Time, Cost, and Energy Consumption Analysis on Construction Optimization in High-Rise Buildings

Publication: Journal of Construction Engineering and Management
Volume 147, Issue 10

Abstract

The multiobjective optimization problems in project management have always been the issues on which project managers focus. Currently, few investigators consider the multiobjective optimization model suitable for high-rise buildings considering energy consumption optimization problems in construction. Nevertheless, the implementation of civil engineering in the construction industry is always an important cause of energy consumption. In this study, construction process analysis (CPA) is used to calculate statistical parameters of the energy consumption in high-rise buildings during the construction stage. Principal component analysis (PCA) is then used to describe the correlation among time, cost, and energy consumption, and also quantifies their interdependence. The statistical analysis illustrates that the correlation between energy consumption and cost is stronger than that between energy consumption and time. And the correlation between cost and time is similar to that between time and energy consumption. Additionally, cost and energy consumption have a positive correlation, cost and time have a negative correlation, and time and energy consumption also have a negative correlation. The major contribution of this study is to provide a time–cost–energy consumption multiobjective optimization model taking account of the different decision preferences of project managers. It could also help project managers create the best combination of project construction activities in practical engineering management. The simulation in a real case is proposed to verify the accuracy of the model. Furthermore, the model could also provide reference value for further construction projects.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

The data used to support the findings of this study are available from the corresponding author upon request.

Acknowledgments

This research was partially supported by the Natural Science Foundation of Hebei Province of China under Grant No. E2016203174.

