State-of-the-Art Reviews
May 30, 2019

Understanding Stakeholders in Off-Site Manufacturing: A Literature Review

Publication: Journal of Construction Engineering and Management
Volume 145, Issue 8

Abstract

Off-site manufacturing (OSM) has attracted much attention in the construction industry. OSM stakeholders are crucial in its implementation and are distinct in regard to their management. However, an in-depth understanding of OSM stakeholders and their coordination is still lacking. The paper intends to (1) provide a critical review and analysis of OSM stakeholders based on prior studies, and (2) develop a research framework for their future practice and improvement. A qualitative content analysis was adopted to analyze 149 journal papers. The results indicated an increased interest in exploring OSM stakeholders’ issues since 2007. In addition, prior studies focused on the two research themes of stakeholder perceptions and behaviors and stakeholder management. Eleven specific research topics were identified within the two themes, with perceived drivers of and barriers to OSM adoption being the most popular. A research framework was also proposed for systemically articulating developments and gaps for OSM stakeholders. The research contributes to an in-depth understanding of OSM stakeholders and their future practice and improvement in the industry.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Data generated or analyzed during the study are available from the corresponding author by request. Information about the Journal’s data-sharing policy can be found here: https://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001263.

Acknowledgments

This work was supported by the Australian Research Council (Grant No. DP170104612).

References

Aaltonen, K., and J. Kujala. 2016. “Towards an improved understanding of project stakeholder landscapes.” Int. J. Project Manage. 34 (8): 1537–1552. https://doi.org/10.1016/j.ijproman.2016.08.009.
Alazzaz, F., and A. Whyte. 2015. “Linking employee empowerment with productivity in off-site construction.” Eng. Constr. Archit. Manage. 22 (1): 21–37. https://doi.org/10.1108/ECAM-09-2013-0083.
Ali, M., A. N. Jaafar, I. Kamaruddin, and H. A. Rahman. 2012. “Construction quality of school buildings using the industrialised building system (IBS).” Malaysian Constr. Res. J. 11 (2): 21–35.
Arashpour, M., R. Wakefield, B. Abbasi, M. Arashpour, and R. Hosseini. 2018. “Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources.” Archit. Eng. Des. Manage. 14 (1–2): 46–59. https://doi.org/10.1080/17452007.2017.1302406.
Arif, M., J. Goulding, and F. P. Rahimian. 2012. “Promoting off-site construction: Future challenges and opportunities.” J. Archit. Eng. 18 (2): 75–78. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000081.
Armacost, R. L., P. J. Componation, M. A. Mullens, and W. W. Swart. 1994. “An AHP framework for prioritizing customer requirements in QFD: An industrialized housing application.” IIE Trans. 26 (4): 72–79. https://doi.org/10.1080/07408179408966620.
Atkin, B., and M. Skitmore. 2008. “Editorial: Stakeholder management in construction.” Constr. Manage. Econ. 26 (6): 549–552. https://doi.org/10.1080/01446190802142405.
Azam Haron, N., H. Abdul-Rahman, C. Wang, and L. C. Wood. 2015. “Quality function deployment modelling to enhance industrialised building system adoption in housing projects.” Total Qual. Manage. Bus. Excellence 26 (7–8): 703–718. https://doi.org/10.1080/14783363.2014.880626.
Azhar, S., M. Y. Lukkad, and I. Ahmad. 2013. “An investigation of critical factors and constraints for selecting modular construction over conventional stick-built technique.” Int. J. Constr. Educ. Res. 9 (3): 203–225. https://doi.org/10.1080/15578771.2012.723115.
Badir, Y. F., M. R. A. Kadir, and A. H. Hashim. 2002. “Industrialized building systems construction in Malaysia.” J. Archit. Eng. 8 (1): 19–23. https://doi.org/10.1061/(ASCE)1076-0431(2002)8:1(19).
Bergström, M., and L. Stehn. 2005. “Benefits and disadvantages of ERP in industrialised timber frame housing in Sweden.” Constr. Manage. Econ. 23 (8): 831–838. https://doi.org/10.1080/01446190500184097.
Bildsten, L. 2014. “Buyer-supplier relationships in industrialized building.” Constr. Manage. Econ. 32 (1–2): 146–159. https://doi.org/10.1080/01446193.2013.812228.
Bildsten, L., A. Björnfot, and E. Sandberg. 2011. “Value-driven purchasing of kitchen cabinets in industrialised housing.” J. Financial Manage. Property Constr. 16 (1): 73–83. https://doi.org/10.1108/13664381111116106.
Blismas, N., and R. Wakefield. 2009. “Drivers, constraints and the future of offsite manufacture in Australia.” Constr. Innovation 9 (1): 72–83. https://doi.org/10.1108/14714170910931552.
Blismas, N. G., M. Pendlebury, A. Gibb, and C. Pasquire. 2005. “Constraints to the use of off-site production on construction projects.” Archit. Eng. Des. Manage. 1 (3): 153–162. https://doi.org/10.1080/17452007.2005.9684590.
Brege, S., L. Stehn, and T. Nord. 2014. “Business models in industrialized building of multi-storey houses.” Constr. Manage. Econ. 32 (1–2): 208–226. https://doi.org/10.1080/01446193.2013.840734.
