Technical Papers
Aug 9, 2021

Practical Assessment of Potential Predictors of Serious Injuries and Fatalities in Construction

Publication: Journal of Construction Engineering and Management
Volume 147, Issue 10

Abstract

Serious injuries and fatalities (SIF) continue to be an enigmatic problem in the construction industry. Researchers have begun to explore new ways of preventing these incidents by developing and testing leading indicators, precursor analysis, and risk assessment supported by data analytics. These recent themes suggest a new paradigm in safety prediction. Aligned with this trajectory, the objectives of this study were to (1) identify a comprehensive list of potential predictors of SIFs in construction, including business factors, project characteristics, and crew demographics; (2) quantitatively prioritize potential predictors; and (3) develop a rank-ordered list of factors that could be tested for predictive validity and practically deployed on site. An expert panel of 22 industry practitioners generated 254 potential predictors of construction SIFs through structured brainstorming. To prioritize these potential predictors, the expert panel rated the extent to which each is measurable, predictive, simple, and actionable. Finally, a weighted sum method and a maximin approach was used to identify the predictors with the greatest practical potential for predicting SIF events, including brand-new concepts that have not yet been considered in the associated safety literature. Most previous research has focused on one specific form of safety prediction at a time (e.g., leading indicators), whereas this research effort is a first step toward a unified model with high feasibility and practical relevance.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

Acknowledgments

The authors would like to thank the Construction Safety Research Alliance for providing support for this research and the experts who participated in the study for their dedication, creativity, and insight.

References

Ajayi, S. O., L. O. Oyedele, M. Bilal, O. O. Akinade, H. A. Alaka, H. A. Owolabi, and K. O. Kadiri. 2015. “Waste effectiveness of the construction industry: Understanding the impediments and requisites for improvements.” Resour. Conserv. Recycl. 102 (Sep): 101–112. https://doi.org/10.1016/j.resconrec.2015.06.001.
Al-Bayati, A. J., O. Abudayyeh, T. Fredericks, and S. E. Butt. 2017. “Managing cultural diversity at U.S. construction sites: Hispanic workers’ perspectives.” J. Constr. Eng. Manage. 143 (9): 04017064. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001359.
Al-Bayati, A. J., A. Albert, and G. Ford. 2019. “Construction safety culture and climate: Satisfying necessity for an industry framework.” Pract. Period. Struct. Des. Constr. 24 (4): 04019028. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000452.
Alexander, D., M. Hallowell, and J. Gambatese. 2017a. “Precursors of construction fatalities. I: Iterative experiment to test the predictive validity of human judgment.” J. Constr. Eng. Manage. 143 (7): 04017023. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001304.
Alexander, D., M. Hallowell, and J. Gambatese. 2017b. “Precursors of construction fatalities. II: Predictive modeling and empirical validation.” J. Constr. Eng. Manage. 143 (7): 04017024. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001297.
Alruqi, W. M., and M. R. Hallowell. 2019. “Critical success factors for construction safety: Review and meta-analysis of safety leading indicators.” J. Constr. Eng. Manage. 145 (3): 04019005. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001626.
Alruqi, W. M., M. R. Hallowell, and U. Techera. 2018. “Safety climate dimensions and their relationship to construction safety performance: A meta-analytic review.” Saf. Sci. 109 (May): 165–173. https://doi.org/10.1016/j.ssci.2018.05.019.
Ameyaw, E. E., Y. Hu, M. Shan, A. P. C. Chan, and Y. Le. 2016. “Application of Delphi method in construction engineering and management research: A quantitative perspective.” J. Civ. Eng. Manage. 22 (8): 991–1000. https://doi.org/10.3846/13923730.2014.945953.
Aven, T. 2016. “Risk assessment and risk management: Review of recent advances on their foundation.” Eur. J. Oper. Res. 253 (1): 1–13.
Baradan, S., and M. A. Usmen. 2006. “Critical factors affecting schedule performance: Evidence from Indian Construction Projects.” J. Constr. Eng. Manage. 132 (Aug): 871–881.
Barbour, R. S., and J. Kitzinger. 1999. Developing focus group research: Politics, theory and practice. Thousand Oaks, CA: SAGE.
Bhandari, S., and K. R. Molenaar. 2020. “Using debiasing strategies to manage cognitive biases in construction risk management: Recommendations for practice and future research.” Pract. Period. Struct. Des. Constr. 25 (4): 04020033. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000521.
