Technical Papers
May 17, 2022

Effect between Trust in Communication Technology and Interorganizational Trust in BIM-Enabled Projects

Publication: Journal of Construction Engineering and Management
Volume 148, Issue 8

Abstract

Building information modeling (BIM) and its associated digital tools have been widely adopted in designing, constructing, and operating infrastructures, particularly during the COVID-19 pandemic. However, the influence of these communication technologies on the interorganizational trust among project team members is unclear. In this study, BIM and its communication tools were conceptualized based on the perception of trust in communication technology, to examine their influence on interorganizational trust. The effect of trust in communication technology on interorganizational trust was investigated through the mediation of obligatory cooperation and voluntary cooperation. In addition, partial least squares structural equation modeling was used to explore and predict the causal relationships of the model. The results show that trust in communication technology has no direct effect on interorganizational trust, but it positively affects the relationships via the mediation of obligatory cooperation. In comparison, trust in communication technology significantly impacts voluntary cooperation, which does not considerably influence interorganizational trust. Lastly, the findings of this study contribute new knowledge to trust theories for construction teams that use communication technologies to collaborate in BIM-enabled projects, and provide an explanation for the development of trust by communication technologies through improvement of the interorganizational trust in BIM-enabled projects.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, and code generated or used during the study appear in the published article.

Acknowledgments

This work was supported by Fundamental Research Grant Scheme (FRGS/1/2018/TK06/READING/03/1) and the Ministry of Higher Education Malaysia.

References

Akinadé, O. O., L. O. Oyedele, K. Munir, M. Bilal, S. O. Ajayi, H. A. Owolabi, H. A. Alaka, and S. A. Bello. 2016. “Evaluation criteria for construction waste management tools: Towards a holistic BIM framework.” Int. J. Sustainable Build. Technol. Urban Dev. 7 (1): 3–21. https://doi.org/10.1080/2093761X.2016.1152203.
Akrout, H., and A. La Rocca. 2019. “Interpersonal and inter-organizational trust in high-involvement customer–supplier relationships: Antecedents, consequences, and moderators.” In New insights on trust in business-to-business relationships. Bingley, UK: Emerald.
Alreshidi, E., M. Mourshed, and Y. Rezgui. 2017. “Factors for effective BIM governance.” J. Build. Eng. 10 (Mar): 89–101. https://doi.org/10.1016/j.jobe.2017.02.006.
Anvuur, A. M., and M. M. Kumaraswamy. 2012. “Measurement and antecedents of cooperation in construction.” J. Constr. Eng. Manage. 138 (7): 797–810. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000498.
Awwad, K. A., A. Shibani, and M. Ghostin. 2020. “Exploring the critical success factors influencing BIM level 2 implementation in the UK construction industry: The case of SMEs.” Int. J. Constr. Manage. 2020 (Mar): 1–8. https://doi.org/10.1080/15623599.2020.1744213.
Bergiel, B. J., E. B. Bergiel, and P. W. Balsmeier. 2008. “Nature of virtual teams: A summary of their advantages and disadvantages.” Manage. Res. News 31 (2): 99–110. https://doi.org/10.1108/01409170810846821.
Blau, P. M. 1964. “Justice in social exchange.” Sociological Inq. 34 (2): 193–206. https://doi.org/10.1111/j.1475-682X.1964.tb00583.x.
Braun, T., G. Müller-Seitz, and J. Sydow. 2012. “Project citizenship behavior?—An explorative analysis at the project-network-nexus.” Scand. J. Manage. 28 (4): 271–284. https://doi.org/10.1016/j.scaman.2012.05.008.
Castañer, X., and N. Oliveira. 2020. “Collaboration, coordination, and cooperation among organizations: Establishing the distinctive meanings of these terms through a systematic literature review.” J. Manage. 46 (6): 965–1001. https://doi.org/10.1177/0149206320901565.