Chan, J. K. W., A. P. C. Chan, and F. W. C. Kung. 2004. “Using innovative prefabrications as the source of competitive advantage for contractors—Case studies in Hong Kong.” Archit. Sci. Rev. 47 (2): 183–192. https://doi.org/10.1080/00038628.2004.9697042.
Chen, Y., G. E. Okudan, and D. R. Riley. 2010. “Sustainable performance criteria for construction method selection in concrete buildings.” Autom. Constr. 19 (2): 235–244. https://doi.org/10.1016/j.autcon.2009.10.004.
Chiang, Y. H., B. S. Tang, and F. Wong. 2008. “Volume building as competitive strategy.” Constr. Manage. Econ. 26 (2): 161–176. https://doi.org/10.1080/01446190701749151.
Chinowsky, P. S., and J. E. Meredith. 2000. “Strategic management in construction.” J. Constr. Eng. Manage. 126 (1): 1–9. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:1(1).
Choi, J. O., X. B. Chen, and T. W. Kim. 2019. “Opportunities and challenges of modular methods in dense urban environment.” Int. J. Constr. Manage. 19 (2): 93–105.
Choi, J. O., J. T. O’Connor, and T. W. Kim. 2016. “Recipes for cost and schedule successes in industrial modular projects: Qualitative comparative analysis.” J. Constr. Eng. Manage. 142 (10): 04016055. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001171.
CII (Construction Industry Institute). 2002. Prefabrication, preassembly, modularization, and offsite fabrication in industrial construction: A framework for decision-making. Austin, TX: Univ. of Texas at Austin.
CII (Construction Industry Institute). 2013. Industrial modularization: Five solution elements. Austin, TX: Univ. of Texas at Austin.
CIRIA (Construction Industry Research and Information Association). 1999. Adding value to construction projects through standardisation and pre-assembly.. London: CIRIA.
Dawood, N. N., and R. H. Neale. 1993. “Forecasting the sales of precast concrete building products.” Constr. Manage. Econ. 11 (2): 81–98. https://doi.org/10.1080/01446199300000002.
Donaldson, T., and L. E. Preston. 1995. “The stakeholder theory of the corporation: Concepts, evidence, and implications.” Acad. Manage. Rev. 20 (1): 65–91. https://doi.org/10.5465/amr.1995.9503271992.
Doran, D., and M. Giannakis. 2011. “An examination of a modular supply chain: A construction sector perspective.” Supply Chain Manage.: Int. J. 16 (4): 260–270. https://doi.org/10.1108/13598541111139071.
Downe-Wamboldt, B. 1992. “Content analysis: Method, applications, and issues.” Health Care Women Int. 13 (3): 313–321.
Dzulkalnine, N., M. N. A. Azman, K. W. Bing, N. F. Habidin, and A. R. Ayub. 2016. “Issues of payment procurement process for industrialised building system (IBS) project.” J. Teknologi 78 (5–10): 11–15.
Elias, A. A., R. Y. Cavana, and L. S. Jackson. 2002. “Stakeholder analysis for R & D project management.” R&D Manage. 32 (4): 301–310. https://doi.org/10.1111/1467-9310.00262.
Elo, S., and H. Kyngäs. 2008. “The qualitative content analysis process.” J. Adv. Nurs. 62 (1): 107–115. https://doi.org/10.1111/j.1365-2648.2007.04569.x.
Falagas, M. E., E. I. Pitsouni, G. A. Malietzis, and G. Pappas. 2007. “Comparison of PubMed, Scopus, Web of Science, and Google Scholar: Strengths and weaknesses.” FASEB J. 22 (2): 338–342. https://doi.org/10.1096/fj.07-9492LSF.
Fox, P., and M. Skitmore. 2007. “Factors facilitating construction industry development.” Build. Res. Inf. 35 (2): 178–188. https://doi.org/10.1080/09613210600980192.
Freeman, R. E. 1984. Strategic management: A stakeholder approach. Boston: Pitman.
Fulford, R., and C. Standing. 2014. “Construction industry productivity and the potential for collaborative practice.” Int. J. Project Manage. 32 (2): 315–326. https://doi.org/10.1016/j.ijproman.2013.05.007.
Gan, X., R. Chang, and T. Wen. 2018a. “Overcoming barriers to off-site construction through engaging stakeholders: A two-mode social network analysis.” J. Cleaner Prod. 201: 735–747. https://doi.org/10.1016/j.jclepro.2018.07.299.
Gan, X., R. Chang, J. Zuo, T. Wen, and G. Zillante. 2018b. “Barriers to the transition towards off-site construction in China: An interpretive structural modeling approach.” J. Cleaner Prod. 197: 8–18. https://doi.org/10.1016/j.jclepro.2018.06.184.
Gan, Y., L. Shen, J. Chen, V. Tam, Y. Tan, and I. Illankoon. 2017. “Critical factors affecting the quality of industrialized building system projects in China.” Sustainability 9 (2): 216. https://doi.org/10.3390/su9020216.