Boot, W. R., D. P. Blakely, and D. J. Simons. 2011. “Do action video games improve perception and cognition?” Front. Psychol. 2 (Sep): 1–6.
Bust, P. D., A. G. F. Gibb, and R. A. Haslam. 2005. “Manual handling of highway kerbs—Focus group findings.” Appl. Ergon. 36 (4 SPEC. ISS): 417–425. https://doi.org/10.1016/j.apergo.2004.05.005.
Chan, A. P. C., E. H. K. Yung, P. T. I. Lam, C. M. Tam, and S. O. Cheung. 2001. “Application of Delphi method in selection of procurement systems for construction projects.” Constr. Manage. Econ. 19 (7): 699–718. https://doi.org/10.1080/01446190110066128.
Choe, S., and F. Leite. 2016. “Assessing safety risk among different construction trades: Quantitative approach.” J. Constr. Eng. Manage. 143 (5): 04016133. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001237.
Comba, P., M. Martuzzi, and C. Botti. 2004. “Comparison of Bayesian-utilitarian and maximin principle approaches.” Int. J. Occup. Med. Environ. Health 17 (1): 193–196. https://doi.org/10.1080/10807030590920088.
Costin, A., A. Wehle, and A. Adibfar. 2019. “Leading indicators—A conceptual IoT-based framework to produce active leading indicators for construction safety.” Safety 5 (4): 86. https://doi.org/10.3390/safety5040086.
Dikmen, I., M. T. Birgonul, and S. Han. 2007. “Using fuzzy risk assessment to rate cost overrun risk in international construction projects.” Int. J. Project Manage. 25 (5): 494–505. https://doi.org/10.1016/j.ijproman.2006.12.002.
Ding, L. Y., and C. Zhou. 2013. “Development of web-based system for safety risk early warning in urban metro construction.” Autom. Constr. 34 (Sep): 45–55. https://doi.org/10.1016/j.autcon.2012.11.001.
Esmaeili, B., and M. R. Hallowell. 2012. “Diffusion of safety innovations in the construction industry.” J. Constr. Eng. Manage. 138 (8): 955–963. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000499.
Esmaeili, B., M. R. Hallowell, and B. Rajagopalan. 2015. “Attribute-based safety risk assessment. I: Analysis at the fundamental level.” J. Constr. Eng. Manage. 141 (8): 04015021. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000980.
Everett, J. G. 1999. “Overexertion injuries in construction.” J. Constr. Eng. Manage. 125 (Apr): 109–114. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:2(109).
Fortunato, B. R., M. R. Hallowell, M. Behm, and K. Dewlaney. 2012. “Identification of safety risks for high-performance sustainable construction projects.” J. Constr. Eng. Manage. 138 (4): 499–508. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000446.
Fung, I. W. H., V. W. Y. Tam, T. Y. Lo, and L. L. H. Lu. 2010. “Developing a risk assessment model for construction safety.” Int. J. Project Manage. 28 (6): 593–600. https://doi.org/10.1016/j.ijproman.2009.09.006.
Geng, L., and H. J. Hamilton. 2006. “Interestingness measures for data mining: A survey.” ACM Comput. Surv. 38 (3): 9. https://doi.org/10.1145/1132960.1132963.
Giardini, F., G. Coricelli, M. Joffily, and A. Sirigu. 2008. “Overconfidence in predictions as an effect desirability bias.” In Advances in decision making under risk and uncertainty, 163–180. Berlin: Springer.
Gillen, M., S. Kools, C. McCall, J. Sum, and K. Moulden. 2004. “Construction managers’ perceptions of construction safety practices in small and large firms: A qualitative investigation.” Work 23 (3): 233–243.
Goh, C. S., and H. Abdul-Rahman. 2013. “The identification and management of major risks in the Malaysian construction industry.” J. Constr. Dev. Countries 18 (1): 19–32.
Gratt, L. B. 1989. “The definition of risk and associated terminology for risk analysis.” In Risk assessment in setting national priorities, 675–680. Boston: Springer.
Guo, B. H. W., and T. W. Yiu. 2016. “Developing leading indicators to monitor the safety conditions of construction projects.” J. Manage. Eng. 32 (1): 1–14. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000376.