CCIA (China Construction Industry Association). 2020. “Investigation report on how COVID-19 impacted the Chinese construction enterprise.” Accessed December 11, 2021. http://www.zgjzy.org.cn/menu20/newsDetail/8428.html.
Cerić, A., M. Vukomanović, I. Ivić, and S. Kolarić. 2020. “Trust in megaprojects: A comprehensive literature review of research trends.” Int. J. Project Manage. 39 (4): 325–338. https://doi.org/10.1016/j.ijproman.2020.10.007.
Chen, H.-M., K.-C. Chang, and T.-H. Lin. 2016. “A cloud-based system framework for performing online viewing, storage, and analysis on big data of massive BIMs.” Autom. Constr. 71 (3): 34–48. https://doi.org/10.1016/j.autcon.2016.03.002.
Cohen, J. 1988. Statistical power analysis for the behavioral sciences. Routledge, Netherlands: Taylor & Francis. https://doi.org/10.4324/9780203771587.
Cohen, J. 1992. “Statistical power analysis.” Curr. Directions Psychol. Sci. 1 (3): 98–101. https://doi.org/10.1111/1467-8721.ep10768783.
Cropanzano, R., E. L. Anthony, S. R. Daniels, and A. V. Hall. 2017. “Social exchange theory: A critical review with theoretical remedies.” Acad. Manage. Ann. 11 (1): 479–516. https://doi.org/10.5465/annals.2015.0099.
Crotty, R. 2013. The impact of building information modelling: Transforming construction. Abingdon, UK: Routledge.
Das, T. K., and B. S. Teng. 1998. “Between trust and control: Developing confidence in partner cooperation in alliances.” Acad. Manage. Rev. 23 (3): 491–512. https://doi.org/10.2307/259291.
Das, T. K., and B.-S. Teng. 2001. “Trust, control, and risk in strategic alliances: An integrated framework.” Organ. Stud. 22 (2): 251–283. https://doi.org/10.1177/0170840601222004.
Dennis, A. R., R. M. Fuller, and J. S. Valacich. 2008. “Media, tasks, and communication processes: A theory of media synchronicity.” MIS Q. 32 (3): 575–600. https://doi.org/10.2307/25148857.
Dorairaj, S., J. Noble, and P. Malik. 2010. “Understanding the importance of trust in distributed Agile projects: A practical perspective.” In Agile processes in software engineering and extreme programming. Berlin: Springer.
Dounas, T., D. Lombardi, and W. Jabi. 2021. “Framework for decentralised architectural design BIM and Blockchain integration.” Int. J. Archit. Comput. 19 (2): 157–173. https://doi.org/10.1177/1478077120963376.
Du, J., D. Zhao, R. R. A. Issa, and N. Singh. 2020. “BIM for improved project communication networks: Empirical evidence from email logs.” J. Comput. Civ. Eng. 34 (5): 04020027. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000912.
Dyer, J. H., and W. Chu. 2000. “The determinants of trust in supplier-automaker relationships in the US, Japan and Korea.” J. Int. Bus. Stud. 31 (2): 259–285. https://doi.org/10.1057/palgrave.jibs.8490905.
Ejdys, J. 2018. “Building technology trust in ICT application at a university.” Int. J. Emerging Markets 13 (5): 980–997. https://doi.org/10.1108/IJoEM-07-2017-0234.
Fan, S.-L., C.-Y. Lee, H.-Y. Chong, and M. J. Skibniewski. 2018. “A critical review of legal issues and solutions associated with building information modelling.” Technol. Econ. Dev. Econ. 24 (5): 2098–2130. https://doi.org/10.3846/tede.2018.5695.
Fong, P. S., and B. W. Lung. 2007. “Interorganizational teamwork in the construction industry.” J. Constr. Eng. Manage. 133 (2): 157–168. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:2(157).
Gartner. 2020. “Gartner HR survey reveals 88% of organizations have encouraged or required employees to work from home due to coronavirus.” Accessed July 23, 2020. –https://www.gartner.com/en/newsroom/press-releases/2020-07-14-gartner-survey-reveals-82-percent-of-company-leaders-plan-to-allow-employees-to-work-remotely-some-of-the-time.