Gao, S., S. P. Low, and K. Nair. 2018. “Design for manufacturing and assembly (DfMA): A preliminary study of factors influencing its adoption in Singapore.” Archit. Eng. Des. Manage. 14 (6): 440–456. https://doi.org/10.1080/17452007.2018.1502653.
Gibb, A. G. 1999. Off-site fabrication: Prefabrication, pre-assembly and modularisation. New York: Wiley.
Gibb, A. G. F., and F. Isack. 2003. “Re-engineering through pre-assembly: Client expectations and drivers.” Build. Res. Inf. 31 (2): 146–160. https://doi.org/10.1080/09613210302000.
Gibb, A. G. F., and R. H. Neale. 1997. “Management of prefabrication for complex cladding: Case study.” J. Archit. Eng. 3 (2): 60–69. https://doi.org/10.1061/(ASCE)1076-0431(1997)3:2(60).
Goodier, C., and A. Gibb. 2007. “Future opportunities for offsite in the UK.” Constr. Manage. Econ. 25 (6): 585–595. https://doi.org/10.1080/01446190601071821.
Goulding, J., W. Nadim, P. Petridis, and M. Alshawi. 2012. “Construction industry offsite production: A virtual reality interactive training environment prototype.” Adv. Eng. Inf. 26 (1): 103–116. https://doi.org/10.1016/j.aei.2011.09.004.
Goulding, J. S., F. Pour Rahimian, M. Arif, and M. D. Sharp. 2015. “New offsite production and business models in construction: Priorities for the future research agenda.” Archit. Eng. Des. Manage. 11 (3): 163–184. https://doi.org/10.1080/17452007.2014.891501.
Hairstans, R., and R. E. Smith. 2018. “Offsite HUB (Scotland): Establishing a collaborative regional framework for knowledge exchange in the UK.” Archit. Eng. Des. Manage. 14 (1–2): 60–77. https://doi.org/10.1080/17452007.2017.1314858.
Hampson, K., and P. Brandon. 2004. “Construction 2020: A vision for Australia’s property and construction industry.” Accessed October 10, 2018. https://eprints.qut.edu.au/40762/1/40762.pdf.
Han, Y., and L. Wang. 2018. “Identifying barriers to off-site construction using grey DEMATEL approach: Case of China.” J. Civ. Eng. Manage. 24 (5): 364–377. https://doi.org/10.3846/jcem.2018.5181.
Hanafi, M. H., A. Abas, F. A. Ibrahim, and S. Abdullah. 2016. “Readiness for industrialized building system implementation among Malaysian architectural firms’ members.” J. Teknologi 78 (7): 195–203.
Hanna, A. S., G. Mikhail, and K. A. Iskandar. 2017. “State of prefab practice in the electrical construction industry: Qualitative assessment.” J. Constr. Eng. Manage. 143 (2): 04016097. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001236.
Hassim, S., M. S. Jaafar, and S. A. A. H. Sazalli. 2009. “The contractor perception towers industrialised building system risk in construction projects in Malaysia.” Am. J. Appl. Sci. 6 (5): 937–942. https://doi.org/10.3844/ajassp.2009.937.942.
Hedgren, E., and L. Stehn. 2014. “The impact of clients’ decision-making on their adoption of industrialized building.” Constr. Manage. Econ. 32 (1–2): 126–145. https://doi.org/10.1080/01446193.2013.833340.
Hofman, E., H. Voordijk, and J. Halman. 2009. “Matching supply networks to a modular product architecture in the house-building industry.” Build. Res. Inf. 37 (1): 31–42. https://doi.org/10.1080/09613210802628003.
Höök, M., and L. Stehn. 2008. “Applicability of lean principles and practices in industrialized housing production.” Constr. Manage. Econ. 26 (10): 1091–1100. https://doi.org/10.1080/01446190802422179.
Hosseini, M. R., I. Martek, E. K. Zavadskas, A. A. Aibinu, M. Arashpour, and N. Chileshe. 2018. “Critical evaluation of off-site construction research: A scientometric analysis.” Autom. Constr. 87: 235–247. https://doi.org/10.1016/j.autcon.2017.12.002.
Hsieh, T.-Y. 1997. “The economic implication of subcontracting practice on building prefabrication.” Autom. Constr. 6: 163–174. https://doi.org/10.1016/S0926-5805(97)00001-0.
Hu, X., B. Xia, M. Skitmore, and Q. Chen. 2016. “The application of case-based reasoning in construction management research: An overview.” Autom. Constr. 72: 65–74. https://doi.org/10.1016/j.autcon.2016.08.023.
Hwang, B. G., M. Shan, and K. Y. Looi. 2018a. “Key constraints and mitigation strategies for prefabricated prefinished volumetric construction.” J. Cleaner Prod. 183: 183–193. https://doi.org/10.1016/j.jclepro.2018.02.136.
Hwang, B. G., M. Shan, and K. Y. Looi. 2018b. “Knowledge-based decision support system for prefabricated prefinished volumetric construction.” Autom. Constr. 94: 168–178. https://doi.org/10.1016/j.autcon.2018.06.016.
Ismail, Z. A., A. A. Mutalib, and N. Hamzah. 2016. “Case study to analyse problems and issues in IBS building maintenance.” Int. J. Appl. Eng. Res. 11 (1): 226–232.