Guo, B. H. W., T. W. Yiu, V. A. González, and Y. M. Goh. 2017. “Using a pressure-state-practice model to develop safety leading indicators for construction projects.” J. Constr. Eng. Manage. 143 (2): 1–13. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001218.
Hallowell, M., B. Esmaeili, and P. Chinowsky. 2011. “Safety risk interactions among highway construction work tasks.” Constr. Manage. Econ. 29 (4): 417–429. https://doi.org/10.1080/01446193.2011.552512.
Hallowell, M. R., S. Bhandari, and W. Alruqi. 2019. “Methods of safety prediction: Analysis and integration of risk assessment, leading indicators, precursor analysis, and safety climate.” Constr. Manage. Econ. 38 (4): 308–321.
Hallowell, M. R., and M. E. Calhoun. 2011. “Interrelationships among highly effective construction injury prevention strategies.” J. Constr. Eng. Manage. 137 (11): 985–993. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000354.
Hallowell, M. R., and J. A. Gambatese. 2009a. “Activity-based safety risk quantification for concrete formwork construction.” J. Constr. Eng. Manage. 135 (10): 990–998. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000071.
Hallowell, M. R., and J. A. Gambatese. 2009b. “Construction safety risk mitigation.” J. Constr. Eng. Manage. 135 (12): 1316–1323. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000107.
Hallowell, M. R., and J. A. Gambatese. 2010. “Qualitative research: Application of the Delphi method to CEM research.” J. Constr. Eng. Manage. 136 (1): 99–107. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000137.
Hallowell, M. R., D. Hardison, and M. Desvignes. 2016. “Integrating empirical safety risk data with building information modeling, sensing, and visualization technologies Matthew.” Constr. Innovation 16 (3): 323–347. https://doi.org/10.1108/CI-09-2015-0047.
Hallowell, M. R., J. W. Hinze, K. C. Baud, and A. Wehle. 2013. “Proactive construction safety control: Measuring, monitoring, and responding to safety leading indicators.” J. Constr. Eng. Manage. 139 (10): 04013010. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000730.
Haslam, R. A., S. A. Hide, A. G. F. Gibb, D. E. Gyi, T. Pavitt, S. Atkinson, and A. R. Duff. 2005. “Contributing factors in construction accidents.” Appl. Ergon. 36 (4 SPEC. ISS): 401–415. https://doi.org/10.1016/j.apergo.2004.12.002.
Hinze, J., D. C. Bren, and N. Piepho. 1995. “Experience modification rating.” J. Constr. Eng. Manage. 121 (4): 455–458. https://doi.org/10.1061/(ASCE)0733-9364(1995)121:4(455).
Hinze, J., M. Hallowell, and K. Baud. 2013a. “Construction-safety best practices and relationships to safety performance.” J. Constr. Eng. Manage. 139 (10): 04013006. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000751.
Hinze, J., S. Thurman, and A. Wehle. 2013b. “Leading indicators of construction safety performance.” Saf. Sci. 51 (1): 23–28.
Hon, C. K. H., A. P. C. Chan, and M. C. H. Yam. 2014. “Relationships between safety climate and safety performance of building repair, maintenance, minor alteration, and addition (RMAA) works.” In Vol. 65 of Safety science, 10–19. Amsterdam, Netherlands: Elsevier.
Hopkins, A. 2009. “Thinking about process safety indicators.” Saf. Sci. 47 (4): 460–465. https://doi.org/10.1016/j.ssci.2007.12.006.
Huesman, J., L. Holland, and T. Langley. 2015. April 2015 construction AT $1,006.1 billion annual rate. Washington, DC: U.S. Census Bureau.
Isaac, S., and T. Edrei. 2016. “A statistical model for dynamic safety risk control on construction sites.” Autom. Constr. 63 (Mar): 66–78. https://doi.org/10.1016/j.autcon.2015.12.006.
Karakhan, A. A., and J. A. Gambatese. 2017. “Identification, quantification, and classification of potential safety risk for sustainable construction in the United States.” J. Constr. Eng. Manage. 143 (7): 04017018. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001302.
Kines, P. 2001. “Occupational injury risk assessment using injury severity odds ratios: Male falls from heights in the Danish construction industry, 1993-1999.” Hum. Ecol. Risk Assess. 7 (7): 1929–1943. https://doi.org/10.1080/20018091095492.
