58.
Bagaya, O., and J. Song. 2016. “Empirical study of factors influencing schedule delays of public construction projects in Burkina Faso.” J. Manage. Eng. 32 (5): 05016014. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000443.
Bahl, M., P. R. Taylor, and K. McCall. 2021. CIOB planning protocol 2021 (CIOB PP21). Bracknell, UK: Chartered Institute of Building.
Balwin, A., and D. Bordoli. 2014. A handbook for construction planning and scheduling. 1st ed. New York: Wiley.
Bandur, A. 2016. Penelitian kuantitatif: Metodologi, desain, dan teknik analisis data. Yogyakarta, Indonesia: Deepublish Press.
Barbosa, F., J. Woetzel, J. Mischke, M. J. Ribeirinho, M. Sridhar, M. Parsons, N. Bertram, and S. Brown. 2017. “Reinventing construction through a productivity revolution.” Accessed February 19, 2022. https://www.mckinsey.com/business-functions/operations/our-insights/reinventing-construction-through-a-productivity-revolution.
Bektas, S., M. T. Birgonul, and I. Dikmen. 2021. “Integrated probabilistic delay analysis method to estimate expected outcome of construction delay disputes.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 13 (1): 04520037. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000439.
Birgonul, M. T., I. Dikmen, and S. Bektas. 2015. “Integrated approach to overcome shortcomings in current delay analysis practices.” J. Constr. Eng. Manage. 141 (4): 04014088. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000946.
Boy, W., R. Erlindo, and R. Fitrah. 2021. “Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi Gedung Kuliah pada Masa Pandemi COVID 19.” Jurnal Rivet 1 (1): 57–64. https://doi.org/10.47233/rivet.v1i01.231.
Brown, R. B., L. R. Dysert, J. P. Orr, A. Shakourifar, and S. T. Warhoe. 2020. “AACEI recommended practice No. 91R-16: Schedule development.” Accessed May 7, 2022. https://web.aacei.org/docs/default-source/toc/toc_91r-16.pdf.
Budayan, C. 2019. “Evaluation of delay causes for BOT projects based on perceptions of different stakeholders in Turkey.” J. Manage. Eng. 35 (1): 04018057. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000668.
Çevikbas, M., and Z. Isık. 2021. “An overarching review on delay analyses in construction projects.” Buildings 11 (3): 109. https://doi.org/10.3390/buildings11030109.
Desgagné-Lebeuf, A., N. Lehoux, and R. Beauregard. 2020. “Scheduling tools for the construction industry: Overview and decision support system for tool selection.” Int. J. Constr. Manage. 2022 (Feb): 1–12. https://doi.org/10.1080/15623599.2020.1819583.
Drezet, L. E., and J. C. Billaut. 2008. “A project scheduling problem with labour constraints and time-dependent activities requirements.” Int. J. Prod. Econ. 112 (1): 217–225. https://doi.org/10.1016/j.ijpe.2006.08.021.
Eid, M. S., E. E. Elbeltagi, and I. H. El-Adaway. 2021. “Simultaneous multi-criteria optimization for scheduling linear infrastructure projects.” Int. J. Constr. Manage. 21 (1): 41–55. https://doi.org/10.1080/15623599.2018.1505027.
Fan, S. L. 2012. “Modified time impact analysis method.” J. Constr. Eng. Manage. 138 (2): 227–233. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000402.
Fan, S. L., C. H. Wu, and C. C. Hun. 2015. “Integration of cost and schedule using BIM.” J. Appl. Sci. Eng. 18 (3): 223–232.
Faridi, A. S., and S. M. El-Sayegh. 2007. “Significant factors causing delay in the UAE construction industry.” Construct. Manage. Econ. 24 (11): 1167–1176. https://doi.org/10.1080/01446190600827033.
Field, A. 2017. Discovering statistics using IBM SPSS statistics. 5th ed. Thousand Oaks, CA: SAGE.
Fincham, J. E. 2008. “Response rates and responsiveness for surveys, standards, and the Journal.” Am. J. Pharm. Educ. 72 (2): 43. https://doi.org/10.5688/aj720243.
Gaur, S. 2022. “Understanding the importance of project planning and scheduling in Indian construction projects.” J. Positive School Psychol. 6 (3): 3535–3544.