Jaillon, L., and C. Poon. 2010. “Design issues of using prefabrication in Hong Kong building construction.” Constr. Manage. Econ. 28 (10): 1025–1042. https://doi.org/10.1080/01446193.2010.498481.
Jaillon, L., and C. S. Poon. 2008. “Sustainable construction aspects of using prefabrication in dense urban environment: A Hong Kong case study.” Constr. Manage. Econ. 26 (9): 953–966. https://doi.org/10.1080/01446190802259043.
Jaillon, L., and C. S. Poon. 2009. “The evolution of prefabricated residential building systems in Hong Kong: A review of the public and the private sector.” Autom. Constr. 18 (3): 239–248. https://doi.org/10.1016/j.autcon.2008.09.002.
Jaillon, L., and C. S. Poon. 2014. “Life cycle design and prefabrication in buildings: A review and case studies in Hong Kong.” Autom. Constr. 39: 195–202. https://doi.org/10.1016/j.autcon.2013.09.006.
Jeong, J. G., M. Hastak, and M. Syal. 2006. “Supply chain analysis and modeling for the manufactured housing industry.” J. Urban Plann. Dev. 132 (1): 1–9. https://doi.org/10.1061/(ASCE)0733-9488(2006)132:1(1).
Jeong, J. G., M. Hastak, and M. Syal. 2009. “Framework of manufacturer-retailer relationship in the manufactured housing construction.” Constr. Innovation 9 (1): 22–41. https://doi.org/10.1108/14714170910931516.
Jiang, L., Z. Li, L. Li, and Y. Gao. 2018a. “Constraints on the promotion of prefabricated construction in China.” Sustainability 10 (7): 2516. https://doi.org/10.3390/su10072516.
Jiang, R., C. Mao, L. Hou, C. Wu, and J. Tan. 2018b. “A SWOT analysis for promoting off-site construction under the backdrop of China’s new urbanisation.” J. Cleaner Prod. 173: 225–234. https://doi.org/10.1016/j.jclepro.2017.06.147.
Kamali, M., and K. Hewage. 2016. “Life cycle performance of modular buildings: A critical review.” Renewable Sustainable Energy Rev. 62: 1171–1183. https://doi.org/10.1016/j.rser.2016.05.031.
Kamali, M., and K. Hewage. 2017. “Development of performance criteria for sustainability evaluation of modular versus conventional construction methods.” J. Cleaner Prod. 142: 3592–3606. https://doi.org/10.1016/j.jclepro.2016.10.108.
Kamali, M., K. Hewage, and A. S. Milani. 2018. “Life cycle sustainability performance assessment framework for residential modular buildings: Aggregated sustainability indices.” Build. Environ. 138: 21–41. https://doi.org/10.1016/j.buildenv.2018.04.019.
Kamar, K. A. M., M. N. A. Azman, and M. N. M. Nawi. 2014. “IBS survey 2010: Drivers, barriers and critical success factors in adopting industrialised building system (IBS) construction by G7 contractors in Malaysia.” J. Eng. Sci. Technol. 9 (4): 490–501.
Kamar, K. A. M., Z. A. Hamid, M. K. Ghani, A. H. A. Rahim, M. Z. M. Zain, and F. Ambon. 2012. “Business strategy of large contractors in adopting industrialised building system (IBS): The Malaysian case.” J. Eng. Sci. Technol. 7 (6): 774–784.
Kempton, J. 2010. “Modern methods of construction and RSL asset management: A quantitative study.” Struct. Surv. 28 (2): 121–131. https://doi.org/10.1108/02630801011044226.
Kempton, J., and P. Syms. 2009. “Modern methods of construction: Implications for housing asset management in the RSL sector.” Struct. Surv. 27 (1): 36–45. https://doi.org/10.1108/02630800910941674.
Kim, S., M. A. Nussbaum, and B. Jia. 2012. “The benefits of an additional worker are task-dependent: Assessing low-back injury risks during prefabricated (panelized) wall construction.” Appl. Ergon. 43 (5): 843–849. https://doi.org/10.1016/j.apergo.2011.12.005.
Laplume, A. O., K. Sonpar, and R. A. Litz. 2008. “Stakeholder theory: Reviewing a theory that moves us.” J. Manage. 34 (6): 1152–1189. https://doi.org/10.1177/0149206308324322.
Larsson, J., P. E. Eriksson, T. Olofsson, and P. Simonsson. 2014. “Industrialized construction in the Swedish infrastructure sector: Core elements and barriers.” Constr. Manage. Econ. 32 (1–2): 83–96. https://doi.org/10.1080/01446193.2013.833666.
Lessing, J., and S. Brege. 2018. “Industrialized building companies’ business models: Multiple case study of Swedish and North American companies.” J. Constr. Eng. Manage. 144 (2): 05017019. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001368.
Li, C. Z., J. Hong, F. Xue, G. Q. Shen, X. Xu, and L. Luo. 2016. “SWOT analysis and Internet of things-enabled platform for prefabrication housing production in Hong Kong.” Habitat Int. 57: 74–87. https://doi.org/10.1016/j.habitatint.2016.07.002.