References

Adalberth, K. 1997. “Energy use during the life cycle of single-unit dwellings: Examples.” Build. Environ. 32 (4): 321–329. https://doi.org/10.1016/S0360-1323(96)00069-8.
Afshar, A., A. K. Ziaraty, A. Kaveh, and F. Sharifi. 2009. “Nondominated archiving multicolony ant algorithm in time–cost trade-off optimization.” J. Constr. Eng. Manage. 135 (7): 668–674. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:7(668).
Agdas, D., D. J. Warne, J. Osio-Norgaard, and F. J. Masters. 2017. “Utility of genetic algorithms for solving large-scale construction time-cost trade-off problems.” J. Comput. Civ. Eng. 32 (1): 04017072. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000718.
Banihashemi, S. A., M. Khalilzadeh, A. Shahraki, M. R. Malkhalifeh, and S. S. R. Ahmadizadeh. 2020. “Optimization of environmental impacts of construction projects: A time–cost–quality trade-off approach.” Int. J. Environ. Sci. Technol. 18 (3): 631–646. https://doi.org/10.1007/s13762-020-02838-2.
Bettemir, Ö. H., and R. Sonmez. 2015. “Hybrid genetic algorithm with simulated annealing for resource-constrained project scheduling.” J. Manage. Eng. 31 (5): 04014082. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000323.
Bilec, M., R. Ries, H. S. Matthews, and A. L. Sharrard. 2006. “Example of a hybrid life-cycle assessment of construction processes.” J. Infrastruct. Syst. 12 (4): 207–215. https://doi.org/10.1061/(ASCE)1076-0342(2006)12:4(207).
CABEE (China Association of Building Energy Efficiency). 2018. Research report for buildings energy construction in China. Shanghai, China: CABEE.
Chang, N.-B., B. J. Rivera, and M. P. Wanielista. 2011. “Optimal design for water conservation and energy savings using green roofs in a green building under mixed uncertainties.” J. Cleaner Prod. 19 (11): 1180–1188. https://doi.org/10.1016/j.jclepro.2011.02.008.
Cheng, M.-Y., and D.-H. Tran. 2015. “Opposition-based multiple-objective differential evolution to solve the time–cost–environment impact trade-off problem in construction projects.” J. Comput. Civil Eng. 29 (5): 04014074. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000386.
Du, P., A. Wood, B. Stephens, and X. Song. 2015. “Life-cycle energy implications of downtown high-rise vs. suburban low-rise living: An overview and quantitative case study for Chicago.” Buildings 5 (3): 1003–1024. https://doi.org/10.3390/buildings5031003.
Elazouni, A., and M. A. Abido. 2014. “Enhanced trade-off of construction projects: Finance-resource-profit.” J. Constr. Eng. Manage. 140 (9): 04014043. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000880.
Elshaboury, N., T. Attia, and M. Marzouk. 2020. “Application of evolutionary optimization algorithms for rehabilitation of water distribution networks.” J. Constr. Eng. Manage. 146 (7): 04020069. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001856.
Feng, K., W. Lu, S. Chen, and Y. Wang. 2018. “An integrated environment–cost–time optimisation method for construction contractors considering global warming.” Sustainability 10 (11): 4207. https://doi.org/10.3390/su10114207.
Galiano-Garrigós, A., A. García-Figueroa, C. Rizo-Maestre, and Á. González-Avilés. 2019. “Evaluation of BIM energy performance and CO2 emissions assessment tools: A case study in warm weather.” Build. Res. Inf. 47 (7): 787–812. https://doi.org/10.1080/09613218.2019.1620093.
Gan, V. J. L., M. Deng, K. T. Tse, C. M. Chan, I. M. C. Lo, and J. C. P. Cheng. 2018. “Holistic BIM framework for sustainable low carbon design of high-rise buildings.” J. Cleaner Prod. 195 (Sep): 1091–1104. https://doi.org/10.1016/j.jclepro.2018.05.272.
Giouria, E. D., M. Tenpierika, and M. Turrina. 2020. “Zero energy potential of a high-rise office building in a Mediterranean climate: Using multi-objective optimization to understand the impact of design decisions towards zero-energy high-rise buildings.” Energy Build. 209 (Feb): 109666. https://doi.org/10.1016/j.enbuild.2019.109666.
Giran, O., R. Temur, and G. Bekdaş. 2017. “Resource constrained project scheduling by harmony search algorithm.” KSCE J. Civ. Eng. 21 (2): 479–487. https://doi.org/10.1007/s12205-017-1363-6.
He, W., Y. Shi, and D. Kong. 2019. “Construction of a 5D duration and cost optimisation model based on genetic algorithm and BIM.” J. Eng. Des. Technol. 17 (5): 929–942. https://doi.org/10.1108/JEDT-12-2018-0214.
He, X. 2013. The research of energy consumption and energy conservation in construction technology. Chongqing, China: Chongqing Univ.
Heravi, G., and S. Moridi. 2019. “Resource-constrained time-cost tradeoff for repetitive construction projects.” KSCE J. Civ. Eng. 23 (8): 3265–3274. https://doi.org/10.1007/s12205-019-0151-x.
Hu, S., D. Yan, Y. Cui, and S. Guo. 2016. “Urban residential heating in hot summer and cold winter zones of China—Status, modeling, and scenarios to 2030.” Energy Policy 92 (May): 158–170. https://doi.org/10.1016/j.enpol.2016.01.032.
Hu, W., and X. He. 2014. “An innovative time-cost-quality tradeoff modeling of building construction project based on resource allocation.” Sci. World J. 2014: 673248. https://doi.org/10.1155/2014/673248.
Huang, Z., and H. Zhao. 2016. “Construction resource scheduling with chaotic particle swarm optimization.” Int. J. Simul. Process Model. 11 (1): 1–8. https://doi.org/10.1504/IJSPM.2016.075065.
IEA (International Energy Agency). 2015. Energy use in China. Beijing: IEA.
Kibert, C. 2002. “Policy instruments for sustainable built environment.” Accessed October 29, 2020. https://heinonline.org/HOL/LandingPage?handle=hein.journals/jluenvl17&div=24&id=&page=.
Kurij, K., A. Milajic, and D. Beljakovic. 2014. “Analysis of construction dynamic plan using fuzzy critical path method.” Tehnika 69 (2): 209–215. https://doi.org/10.5937/tehnika1402209K.
Li, H., Y. Yang, K. Lv, J. Liu, and L. Yang. 2020. “Compare several methods of select typical meteorological year for building energy simulation in China.” Energy 209 (Oct): 118465. https://doi.org/10.1016/j.energy.2020.118465.