Geisser, S. 1974. “A predictive approach to the random effects model.” Biometrika 61 (1): 101–107. https://doi.org/10.1093/biomet/61.1.101.
Girmscheid, G., and C. Brockmann. 2010. “Inter- and intraorganizational trust in international construction joint ventures.” J. Constr. Eng. Manage. 136 (3): 353–360. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000142.
Granovetter, M. 1985. “Economic action and social structure: The problem of embeddedness.” Am. J. Sociol. 91 (3): 481–510.
Gulati, R., and J. A. Nickerson. 2008. “Interorganizational trust, governance choice, and exchange performance.” Organ. Sci. 19 (5): 688–708. https://doi.org/10.1287/orsc.1070.0345.
Gulati, R., and H. Singh. 1998. “The architecture of cooperation: Managing coordination costs and appropriation concerns in strategic alliances.” Administrative Sci. Q. 43 (4): 781–814. https://doi.org/10.2307/2393616.
Hair, J. F., G. T. M. Hult, C. M. Ringle, and M. Sarstedt. 2017. A primer on partial least squares structural equation modeling (PLS-SEM). 2nd ed. Thousand Oaks, CA: SAGE.
He, Q., G. Wang, L. Luo, Q. Shi, J. Xie, and X. Meng. 2017. “Mapping the managerial areas of Building Information Modeling (BIM) using scientometric analysis.” Int. J. Project Manage. 35 (4): 670–685. https://doi.org/10.1016/j.ijproman.2016.08.001.
Henseler, J., C. M. Ringle, and M. Sarstedt. 2015. “A new criterion for assessing discriminant validity in variance-based structural equation modeling.” J. Acad. Marketing Sci. 43 (1): 115–135. https://doi.org/10.1007/s11747-014-0403-8.
Hurmerinta-Haanpää, A., and S. Viding. 2018. “The functions of contracts in interorganizational relationships: A contract experts’ perspective.” J. Strategic Contracting Negotiation 4 (1–2): 98–118. https://doi.org/10.1177/2055563619884791.
Iorio, J., and J. E. Taylor. 2015. “Precursors to engaged leaders in virtual project teams.” Int. J. Project Manage. 33 (2): 395–405. https://doi.org/10.1016/j.ijproman.2014.06.007.
Jap, S. D., and E. Anderson. 2003. “Safeguarding interorganizational performance and continuity under ex post opportunism.” Manage. Sci. 49 (12): 1684–1701. https://doi.org/10.1287/mnsc.49.12.1684.25112.
Jiang, W., Y. Lu, and Y. Le. 2016. “Trust and project success: A twofold perspective between owners and contractors.” J. Manage. Eng. 32 (6): 04016022. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000469.
Kensek, K. 2015. “BIM guidelines inform facilities management databases: A case study over time.” Buildings 5 (3): 899–916. https://doi.org/10.3390/buildings5030899.
Khalid, S., and T. Ali. 2017. “An integrated perspective of social exchange theory and transaction cost approach on the antecedents of trust in international joint ventures.” Int. Bus. Rev. 26 (3): 491–501. https://doi.org/10.1016/j.ibusrev.2016.10.008.
Kock, N. 2015. “Common method bias in PLS-SEM: A full collinearity assessment approach.” Int. J. e-Collab. 11 (4): 1–10. https://doi.org/10.4018/ijec.2015100101.
Krot, K., and D. Lewicka. 2016. Trust in an innovative organisation. Warsaw, Poland: C.H. Beck.
Leavitt, H. J. 1964. “Applied organizational change in industry: Structural, technological and humanistic approaches.” In Handbook of organisation. Chicago, IL: Rand McNally and Company.
Lee, C. Y., H.-Y. Chong, and X. Wang. 2018. “Enhancing BIM performance in EPC projects through integrative trust-based functional contracting model.” J. Constr. Eng. Manage. 144 (7): 06018002. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001521.