Li, H. X., M. Al-Hussein, Z. Lei, and Z. Ajweh. 2013. “Risk identification and assessment of modular construction utilizing fuzzy analytic hierarchy process (AHP) and simulation.” Can. J. Civ. Eng. 40 (12): 1184–1195. https://doi.org/10.1139/cjce-2013-0013.
Li, L., Z. Li, G. Wu, and X. Li. 2018. “Critical success factors for project planning and control in prefabrication housing production: A China study.” Sustainability 10 (3): 836. https://doi.org/10.3390/su10030836.
Li, Z., G. Q. Shen, and X. Xue. 2014. “Critical review of the research on the management of prefabricated construction.” Habitat Int. 43: 240–249. https://doi.org/10.1016/j.habitatint.2014.04.001.
Littau, P., N. J. Jujagiri, and G. Adlbrecht. 2010. “25 years of stakeholder theory in project management literature (1984-2009).” Project Manage. J. 41 (4): 17–29. https://doi.org/10.1002/pmj.20195.
Liu, G., K. Li, D. Zhao, and C. Mao. 2017. “Business model innovation and its drivers in the Chinese construction industry during the shift to modular prefabrication.” J. Manage. Eng. 33 (3): 04016051. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000501.
Liu, K., Y. Su, and S. Zhang. 2018. “Evaluating supplier management maturity in prefabricated construction project-survey analysis in China.” Sustainability 10 (9): 3046. https://doi.org/10.3390/su10093046.
London, K., and Z. Pablo. 2017. “An actor-network theory approach to developing an expanded conceptualization of collaboration in industrialized building housing construction.” Constr. Manage. Econ. 35 (8–9): 553–577. https://doi.org/10.1080/01446193.2017.1339361.
Low, S. P., and J. C. Choong. 2001a. “Just-in-time management of precast concrete components.” J. Constr. Eng. Manage. 127 (6): 494–501. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:6(494).
Low, S. P., and J. C. Choong. 2001b. “Just-in-time management in precast concrete construction: A survey of the readiness of main contractors in Singapore.” Integr. Manuf. Syst. 12 (6): 416–429. https://doi.org/10.1108/EUM0000000006107.
Lu, N., and R. W. Liska. 2008. “Designers’ and general contractors’ perceptions of offsite construction techniques in the United States construction industry.” Int. J. Constr. Educ. Res. 4 (3): 177–188. https://doi.org/10.1080/15578770802494565.
Luo, J., H. Zhang, and W. Sher. 2017. “Insights into architects’ future roles in off-site construction.” Constr. Econ. Build. 17 (1): 107–120. https://doi.org/10.5130/AJCEB.v17i1.5252.
Luo, L., C. Mao, L. Shen, and Z. Li. 2015. “Risk factors affecting practitioners’ attitudes toward the implementation of an industrialized building system.” Eng. Constr. Archit. Manage. 22 (6): 622–643. https://doi.org/10.1108/ECAM-04-2014-0048.
Mao, C., Q. Shen, W. Pan, and K. Ye. 2015. “Major barriers to off-site construction: The developer’s perspective in China.” J. Manage. Eng. 31 (3): 04014043. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000246.
McGrath, P. T., and M. Horton. 2011. “A post-occupancy evaluation (POE) study of student accommodation in an MMC/modular building.” Struct. Surv. 29 (3): 244–252. https://doi.org/10.1108/02630801111148211.
Meiling, J., F. Backlund, and H. Johnsson. 2012. “Managing for continuous improvement in off-site construction.” Eng. Constr. Archit. Manage. 19 (2): 141–158. https://doi.org/10.1108/09699981211206089.
Mitchell, R. K., D. J. Wood, and B. Agle. 1997. “Toward a theory of stakeholder identification and salience: Defining the principle of who and what really counts.” Acad. Manage. Rev. 22 (4): 853–886. https://doi.org/10.5465/amr.1997.9711022105.
Mohamad, M. I., M. A. Netooie, R. Taherkhani, A. L. Saleh, and S. A. Mansur. 2012. “Exploring the potential of using industrialized building system for floating urbanization by SWOT analysis.” J. Appl. Sci. 12 (5): 486–491. https://doi.org/10.3923/jas.2012.486.491.
Morgan, D. L. 1993. “Qualitative content analysis: A guide to paths not taken.” Qual. Health Res. 3 (1): 112–121. https://doi.org/10.1177/104973239300300107.
Mostafa, S., and N. Chileshe. 2018. “Application of discrete-event simulation to investigate effects of client order behaviour on off-site manufacturing performance in Australia.” Archit. Eng. Des. Manage. 14 (1–2): 139–157. https://doi.org/10.1080/17452007.2017.1301367.
Mostafa, S., K. P. Kim, V. W. Y. Tam, and P. Rahnamayiezekavat. 2018a. “Exploring the status, benefits, barriers and opportunities of using BIM for advancing prefabrication practice.” Int. J. Constr. Manage. 1–11. https://doi.org/10.1080/15623599.2018.1484555.