Hair, J. F., W. C. Black, B. J. Babin, R. E. Anderson, and R. L. Tatham. 2010. Multivariate data analysis, 7th ed. Hoboken, NJ: Pearson Prentice Hall.
Hammad, M. W., A. Abbasi, and M. J. Ryan. 2018. “Developing a novel framework to manage schedule contingency using theory of constraints and earned schedule method.” J. Constr. Eng. Manage. 144 (4): 04018011. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001178.
Hansen, S. 2020. “A front end planning decision-Making framework for infrastructure project selection and prioritisation in Indonesia.” Doctoral thesis, School of Property Construction and Project Management, Royal Melbourne Institute of Technology Univ.
Hansen, S. 2021. “Developing a model of construction contract management competency in a developing country: Quantitative approach.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 13 (4): 04521030. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000504.
Hansen, S., S. F. Rostiyanti, and A. Rif’at. 2020. “Causes, effects, and mitigations framework of contract change orders: Lessons learned from GBK aquatic stadium project.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 05019008. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000341.
Harikrishnakumar, R. 2017. “A practical approach to project scheduling: Considering multiple critical path scenarios in project network.” Master thesis, Dept. of Industrial and Manufacturing Engineering, Wichita State Univ.
Hassan, H., J. B. Mangare, and P. A. K. Pratasis. 2016. “Faktor-Faktor Penyebab Keterlambatan pada Proyek Konstruksi dan Alternatif Penyelesaiannya (Studi Kasus: Di Manado Town Square III).” Jurnal Sipil Statik 4 (11): 657–664.
Hebert, J. E., and R. F. Deckro. 2011. “Combining contemporary and traditional project management tools to resolve a project scheduling problem.” Comput. Oper. Res. 38 (1): 21–32. https://doi.org/10.1016/j.cor.2009.12.004.
Hegazy, T., and E. Kamarah. 2008. “Efficient repetitive scheduling for high-rise construction.” J. Constr. Eng. Manage. 134 (4): 253–264. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:4(253).
Hussein, B. A., and O. J. Klakegg. 2014. “Measuring the impact of risk factors associated with project success criteria in early phase.” Procedia Eng. Soc. Behav. Sci. 119 (45): 711–718. https://doi.org/10.1016/j.sbspro.2014.03.079.
Hwang, B. G., X. Zhao, and S. Y. Ng. 2013. “Identifying the critical factors affecting schedule performance of public housing projects.” Habitat Int. 38 (1): 214–221. https://doi.org/10.1016/j.habitatint.2012.06.008.
Ibbs, W., and L. D. Nguyen. 2007. “Schedule analysis under the effect of resource allocation.” J. Constr. Eng. Manage. 133 (2): 131–138. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:2(131).
Ibironke, O. T., T. O. Oladinrin, O. Adeniyi, and I. W. Eboreime. 2013. “Analysis of non-excusable delay factors influencing contractors’ performance in Lagos State, Nigeria.” J. Constr. Dev. Countries 18 (1): 53–72.
Iyer, K. C., N. B. Chaphalkar, and G. A. Joshi. 2008. “Understanding time delay disputes in construction contracts.” Int. J. Project Manage. 26 (2): 174–184. https://doi.org/10.1016/j.ijproman.2007.05.002.
Iyer, K. C., and K. N. Jha. 2006. “Critical factors affecting schedule performance: Evidence from Indian construction projects.” J. Constr. Eng. Manage. 132 (8): 871–881. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:8(871).
Jurf, N. A., and S. Beheiry. 2012. “Factors affecting cost and schedule in Qatar’s residential compounds projects.” Int. J. Eng. Manage. Econ. 3 (1): 117–134. https://doi.org/10.1504/IJEME.2012.048608.
Kakar, A. S., A. Hasan, and K. N. Jha. 2020. “Schedule success factors in construction projects in a war-affected region.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (3): 05020008. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000417.