Liu, D., H. Li, H. Wang, C. Qi, and T. Rose. 2020. “Discrete symbiotic organisms search method for solving large-scale time-cost trade-off problem in construction scheduling.” Expert Syst. Appl. 148 (Jun): 113230. https://doi.org/10.1016/j.eswa.2020.113230.
Liu, S., R. Tao, and C. M. Tam. 2013. “Optimizing cost and CO2 emission for construction projects using particle swarm optimization.” Habitat Int. 37 (Jan): 155–162. https://doi.org/10.1016/j.habitatint.2011.12.012.
Liu, X., J. Chu, P. Yin, and J. Sun. 2017. “DEA cross-efficiency evaluation considering undesirable output and ranking priority: A case study of eco-efficiency analysis of coal-fired power plants.” J. Cleaner Prod. 142 (Part 2): 877–885. https://doi.org/10.1016/j.jclepro.2016.04.069.
Liu, Y. 2020. “Research on key points of cost control of green building project cost budget.” [In Chinese.] Housing Real Estate 2020 (21): 37.
Luo, Z., L. Yang, and J. Liu. 2016. “Embodied carbon emissions of office building: A case study of China’s 78 office buildings.” Build. Environ. 95 (Jan): 365–371. https://doi.org/10.1016/j.buildenv.2015.09.018.
Ma, Y. X., and C. Yu. 2020. “Impact of meteorological factors on high-rise office building energy consumption in Hong Kong: From a spatiotemporal perspective.” Energy Build. 228 (Dec): 110468. https://doi.org/10.1016/j.enbuild.2020.110468.
Marzouk, M., and M. Madany. 2008 “Handling construction pollutions using multi-objective optimization.” Constr. Manage. Econ. 26(10), 1113–1125. https://doi.org/10.1080/01446190802400779.
Mashayekhi, A., and G. Heravi. 2020. “A decision-making framework opted for smart building’s equipment based on energy consumption and cost trade-off using BIM and MIS.” J. Build. Eng. 32 (Nov): 101653. https://doi.org/10.1016/j.jobe.2020.101653.
Ministry of Public Security of the People’s Republic of China. 2014. Code for design of building fire protection. GB 50016-2014. Beijing: China Planning Press.
Oreszczyn, T., and R. Lowe. 2010. “Challenges for energy and buildings research: Objectives, methods and funding mechanisms.” Build. Res. Inf. 38 (1): 107–122. https://doi.org/10.1080/09613210903265432.
Ozcan-Deniz, G., and Y. Zhu. 2017. “Multi-objective optimization of greenhouse gas emissions in highway construction projects.” Sustainable Cities Soc. 28(Jan), 162–171. https://doi.org/10.1016/j.scs.2016.09.009.
Ozcan-Deniz, G., Y. Zhu, and V. Ceron. 2012. “Time, cost, and environmental impact analysis on construction operation optimization using genetic algorithms.” J. Manage. Eng. 28 (3): 265–272. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000098.
Papachristos, G. 2020. “Low carbon building performance in the construction industry: A multi-method approach of project management operations and building energy use applied in a UK public office building.” Constr. Manage. Econ. 38 (9): 856–876. https://doi.org/10.1080/01446193.2020.1748212.
Peng, B., F. L. Flager, and J. Wu. 2018. “A method to optimize mobile crane and crew interactions to minimize construction cost and time.” Autom. Constr. 95 (Nov): 10–19. https://doi.org/10.1016/j.autcon.2018.07.015.
Ponz-Tienda, J. L. 2017. “Improved adaptive harmony search algorithm for the resource leveling problem with minimal lags.” Autom. Constr. 77 (May): 82–92. https://doi.org/10.1016/j.autcon.2017.01.018.
Qu, S. 2020. “An interval-valued best–worst method with normal distribution for multi-criteria decision-making.” Arabian J. Sci. Eng. 46 (2): 1771–1785. https://doi.org/10.1007/s13369-020-05035-y.
Ramesh, T., R. Prakash, and K. K. Shukla. 2010. “Life cycle energy analysis of buildings: An overview.” Energy Build. 42 (10): 1592–1600. https://doi.org/10.1016/j.enbuild.2010.05.007.
Roukounis, C. N., G. Aretoulis, and T. Karambas. 2020. “A combination of PROMETHEE and goal programming methods for the evaluation of water airport connections.” Int. J. Decis. Support Syst. Technol. 12 (2): 50–66. https://doi.org/10.4018/IJDSST.2020040103.
Sonmez, R., S. Aminbakhsh, and T. Atan. 2020. “Activity uncrashing heuristic with noncritical activity rescheduling method for the discrete time-cost trade-off problem.” J. Constr. Eng. Manage. 146 (8): 04020084. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001870.
Toğan, V., and M. A. Eirgash. 2019. “Time-cost trade-off optimization of construction projects using teaching learning based optimization.” KSCE J. Civ. Eng. 23 (1): 10–20. https://doi.org/10.1007/s12205-018-1670-6.
Treloar, G. J., R. Fay, B. Ilozor, and P. E. D. Love. 2001. “An analysis of the embodied energy of office buildings by height.” Facilities 19 (5/6): 204–214. https://doi.org/10.1108/02632770110387797.
Wang, J., C. Yu, and W. Pan. 2018. “Life cycle energy of high-rise office buildings in Hong Kong.” Energy Build. 167 (May): 152–164. https://doi.org/10.1016/j.enbuild.2018.02.038.
Xu, J., H. Zheng, Z. Zeng, S. Wu, and M. Shen. 2012. “Discrete time–cost–environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty and its application to Jinping-II Hydroelectric Project.” Int. J. Project Manage. 30 (8): 950–966. https://doi.org/10.1016/j.ijproman.2012.01.019.
Yan, D. 2017. “A thorough assessment of China’s standard for energy consumption of buildings.” Energy Build. 143 (May):114–128. https://doi.org/10.1016/j.enbuild.2017.03.019.
Zhang, H. 2017. “An improved PSO method for optimal design of subsea oil pipelines.” Ocean Eng. 141 (Sep): 154–163. https://doi.org/10.1016/j.oceaneng.2017.06.023.
Zhang, Y. 2019. “Modelling of energy consumption and carbon emission from the building construction sector in China, a process-based LCA approach.” Energy Policy 134 (Nov): 110949. https://doi.org/10.1016/j.enpol.2019.110949.
Zhang, Y., and S. T. Ng. 2012. “An ant colony system based decision support system for construction time-cost optimization.” J. Civ. Eng. Manage. 18 (4): 580–589. https://doi.org/10.3846/13923730.2012.704164.
Zhou, Y., J. Shaojie, and G. Hongling. 2013. Virtual construction technology and practice of building engineering. Beijing: China Architecture and Building Press.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 147Issue 10October 2021