Mostafa, S., V. W. Tam, J. Dumrak, and S. Mohamed. 2018b. “Leagile strategies for optimizing the delivery of prefabricated house building projects.” Int. J. Constr. Manage. 1–15. https://doi.org/10.1080/15623599.2018.1494674.
Murtaza, M. B., D. J. Fisher, and M. J. Skibniewski. 1993. “Knowledge-based approach to modular construction decision support.” J. Constr. Eng. Manage. 119 (1): 115–130. https://doi.org/10.1061/(ASCE)0733-9364(1993)119:1(115).
Nadim, W., and J. S. Goulding. 2009. “Offsite production in the UK: The construction industry and academia.” Archit. Eng. Des. Manage. 5 (3): 136–152. https://doi.org/10.3763/aedm.2008.0094.
Nadim, W., and J. S. Goulding. 2011. “Offsite production: A model for building down barriers: A European construction industry perspective.” Eng. Constr. Archit. Manage. 18 (1): 82–101. https://doi.org/10.1108/09699981111098702.
Nahmens, I., and V. Bindroo. 2011. “Is customization fruitful in industrialized homebuilding industry?” J. Constr. Eng. Manage. 137 (12): 1027–1035. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000396.
Nahmens, I., and L. H. Ikuma. 2009. “An empirical examination of the relationship between lean construction and safety in the industrialized housing industry.” Lean Constr. J. 1–12.
Nahmens, I., L. H. Ikuma, and D. Khot. 2012. “Kaizen and job satisfaction—A case study in industrialized homebuilding.” Lean Constr. J. 91–104.
Nasrun, M., M. Nawi, U. Utara, F. Akmar, A. Nifa, U. Utara, M. Bin, and Y. Universiti. 2016. “A strategy towards team integration practice for improving the design and construction process in the Malaysian industrialized building projects.” Supplement, Int. Rev. Manage. Marketing 6 (S8): 226–229.
Nawi, M. N. M., M. N. A. Azman, N. Baluch, K. A. M. Kamar, and Z. A. Hamid. 2015. “Study on the use of industrialised building system in Malaysian private construction projects.” J. Archit. Eng. 10 (7): 7368–7374.
Nawi, M. N. M., A. Lee, K. A. M. Kahar, and Z. A. Hamid. 2011. “A critical literature review on the concept of team integration in industrialised building system (IBS) project.” Malaysian Constr. Res. J. 9 (2): 1–18.
Noorzai, E., A. Hosseini, K. Gharouni Jafari, and M. Aghaeipoor. 2017. “Providing a model to select an optimum multifamily housing method in Iran.” J. Archit. Eng. 23 (2): 04016019. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000236.
O’Connor, J. T., W. J. O’Brien, and J. O. Choi. 2014. “Critical success factors and enablers for optimum and maximum industrial modularization.” J. Constr. Eng. Manage. 140 (6): 04014012. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000842.
O’Connor, J. T., W. J. O’Brien, and J. O. Choi. 2015. “Standardization strategy for modular industrial plants.” J. Constr. Eng. Manage. 141 (9): 04015026. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001001.
O’Connor, J. T., W. J. O’Brien, and J. O. Choi. 2016. “Industrial project execution planning: Modularization versus stick-built.” Pract. Period. Struct. Des. Constr. 21 (1): 04015014. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000270.
Ojoko, E. O., M. H. Osman, A. B. A. Rahman, N. Bakhary, and W. A. Bolaji. 2018. “Evaluating the critical success factors of industrialised building system implementation in Nigeria: The stakeholders’ perception.” Int. J. Built Environ. Sustainability 5 (2): 127–133.
Olander, S., and A. Landin. 2005. “Evaluation of stakeholder influence in the implementation of construction projects.” Int. J. Project Manage. 23 (4): 321–328. https://doi.org/10.1016/j.ijproman.2005.02.002.
Onyeizu, E. N., and A. H. A. Bakar. 2011. “The utilisation of industrialised building system in design innovation in construction industry.” World Appl. Sci. J. 15 (2): 205–213.
Oral, E. L., G. Mistikoglu, and E. Erdis. 2003. “JIT in developing countries—a case study of the Turkish prefabrication sector.” Build. Environ. 38 (6): 853–860. https://doi.org/10.1016/S0360-1323(03)00021-0.
Pan, W., A. F. Gibb, and A. R. J. Dainty. 2007. “Perspective of UK housebuilders on the use of offsite modern methods of construction.” Constr. Manage. Econ. 25 (2): 183–194. https://doi.org/10.1080/01446190600827058.
Pan, W., A. G. F. Gibb, and A. R. J. Dainty. 2008. “Leading UK housebuilders’ utilization of offsite construction methods.” Build. Res. Inf. 36 (1): 56–67. https://doi.org/10.1080/09613210701204013.
Pan, W., A. G. F. Gibb, and A. R. J. Dainty. 2012. “Strategies for integrating the use of off-site production technologies in house building.” J. Constr. Eng. Manage. 138 (11): 1331–1340. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000544.
Park, M., Y. Ingawale-Verma, W. Kim, and Y. Ham. 2011. “Construction policymaking: With an example of Singaporean government’s policy to diffuse prefabrication to private sector.” KSCE J. Civ. Eng. 15 (5): 771–779. https://doi.org/10.1007/s12205-011-1243-4.