Kim, H., and H. Ahn. 2011. “Temporary facility planning of a construction project using BIM (building information modeling).” In Proc., Congress on Computing in Civil Engineering, 627–634. Reston, VA: ASCE.
Kong, F., and D. Dou. 2021. “Resource-constrained project scheduling problem under multiple time constraints.” J. Constr. Eng. Manage. 147 (2): 04020170. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001990.
KPPIP (Komite Percepatan Penyediaan Infrastruktur Prioritas). 2022. “Proyek strategis nasional.” Accessed March 4, 2022. https://kppip.go.id/proyek-strategis-nasional/.
Krisnawati, M. 2014. “Penyelesaian Permasalahan Penjadwalan Aktivitas Proyek dengan Batasan Sumber Daya Menggunakan dengan Batasan Sumber Daya Menggunakan Metode Cross Entropy.” Dinamika Rekayasa 10 (1): 1–5.
Kumar, M. K., M. S. Maregoudru, and B. P. Sparsha. 2017. “Construction project scheduling of MK apartment using MS project 2013.” Int. J. Eng. Technol. 4 (7): 2275–2279.
Liu, H., M. Al-Hussein, and M. Lu. 2015. “BIM-based integrated approach for detailed construction scheduling under resource constraints.” Autom. Constr. 53 (Mar): 29–43. https://doi.org/10.1016/j.autcon.2015.03.008.
Maddeppungeng, A., D. E. Lestari, and A. Oktafiani. 2019. “Studi Faktor Penyebab Keterlambatan Proyek Konstruksi Studi Kasus Proyek Pembangunan 6 Ruas Jalan Tol Dalam Kota Jakarta.” Jurnal Konstruksia 11 (1): 89–95. https://doi.org/10.24853/jk.11.1.89-96.
Magdy, M., M. Georgy, H. Osman, and M. Elsaid. 2019. “Delay analysis methodologies used by engineering and construction firms in Egypt.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 11 (3): 04519006. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000293.
Mubarak, S. 2015. Construction project scheduling and control. New York: Wiley.
Mulholland, B., and J. Christian. 1999. “Risk assessment in construction schedules.” J. Constr. Eng. Manage. 125 (1): 8–15. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:1(8).
Munvar, C., D. G. Mengistu, and G. Mahesh. 2020. “Concurrent delay analysis: Methods, case law, and expert perception.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 04519035. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000343.
Nomir, M. 2021. “Decision support system for consultant evaluation and ranking using qualifications-Based selection and fuzzy TOPSIS approach.” Master thesis, Dept. of Civil and Environmental Engineering, Univ. of Alberta.
Nor, R. N. H., Y. Y. Jusoh, F. C. Mohamed, S. A. Hassan, and M. F. M. Shari. 2021. “Project scheduling management in the software industry.” Turk. J. Comput. Math. Educ. 12 (3): 2136–2145. https://doi.org/10.17762/turcomat.v12i3.1156.
Octavia, I. K., E. C. Tandoyo, P. Nugraha, and S. Lukito. 2013. “Perbandingan Aplikasi program Microsoft project dan Primavera dalam Penjadwalan Proyek Konstruksi.” Jurnal Dimensi Pratama Teknik Sipil 2 (2): 1–8.
Perera, N. A., M. Sutrisna, and T. W. Yiu. 2016. “Decision-making model for selecting the optimum method of delay analysis in construction projects.” J. Manage. Eng. 32 (5): 04016009. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000441.
PMI (Project Management Institute). 2011. Practice standard for scheduling, 2nd ed. New York: PMI.
PMI (Project Management Institute). 2017. A guide to the project management body of knowledge, 6th ed. New York: PMI.
Radujković, M., and M. Sjekavica. 2017. “Project management success factors.” Procedia Eng. 196 (Mar): 607–615. https://doi.org/10.1016/j.proeng.2017.08.048.
Ragavi, S., and R. Uma. 2017. “Planning and scheduling of an apartment building by comparison of MS. Project and primavera.” Int. J. Civ. Eng. 6 (4): 21–32.
Rauzana, A., A. Zahrah, and W. Dharma. 2022. “Critical delay factors for construction projects in Central Aceh District, Indonesia.” F1000Research 2022 (11): 474. https://doi.org/10.12688/f1000research.110024.3.