History

Received: Jan 15, 2021
Accepted: Jun 3, 2021
Published online: Aug 9, 2021
Published in print: Oct 1, 2021
Discussion open until: Jan 9, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Associate Professor, College of Civil Engineering and Mechanics, YanShan Univ., Qinhuangdao 066004, China (corresponding author). Email: [email protected]
Postgraduate Student, College of Civil Engineering and Mechanics, YanShan Univ., Qinhuangdao 066004, China. Email: [email protected]
Research Assistant, College of Civil Engineering and Mechanics, YanShan Univ., Qinhuangdao 066004, China. Email: [email protected]
Research Assistant, College of Civil Engineering and Mechanics, YanShan Univ., Qinhuangdao 066004, China. Email: [email protected]
Engineer, China Construction Seventh Engineering Div., Corp. Ltd., Chendong Rd., Zhengzhou 450000, China. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Evaluation of Urban Green Building Design Schemes to Achieve Sustainability Based on the Projection Pursuit Model Optimized by the Atomic Orbital Search, Sustainability, 10.3390/su141711007, 14, 17, (11007), (2022).
  • Artificial Intelligence in the Construction Industry: Main Development Trajectories and Future Outlook, Applied Sciences, 10.3390/app12125832, 12, 12, (5832), (2022).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share