Phillips, D., M. Guaralda, and S. Sawang. 2016. “Innovative housing adoption: Modular housing for the Australian growing family.” J. Green Build. 11 (2): 147–170. https://doi.org/10.3992/jgb.11.2.147.1.
Project Management Institute. 2013. A guide to the project management body of knowledge. Newtown Square, PA: Project Management Institute.
Rahman, M. 2014. “Barriers of implementing modern methods of construction.” J. Manage. Eng. 30 (1): 69–77. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000173.
Rosner, B., and D. Grove. 1999. “Use of the Mann-Whitney U-test for clustered data.” Stat. Med. 18 (11): 1387–1400. https://doi.org/10.1002/(SICI)1097-0258(19990615)18:11%3C1387::AID-SIM126%3E3.0.CO;2-V.
Rowley, T. J. 1997. “Moving beyond dyadic ties: A network theory of stakeholder influences.” Acad. Manage. Rev. 22 (4): 887–910. https://doi.org/10.5465/amr.1997.9711022107.
Sadafi, N., M. F. Zain, and M. Jamil. 2011. “Adaptable industrial building system: Construction industry perspective.” J. Archit. Eng. 18 (2): 140–147. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000075.
Said, H. 2015. “Prefabrication best practices and improvement opportunities for electrical construction.” J. Constr. Eng. Manage. 141 (12): 04015045. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001018.
Said, H. 2016. “Modeling and likelihood prediction of prefabrication feasibility for electrical construction firms.” J. Constr. Eng. Manage. 142 (2): 04015071. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001051.
Savage, G. T., M. D. Bunn, B. Gray, Q. Xiao, S. Wang, E. J. Wilson, and E. S. Williams. 2010. “Stakeholder collaboration: Implications for stakeholder theory and practice.” Supplement, J. Bus. Ethics 96 (S1): 21–26. https://doi.org/10.1007/s10551-011-0939-1.
Senaratne, S., and S. Ekanayake. 2012. “Evaluation of application of lean principles to precast concrete bridge beam production process.” J. Archit. Eng. 18 (2): 94–106. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000063.
Seuring, S., and M. Müller. 2008. “From a literature review to a conceptual framework for sustainable supply chain management.” J. Cleaner Prod. 16 (15): 1699–1710. https://doi.org/10.1016/j.jclepro.2008.04.020.
Shaari, A. A., M. F. M. Zaki, W. Z. A. W. Muhamad, and A. Ayob. 2016. “Safety of precast concrete installation for industrialised building system construction.” Int. J. Appl. Eng. Res. 11 (13): 7929–7932.
Shamsuddin, S. M., R. Zakaria, S. F. Mohamed, A. L. Saleh, C. Utomo, M. Z. A. Majid, and K. Yahya. 2015. “Developing methodology for cradle to grave cost planning for industrialised building system (IBS) in Malaysia.” J. Teknologi 77 (16): 37–42.
Sharafi, P., M. Rashidi, B. Samali, H. Ronagh, and M. Mortazavi. 2018. “Identification of factors and decision analysis of the level of modularization in building construction.” J. Archit. Eng. 24 (2): 04018010. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000313.
Sing, C., P. E. D. Love, and C. Tam. 2014. “Forecasting the demand and supply of technicians in the construction industry.” J. Manage. Eng. 30 (3): 04014006. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000227.
Song, J., W. R. Fagerlund, C. T. Haas, C. B. Tatum, and J. A. Vanegas. 2005. “Considering prework on industrial projects.” J. Constr. Eng. Manage. 131 (6): 723–733. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:6(723).
Steinhardt, D. A., and K. Manley. 2016. “Exploring the beliefs of Australian prefabricated house builders.” Constr. Econ. Build. 16 (2): 27–41. https://doi.org/10.5130/AJCEB.v16i2.4741.
Švajlenka, J., and M. Kozlovská. 2018a. “Perception of user criteria in the context of sustainability of modern methods of construction based on wood.” Sustainability 10 (2): 116.
Švajlenka, J., and M. Kozlovská. 2018b. “Quality parameters perception of modern methods of construction based on wood in the context of sustainability.” Periodica Polytech. Civ. Eng. 62 (3): 636–642.
Tam, V. W. Y., I. W. H. Fung, M. C. P. Sing, and S. O. Ogunlana. 2015. “Best practice of prefabrication implementation in the Hong Kong public and private sectors.” J. Cleaner Prod. 109: 216–231. https://doi.org/10.1016/j.jclepro.2014.09.045.
Tamrin, N., M. N. M. Nawi, and F. A. A. Nifa. 2016. “Readiness in knowledge and ability for implementation of industrialised building system (IBS) in Malaysian construction industry.” Revista Tecnica de la Facultad de Ingenieria Universidad del Zulia 39 (9): 47–53.
Tatum, C. B., J. A. Vanegas, and J. M. Williams. 1987. Constructability improvement using prefabrication, preassembly, and modularization. Austin, TX: Construction Industry Institute, Univ. of Texas at Austin.