Lee, C.-Y., and H.-Y. Chong. 2021. “Influence of prior ties on trust and contract functions for BIM-enabled EPC megaproject performance.” J. Constr. Eng. Manage. 147 (7): 04021057. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002076.
Lee, C.-Y., H.-Y. Chong, Q. Li, and X. Wang. 2020. “Joint contract–function effects on BIM-enabled EPC project performance.” J. Constr. Eng. Manage. 146 (3): 04020008. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001766.
Lewicki, R. J., E. C. Tomlinson, and N. Gillespie. 2006. “Models of interpersonal trust development: Theoretical approaches, empirical evidence, and future directions.” J. Manage. 32 (6): 991–1022. https://doi.org/10.1177/0149206306294405.
Li, Q., Z. Yin, H.-Y. Chong, and Q. Shi. 2018. “Nexus of interorganizational trust, principled negotiation, and joint action for improved cost performance: Survey of Chinese megaprojects.” J. Manage. Eng. 34 (6): 04018036. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000634.
Lioukas, C. S., and J. J. Reuer. 2015. “Isolating trust outcomes from exchange relationships: Social exchange and learning benefits of prior ties in alliances.” Acad. Manage. J. 58 (6): 1826–1847. https://doi.org/10.5465/amj.2011.0934.
Lioukas, C. S., J. J. Reuer, and M. Zollo. 2016. “Effects of information technology capabilities on strategic alliances: Implications for the resource-based view.” J. Manage. Stud. 53 (2): 161–183. https://doi.org/10.1111/joms.12179.
Liu, Y., S. van Nederveen, and M. Hertogh. 2017. “Understanding effects of BIM on collaborative design and construction: An empirical study in China.” Int. J. Project Manage. 35 (4): 686–698. https://doi.org/10.1016/j.ijproman.2016.06.007.
Lodovici, M. S., et al. 2021. The impact of teleworking and digital work on workers and society. Luxembourg: European Parliament.
Lu, W., A. Fung, Y. Peng, C. Liang, and S. Rowlinson. 2015. “Demystifying construction project time–effort distribution curves: BIM and non-BIM comparison.” J. Manage. Eng. 31 (6): 04015010. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000356.
Lui, S. S. 2009. “The roles of competence trust, formal contract, and time horizon in interorganizational learning.” Organ. Stud. 30 (4): 333–353. https://doi.org/10.1177/0170840608101139.
Lui, S. S., and H.-Y. Ngo. 2004. “The role of trust and contractual safeguards on cooperation in non-equity alliances.” J. Manage. 30 (4): 471–485. https://doi.org/10.1016/j.jm.2004.02.002.
Lui, S. S., and H.-Y. Ngo. 2005. “The influence of structural and process factors on partnership satisfaction in interfirm cooperation.” Group Organ. Manage. 30 (4): 378–397. https://doi.org/10.1177/1059601103259113.
Luo, Y. 2002. “Contract, cooperation, and performance in international joint ventures.” Strategic Manage. J. 23 (10): 903–919. https://doi.org/10.1002/smj.261.
Ma, G., J. Jia, J. Ding, M. Wu, and D. Wang. 2021. “Examining the impact of social media use on project management performance: Evidence from construction projects in China.” J. Constr. Eng. Manage. 147 (3): 04021004. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002009.
Mathews, M., D. Robles, and B. Bowe. 2017. “BIM + blockchain: A solution to the trust problem in collaboration?” In CITA BIM gathering 2017. Dublin, Ireland: The Construction IT Alliance.
Mayer, K. J., and N. S. Argyres. 2004. “Learning to contract: Evidence from the personal computer industry.” Organ. Sci. 15 (4): 394–410. https://doi.org/10.1287/orsc.1040.0074.
Nooteboom, B. 1996. “Trust, opportunism, and governance: A process and control model.” Organ. Stud. 17 (6): 985–1010. https://doi.org/10.1177/017084069601700605.