Krueger, R. A., and M. A. Casey. 2014. Focus groups: A practical guide for applied research. 5th ed. Beaverton, OR: Ringgold.
Lingard, H., T. Cooke, and N. Blismas. 2011. “Coworkers’ response to occupational health and safety: An overlooked dimension of group-level safety climate in the construction industry.” Eng. Constr. Archit. Manage. 18 (2): 159–175. https://doi.org/10.1108/09699981111111139.
Lingard, H., M. Hallowell, R. Salas, and P. Pirzadeh. 2017. “Leading or lagging? Temporal analysis of safety indicators on a large infrastructure construction project.” In Vol. 91 of Safety science, 206–220. Amsterdam, Netherlands: Elsevier.
Liu, H., and G. Tian. 2019. “Building engineering safety risk assessment and early warning mechanism construction based on distributed machine learning algorithm.” Safety Sci. 120 (Jul): 764–771.
Loosemore, M. 2014. “Improving construction productivity: A subcontractor’s perspective.” Eng. Constr. Archit. Manage. 21 (3): 245–260. https://doi.org/10.1108/ECAM-05-2013-0043.
Loosemore, M., V. Chow, and D. McGeorge. 2014. “Managing the health risks of extreme weather events by managing hospital infrastructure.” Eng. Constr. Archit. Manage. 21 (1): 4–32. https://doi.org/10.1108/ECAM-10-2012-0060.
Manjourides, J., and J. T. Dennerlein. 2019. “Testing the associations between leading and lagging indicators in a contractor safety pre-qualification database.” Am. J. Ind. Med. 62 (4): 317–324.
Manju, M. A., M. J. J. M. Candel, and M. P. F. Berger. 2014. “Sample size calculation in cost-effectiveness cluster randomized trials: Optimal and maximin approaches.” Stat. Med. 33 (15): 2538–2553. https://doi.org/10.1002/sim.6112.
McGarry, K. 2005. “A survey of interestingness measures for knowledge discovery.” Knowl. Eng. Rev. 20 (1): 39–61. https://doi.org/10.1017/S0269888905000408.
Mitropoulos, P., and M. Namboodiri. 2011. “New method for measuring the safety risk of construction activities: Task demand assessment.” J. Constr. Eng. Manage. 137 (1): 30–38. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000246.
Nadhim, E. A., C. Hon, B. Xia, I. Stewart, and D. Fang. 2018. “Investigating the relationships between safety climate and safety performance indicators in retrofitting works.” Constr. Econ. Build. 18 (2): 110–129. https://doi.org/10.5130/AJCEB.v18i2.5994.
National Academy of Engineering. 2004. Accident precursor analysis and management. Edited by J. R. Phimister, V. M. Bier, and H. C. Kunreuther. Washington, DC: National Academy of Engineering.
Okpala, I., C. Nnaji, and A. A. Karakhan. 2020. “Utilizing emerging technologies for construction safety risk mitigation.” Pract. Period. Struct. Des. Constr. 25 (2): 04020002. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000468.
Olawumi, T. O., D. W. M. Chan, J. K. W. Wong, and A. P. C. Chan. 2018. “Barriers to the integration of BIM and sustainability practices in construction projects: A Delphi survey of international experts.” J. Build. Eng. 20 (Jun): 60–71.
Osborn, A. F. 1963. “Applied imagination.” In Principles and procedures of creative problem solving. 619th ed. New York: Charles Scribner’s Sons.
Panuwatwanich, K., S. Al-Haadir, and R. A. Stewart. 2017. “Influence of safety motivation and climate on safety behaviour and outcomes: evidence from the Saudi Arabian construction industry.” Int. J. Occup. Saf. Ergon. 23 (1): 60–75. https://doi.org/10.1080/10803548.2016.1235424.
Perera, B. A. K. S., R. Rameezdeen, N. Chileshe, and M. Reza Hosseini. 2014. “Enhancing the effectiveness of risk management practices in Sri Lankan road construction projects: A Delphi approach.” Int. J. Constr. Manage. 14 (1): 1–14. https://doi.org/10.1080/15623599.2013.875271.
Petitta, L., T. M. Probst, C. Barbaranelli, and V. Ghezzi. 2017. “Disentangling the roles of safety climate and safety culture: Multi-level effects on the relationship between supervisor enforcement and safety compliance.” In Vol. 99 of Accident analysis and prevention, 77–89. Amsterdam, Netherlands: Elsevier.