Taylor, M. D. 2010. “A definition and valuation of the UK offsite construction sector.” Constr. Manage. Econ. 28 (8): 885–896. https://doi.org/10.1080/01446193.2010.480976.
Teng, Y., C. Mao, G. Liu, and X. Wang. 2017. “Analysis of stakeholder relationships in the industry chain of industrialized building in China.” J. Cleaner Prod. 152: 387–398. https://doi.org/10.1016/j.jclepro.2017.03.094.
United Nations. 2017. World economic situation and prospects 2017. New York: United Nations.
Viking, A., and S. Lidelöw. 2015. “Exploring industrialized housebuilders’ interpretations of local requirements using institutional logics.” Constr. Manage. Econ. 33 (5–6): 484–494. https://doi.org/10.1080/01446193.2015.1050966.
Vlachos, D., P. Georgiadis, and E. Iakovou. 2007. “A system dynamics model for dynamic capacity planning of remanufacturing in closed-loop supply chains.” Comput. Oper. Res. 34 (2): 367–394. https://doi.org/10.1016/j.cor.2005.03.005.
Wikberg, F., T. Olofsson, and A. Ekholm. 2014. “Design configuration with architectural objects: Linking customer requirements with system capabilities in industrialized house-building platforms.” Constr. Manage. Econ. 32 (1–2): 196–207. https://doi.org/10.1080/01446193.2013.864780.
Wing, C. K. 1997. “The ranking of construction management journals.” Constr. Manage. Econ. 15 (4): 387–398. https://doi.org/10.1080/014461997372953.
Wong, P. S. P., C. Zwar, and E. Gharaie. 2017. “Examining the drivers and states of organizational change for greater use of prefabrication in construction projects.” J. Constr. Eng. Manage. 143 (7): 04017020. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001309.
Wu, P., and Y. Feng. 2014. “Identification of non-value adding activities in precast concrete production to achieve low-carbon production.” Archit. Sci. Rev. 57 (2): 105–113. https://doi.org/10.1080/00038628.2013.829023.
Wu, P., and S. P. Low. 2014. “Barriers to achieving green precast concrete stock management—A survey of current stock management practices in Singapore.” Int. J. Constr. Manage. 14 (2): 78–89. https://doi.org/10.1080/15623599.2014.899126.
Xue, H., S. Zhang, Y. Su, and Z. Wu. 2017. “Factors affecting the capital cost of prefabrication—A case study of China.” Sustainability 9 (9): 1512. https://doi.org/10.3390/su9091512.
Xue, H., S. Zhang, Y. Su, and Z. Wu. 2018a. “Capital cost optimization for prefabrication: A factor analysis evaluation model.” Sustainability 10 (2): 159. https://doi.org/10.3390/su10010159.
Xue, H., S. Zhang, Y. Su, Z. Wu, and R. J. Yang. 2018b. “Effect of stakeholder collaborative management on off-site construction cost performance.” J. Cleaner Prod. 184: 490–502. https://doi.org/10.1016/j.jclepro.2018.02.258.
Yang, J., Q. Shen, and M. Ho. 2009. “An overview of previous studies in stakeholder management and its implications for the construction industry.” J. Facil. Manage. 7 (2): 159–175. https://doi.org/10.1108/14725960910952532.
Yunus, R., and J. Yang. 2014. “Improving ecological performance of industrialized building systems in Malaysia.” Constr. Manage. Econ. 32 (1–2): 183–195. https://doi.org/10.1080/01446193.2013.825373.
Zakaria, S., T. Gajendran, M. Skitmore, and G. Brewer. 2018. “Key factors influencing the decision to adopt industrialised building systems technology in the Malaysian construction industry: An inter-project perspective.” Archit. Eng. Des. Manage. 14 (1-2): 27–45. https://doi.org/10.1080/17452007.2017.1298512.
Zhai, X., R. Reed, and A. Mills. 2014. “Addressing sustainable challenges in China.” Smart Sustainable Built Environ. 3 (3): 261–274. https://doi.org/10.1108/SASBE-02-2014-0008.
Zhai, Y., R. Y. Zhong, Z. Li, and G. Huang. 2017. “Production lead-time hedging and coordination in prefabricated construction supply chain management.” Int. J. Prod. Res. 55 (14): 3984–4002. https://doi.org/10.1080/00207543.2016.1231432.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 145Issue 8August 2019

History

Published online: May 30, 2019
Published in print: Aug 1, 2019
Discussion open until: Oct 30, 2019

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Research Fellow, Australasian Joint Research Centre for Building Information Modelling, Curtin Univ., Perth 6845, Australia. Email: [email protected]
Senior Lecturer, School of Design and the Built Environment, Curtin Univ., Perth 6845, Australia (corresponding author). ORCID: https://orcid.org/0000-0002-6080-7530. Email: [email protected]
Xiangyu Wang [email protected]
Professor, Australasian Joint Research Centre for Building Information Modelling, Curtin Univ., Perth 6845, Australia; Professor, School of Civil Engineering, Tongji Univ., Shanghai 200333, China. Email: [email protected]
Kerry London [email protected]
Professor, School of Computing, Engineering and Mathematics, Western Sydney Univ., Sydney 2150, Australia. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share