Parkhe, A. 1993. “Strategic alliance structuring: A game theoretic and transaction cost examination of interfirm cooperation.” Acad. Manage. J. 36 (4): 794–829.
Pinto, J. K., D. P. Slevin, and B. English. 2009. “Trust in projects: An empirical assessment of owner/contractor relationships.” Int. J. Project Manage. 27 (6): 638–648. https://doi.org/10.1016/j.ijproman.2008.09.010.
Quanji, Z., S. Zhang, and Y. Wang. 2017. “Contractual governance effects on cooperation in construction projects: Multifunctional approach.” J. Civ. Eng. Educ. 143 (3): 04016025. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000320.
Ragab, M. A., and M. Marzouk. 2021. “BIM adoption in construction contracts: Content analysis approach.” J. Constr. Eng. Manage. 147 (8): 04021094. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002123.
Robson, M. J., C. S. Katsikeas, B. B. Schlegelmilch, and B. Pramböck. 2019. “Alliance capabilities, interpartner attributes, and performance outcomes in international strategic alliances.” J. World Bus. 54 (2): 137–153. https://doi.org/10.1016/j.jwb.2018.12.004.
Sackey, E., M. Tuuli, and A. Dainty. 2015. “Sociotechnical systems approach to BIM implementation in a multidisciplinary construction context.” J. Manage. Eng. 31 (1): A4014005. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000303.
Saparito, P. A., C. C. Chen, and H. J. Sapienza. 2004. “The role of relational trust in bank-small firm relationships.” Acad. Manage. J. 47 (3): 400–410. https://doi.org/10.2307/20159589.
Shafi, M. Q., R. Iqbal, K. Shahzad, and C. Unterhitzenberger. 2021. “The mediating role of project citizenship behavior in the relationship between organizational justice dimensions and project success.” Project Manage. J. 52 (6): 547–562. https://doi.org/10.1177/87569728211026423.
Stone, M. 1974. “Cross-validatory choice and assessment of statistical predictions.” J. R. Stat. Soc. 36 (2): 111–133.
Tang, Y., Y. Chen, Y. Hua, and Y. Fu. 2020. “Impacts of risk allocation on conflict negotiation costs in construction projects: Does managerial control matter?” Int. J. Project Manage. 38 (3): 188–199. https://doi.org/10.1016/j.ijproman.2020.03.002.
Tulenheimo, R. 2015. “Challenges of implementing new technologies in the world of BIM–Case study from construction engineering industry in Finland.” Procedia Econ. Finance 21 (1): 469–477. https://doi.org/10.1016/S2212-5671(15)00201-4.
Venkatesh, V., and H. Bala. 2008. “Technology acceptance model 3 and a research agenda on interventions.” Decis. Sci. 39 (2): 273–315. https://doi.org/10.1111/j.1540-5915.2008.00192.x.
Venkatesh, V., and F. D. Davis. 2000. “A theoretical extension of the technology acceptance model: Four longitudinal field studies.” Manage. Sci. 46 (2): 186–204. https://doi.org/10.1287/mnsc.46.2.186.11926.
Wang, Y., Y. Chen, Y. Fu, and W. Zhang. 2017. “Do prior interactions breed cooperation in construction projects? The mediating role of contracts.” Int. J. Project Manage. 35 (4): 633–646. https://doi.org/10.1016/j.ijproman.2017.02.019.
Wang, Y., Y. Chen, C. Wang, and Y. Tang. 2016. “Roles of contractual safeguarding and social embeddedness in promoting contractor’s cooperation behavior in construction projects.” Int. J. Archit. Eng. Constr. 5 (4): 226–237.
Wang, Y., Y. Wang, X. Wu, and J. Li. 2020. “Exploring the risk factors of infrastructure PPP projects for sustainable delivery: A social network perspective.” Sustainability 12 (10): 4152. https://doi.org/10.3390/su12104152.
Williamson, O. E. 1985. “Assessing contract.” J. Law Econ. Org. 1 (1): 177–208.
Williamson, O. E. 1993. Calculativeness, trust, and economic organization. New York: JSTOR.