Poh, C. Q. X., C. U. Ubeynarayana, and Y. M. Goh. 2018. “Safety leading indicators for construction sites: A machine learning approach.” Autom. Constr. 93 (Oct): 375–386. https://doi.org/10.1016/j.autcon.2018.03.022.
Project Management Institute. 2016. Construction extension to the PMBOK guide. Newtown Square, PA: O’Reilly Media.
Renzi, A. B., and S. Freitas. 2015. “The Delphi method for future scenarios construction.” Procedia Manuf. 3 (Jan): 5785–5791.
Salas, R., and M. Hallowell. 2016. “Predictive validity of safety leading indicators: Empirical assessment in the oil and gas sector.” J. Constr. Eng. Manage. 142 (10): 04016052. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001167.
Schwatka, N. V., and J. C. Rosecrance. 2016. “Safety climate and safety behaviors in the construction industry: The importance of co-workers commitment to safety.” Work 54 (2): 401–413. https://doi.org/10.3233/WOR-162341.
Shyur, H. J. 2008. “A quantitative model for aviation safety risk assessment.” Comput. Ind. Eng. 54 (1): 34–44. https://doi.org/10.1016/j.cie.2007.06.032.
Siu, O. L., D. R. Phillips, and T. W. Leung. 2004. “Safety climate and safety performance among construction workers in Hong Kong: The role of psychological strains as mediators.” Accid. Anal. Prev. 36 (3): 359–366. https://doi.org/10.1016/S0001-4575(03)00016-2.
Tixier, A. J. P., M. R. Hallowell, and B. Rajagopalan. 2017. “Construction safety risk modeling and simulation.” Risk Anal. 37 (10): 1917–1935. https://doi.org/10.1111/risa.12772.
Tixier, A. J. P., M. R. Hallowell, B. Rajagopalan, and D. Bowman. 2016a. “Automated content analysis for construction safety: A natural language processing system to extract precursors and outcomes from unstructured injury reports.” Autom. Constr. 62 (Feb): 45–56. https://doi.org/10.1016/j.autcon.2015.11.001.
Tixier, A. J. P., M. R. Hallowell, B. Rajagopalan, and D. Bowman. 2016b. “Application of machine learning to construction injury prediction.” Autom. Constr. 69 (Sep): 102–114. https://doi.org/10.1016/j.autcon.2016.05.016.
Tripathi, K. K., K. N. Jha, and D. Ph. 2018. “Determining success factors for a construction organization : A structural equation modeling approach.” J. Manage. Eng. 34 (1): 04017050. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000569.
US Bureau of Labor Statistics. 2018. “Census of fatal occupational injuries (CFOI)-current and revised data.” https://www.bls.gov/iif/oshcfoi1.htm#2018.
Versteeg, K., P. Bigelow, A. M. Dale, and A. Chaurasia. 2019. “Utilizing construction safety leading and lagging indicators to measure project safety performance: A case study.” Saf. Sci. 120 (Jul): 411–421.
Wald, A. 1945. “Statistical decision functions which minimize the maximum risk.” Ann. Math. 46 (2): 265–280. https://doi.org/10.2307/1969022.
Wang, J., and S. Razavi. 2019. “Network-based safety leading indicators for safety risk analysis in construction.” In Proc., Human Factors and Ergonomics Society Annual Meeting, Thousand Oaks, CA: SAGE.
Wang, J., P. X. W. Zou, and P. P. Li. 2016. “Critical factors and paths influencing construction workers’ safety risk tolerances.” In Vol. 93 of Accident analysis and prevention, 267–279. Amsterdam, Netherlands: Elsevier.
Wang, Z. Z., and C. Chen. 2017. “Fuzzy comprehensive Bayesian network-based safety risk assessment for metro construction projects.” Tunnelling Underground Space Technol. 70 (Aug): 330–342.
Wilbanks, D. W. 2019. “Contractor safety prequalification: The reality of demanded written programs.” Prof. Saf. 63 (7): 36–40.
Xing, X., B. Zhong, H. Luo, H. Li, and H. Wu. 2019. “Ontology for safety risk identification in metro construction.” Comput. Ind. 109 (1): 14–30.