Rostiyanti, S. F., S. Hansen, and T. N. Ponda. 2020. “Cause and effect of conditional payments provision to subcontractors.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 04519045. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000352.
Setiawan, A. F., S. Hansen, and A. Fujiono. 2021. “Measuring the influence of communication planning towards construction project performance.” Civ. Environ. Eng. 17 (1): 58–65. https://doi.org/10.2478/cee-2021-0007.
Shrestha, P. P., and K. P. Neupane. 2020. “Identification of geotechnical-related problems impacting cost, schedule, and claims on bridge construction projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (2): 04520005. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000375.
Shrestha, P. P., and H. Zeleke. 2018. “Effect of change orders on cost and schedule overruns of school building renovation projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 10 (4): 04518018. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000271.
Simanjuntak, M. R. A., and Y. Lawalata. 2019. “Identifikasi Faktor dan Variabel Penjadwalan Proyek Bangunan Gedung di Lingkungan FIFGROUP.” In Proc., TECHNOPEX-2019, 73–78. South Tangerang, Indonesia: Institut Teknologi Indonesia.
Song, S., J. Yang, and N. Kim. 2012. “Development of a BIM-based structural framework optimization and simulation system for building construction.” Comput. Ind. 63 (9): 895–912. https://doi.org/10.1016/j.compind.2012.08.013.
Stephenson, H. L. 2010. “AACEI recommended practice No. 27R-03: Schedule classification system.” Accessed May 7, 2022. https://web.aacei.org/docs/default-source/toc/toc_27r-03.pdf.
Voth, G. W. 2009. “Classification of schedule management barriers through concept mapping.” Master thesis, Dept. of the Airforce, Air Univ.
Wang, H. H., F. Boukamp, and T. Elghamrawy. 2011. “Ontology-based approach to context representation and reasoning for managing context sensitive construction information.” J. Comput. Civ. Eng. 25 (5): 331–346. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000094.
Wang, J., and W. Li. 2017. “Study on factors affecting construction schedule of prefabricated buildings based on PCA.” In Proc., Int. Conf. on Construction and Real Estate Management (ICCREM 2017), 147–154. Reston, VA: ASCE.
Wang, Z., and E. R. Azar. 2019. “BIM-based draft schedule generation in reinforced concrete-framed buildings.” Constr. Innovation 19 (2): 280–294. https://doi.org/10.1108/CI-11-2018-0094.
Yang, J. B., M. Y. Chu, and K. M. Huang. 2013. “An empirical study of schedule delay causes based on Taiwan’s litigation cases.” Project Manage. J. 44 (3): 21–31. https://doi.org/10.1002/pmj.21337.
Yang, J. B., and M. K. Tsai. 2011. “Computerizing ICBF method for schedule delay analysis.” J. Constr. Eng. Manage. 137 (8): 583–591. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000338.

Information & Authors

Information

Published In

Go to Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Volume 15Issue 1February 2023

History

Received: Mar 13, 2022
Accepted: Aug 18, 2022
Published online: Oct 31, 2022
Published in print: Feb 1, 2023
Discussion open until: Mar 31, 2023

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Lecturer, Dept. of Construction Engineering and Management, Univ. Agung Podomoro, Jakarta 11470, Indonesia (corresponding author). ORCID: https://orcid.org/0000-0003-3474-6065. Email: [email protected]
Lecturer, Dept. of Construction Engineering and Management, Univ. Agung Podomoro, Jakarta 11470, Indonesia. ORCID: https://orcid.org/0000-0002-8076-8970. Email: [email protected]
Steven Wijaya [email protected]
Student, Dept. of Construction Engineering and Management, Univ. Agung Podomoro, Jakarta 11470, Indonesia. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share