Yan, L., and L. Zhang. 2020. “Interplay of contractual governance and trust in improving construction project performance: Dynamic perspective.” J. Manage. Eng. 36 (4): 04020029. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000791.
Yao, H., Y. Chen, Y. Chen, and X. Zhu. 2019. “Mediating role of risk perception of trust and contract enforcement in the construction industry.” J. Constr. Eng. Manage. 145 (2): 04018130. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001604.
Young-Ybarra, C., and M. Wiersema. 1999. “Strategic flexibility in information technology alliances: The influence of transaction cost economics and social exchange theory.” Organ. Sci. 10 (4): 439–459. https://doi.org/10.1287/orsc.10.4.439.
Zaheer, A., and J. Harris. 2006. Interorganizational trust, 169–197. Thousand Oaks, CA: SAGE.
Zaheer, A., B. McEvily, and V. Perrone. 1998. “Does trust matter? Exploring the effects of interorganizational and interpersonal trust on performance.” Organ. Sci. 9 (2): 141–159. https://doi.org/10.1287/orsc.9.2.141.
Zhang, L., and Q. Qian. 2017. “How mediated power affects opportunism in owner–contractor relationships: The role of risk perceptions.” Int. J. Project Manage. 35 (3): 516–529. https://doi.org/10.1016/j.ijproman.2016.12.003.
Zhang, S. B., Y. F. Fu, Y. Gao, and X. D. Zheng. 2016. “Influence of trust and contract on dispute negotiation behavioral strategy in construction subcontracting.” J. Manage. Eng. 32 (4): 04016001. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000427.
Zhong, W., C. Su, J. Peng, and Z. Yang. 2017. “Trust in interorganizational relationships: A meta-analytic integration.” J. Manage. 43 (4): 1050–1075. https://doi.org/10.1177/0149206314546373.
Zhou, K. Z., and L. Poppo. 2010. “Exchange hazards, relational reliability, and contracts in China: The contingent role of legal enforceability.” J. Int. Bus. Stud. 41 (5): 861–881. https://doi.org/10.1057/jibs.2010.7.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 148Issue 8August 2022

History

Received: Jun 30, 2021
Accepted: Feb 28, 2022
Published online: May 17, 2022
Published in print: Aug 1, 2022
Discussion open until: Oct 17, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Cen-Ying Lee, Ph.D. [email protected]
Lecturer, School of the Built Environment, Univ. of Reading Malaysia, Educity, Johor 79200, Malaysia. Email: [email protected]
Research Professor, School of Engineering Audit, Nanjing Audit Univ., Nanjing 211815, China; Associate Professor, School of Design and the Built Environment, Curtin Univ., GPO Box U1987, Perth, WA 6845, Australia (corresponding author). ORCID: https://orcid.org/0000-0002-6080-7530. Email: [email protected]
Bruno Lot Tanko, Ph.D. [email protected]
Lecturer, School of the Built Environment, Univ. of Reading Malaysia, Educity, Johor 79200, Malaysia. Email: [email protected]
Mustafa Klufallah, Ph.D. [email protected]
Lecturer, School of the Built Environment, Univ. of Reading Malaysia, Educity, Johor 79200, Malaysia. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Industry 4.0 and Construction Contract Management: A Bibliometric Survey, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10.1061/JLADAH.LADR-988, 16, 3, (2024).
  • Trust, Team Effectiveness, and Strategies: A Comparative Study between Virtual and Face-to-Face Teams, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-14522, 150, 7, (2024).
  • Smart Contract Generation and Visualization for Construction Business Process Collaboration and Automation: Upgraded Workflow Engine, Journal of Computing in Civil Engineering, 10.1061/JCCEE5.CPENG-5938, 38, 6, (2024).
  • Factors, Challenges and Strategies of Trust in BIM-Based Construction Projects: A Case Study in Malaysia, Infrastructures, 10.3390/infrastructures8010013, 8, 1, (13), (2023).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share