Yeung, J. F. Y., A. P. C. Chan, and D. W. M. Chan. 2008. “Establishing quantitative indicators for measuring the partnering performance of construction projects in Hong Kong.” Constr. Manage. Econ. 26 (3): 277–301. https://doi.org/10.1080/01446190701793688.
Zhang, L., M. J. Skibniewski, X. Wu, Y. Chen, and Q. Deng. 2014a. “A probabilistic approach for safety risk analysis in metro construction.” In Vol. 63 of Safety science, 8–17. Amsterdam, Netherlands: Elsevier.
Zhang, L., X. Wu, M. J. Skibniewski, J. Zhong, and Y. Lu. 2014b. “Bayesian-network-based safety risk analysis in construction projects.” In Vol. 131 of Reliability engineering and system safety, 29–39. Amsterdam, Netherlands: Elsevier.
Zhang, S., C. Shang, C. Wang, R. Song, and X. Wang. 2019. “Real-time safety risk identification model during metro construction adjacent to buildings.” J. Constr. Eng. Manage. 145 (6): 04019034. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001657.
Zou, P. X. W., and R. Y. Sunindijo. 2013. “Skills for managing safety risk, implementing safety task, and developing positive safety climate in construction project.” Autom. Constr. 34 (Sep): 92–100. https://doi.org/10.1016/j.autcon.2012.10.018.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 147Issue 10October 2021

History

Received: Oct 20, 2020
Accepted: May 14, 2021
Published online: Aug 9, 2021
Published in print: Oct 1, 2021
Discussion open until: Jan 9, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Graduate Research Assistant, Dept. of Civil, Environmental, and Architectural Engineering, Univ. of Colorado Boulder, 1111 Engineering Dr. ECCE 153, Boulder, CO 80309-0428 (corresponding author). ORCID: https://orcid.org/0000-0001-9793-8393. Email: [email protected]
Matthew R. Hallowell, Ph.D. [email protected]
Beavers Professor of Construction Engineering and Executive Director of Construction Safety Research Alliance, Dept. of Civil, Environmental and Architectural Engineering, Univ. of Colorado at Boulder, 1111 Engineering Dr. ECOT 511, Boulder, CO 80309-0428. Email: [email protected]
Siddharth Bhandari, Ph.D., A.M.ASCE [email protected]
Associate Director of Construction Safety Research Alliance, Dept. of Civil, Environmental, and Architectural Engineering, Univ. of Colorado Boulder, 1111 Engineering Dr., Boulder, CO 80309-0428. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Quantifying the Mediating Effect of Frontline Supervisors on Workers’ Safety Actions: A Construction Safety Culture Focus, Practice Periodical on Structural Design and Construction, 10.1061/PPSCFX.SCENG-1514, 29, 3, (2024).
  • Developing an Integrated Construction Safety Management System for Accident Prevention, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-6074, 40, 6, (2024).
  • Predicting Serious Injury and Fatality Exposure Using Machine Learning in Construction Projects, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-13741, 150, 3, (2024).
  • Machine Learning–Based Bayesian Framework for Interval Estimate of Unsafe-Event Prediction in Construction, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-13549, 149, 11, (2023).
  • Assessment Tool for Human–Robot Interaction Safety Risks during Construction Operations, Journal of Construction Engineering and Management, 10.1061/(ASCE)CO.1943-7862.0002432, 149, 1, (2023).
  • Severe injuries among construction workers: Insights from OSHA’s new severe injury reporting program, Safety Science, 10.1016/j.ssci.2023.106126, 163, (106126), (2023).
  • Construction Safety Risk Model with Construction Accident Network: A Graph Convolutional Network Approach, Sustainability, 10.3390/su142315906, 14, 23, (15906), (2022).
  • Comparative Analysis of the National Fatality Rate in Construction Industry Using Time-Series Approach and Equivalent Evaluation Conditions, International Journal of Environmental Research and Public Health, 10.3390/ijerph19042312, 19, 4, (2312), (2022).
  • Incident Analysis and Prediction of Safety Performance on Construction Sites, CivilEng, 10.3390/civileng3030039, 3, 3, (669-686), (2022).
  • Customized AutoML: An Automated Machine Learning System for Predicting Severity of Construction Accidents, Buildings, 10.3390/buildings12111933, 12, 11, (1933), (2022).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share