Performance Measurement of Building Sheet-Metal Ductwork Prefabrication under Batch Production Settings

Publication: Journal of Construction Engineering and Management
Volume 144, Issue 2

Abstract

Mechanical contractors have been among the very early pioneers of construction prefabrication by moving a significant amount of work to sheet metal fabrication shops off-site to produce common fittings of mechanical building systems and architectural metal finishes. These sheet metal fabrication shops usually follow standard families of fittings and batch-based production process, in which different customized fittings are fabricated together following a single instruction sheet, called a cut sheet. Aggregate and manual tracking systems are used to record the total fabrication labor hours for every cut sheet, which does not provide a direct means to measure the performance of fabrication of the whole batch and individual fittings. As such, the goal of this paper is to assess the feasibility of developing performance measurement models for HVAC sheet metal fabrication operations that are based on batch production with limited tracking data. Six different fabrication time estimation models with different tracking scopes and detail levels were formulated and implemented using multilinear regression and artificial neural networks. The models were trained, validated, and tested using a large sample of sheet metal fabrication data. The contributions of this study include (1) analyzing the trade-off between the formulation complexity and the reliability of their implementations, (2) implementing these formulations using two common machine learning tools (artificial neural networks and multiple linear regression) and comparing between their fit quality and prediction accuracy, and (3) examining the feasibility of reliable performance measurement models of batch production operations with only a single dependent variable (total fabrication time) and an abundance of fabrication and design variables.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Data generated or analyzed during the study are available from the corresponding author by request. Information about the Journal’s data sharing policy can be found here: http://ascelibrary.org/doi/10.1061/%28ASCE%29CO.1943-7862.0001263.

Acknowledgments

The authors would like to acknowledge the help of the fabrication shop manager in making himself available for interviews and sharing the shop data. Also, the authors are grateful to the reviewers for their constructive feedback and critical suggestions that improved the quality of this research.

References

Abudayyeh, O., Federicks, T., Palmquist, M., and Torres, H. N. (2003). “Analysis of occupational injuries and fatalities in electrical contracting industry.” J. Constr. Eng. Manage., 152–158.
Alex, D. P., Al Hussein, M., Bouferfuene, A., and Fernando, S. (2010). “Artificial neural network model for cost estimation: City of Edmonton’s water and sewer installation services.” J. Constr. Eng. Manage., 745–756.
Anvari, B, Angeloudis, P., and Ochieng, W. Y. (2016). “A multi-objective GA-based optimisation for holistic manufacturing, transportation and assembly of precast construction.” Autom. Constr., 71(2), 226–241.
Attalah, M., and Hegazy, T. (2003). “Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression.” J. Constr. Eng. Manage., 405–411.
Barnett, V., and Lewis, T. (1994). Outliers in statistical data, Wiley, New York.
Bayram, S., and Al-Jibouri, S. (2016). “Efficacy of estimation methods in forecasting building projects’ costs.” J. Constr. Eng. Manage., 05016012.
Benavides, P. T., Salazar, J., and Diwekar, U. (2013). “Economic comparison of continuous and batch production of biodiesel using soybean oil.” Environ. Prog. Sustainable Energy, 32(1), 11–24.
Blismas, N., Pasquire, C., and Gibb, A. (2006). “Benefit evaluation for off-site production in construction.” Constr. Manage. Econ., 24(2), 121–130.
Bogus, S., Jones, C. B., and Rounds, J. (2009). “Best practices: Prefabrication for electrical contractors.”, ELECTRI International—The Foundation for Electrical Construction, Inc., Bethesda, MD.
Chan, W., and Hu, H. (2002). “Constraint programming approach to precast production scheduling.” J. Constr. Eng. Manage., 513–521.
da Rocha, C., and Kemmer, S. (2013). “Method to implement delayed product differentiation in construction of high-rise apartment building projects.” J. Constr. Eng. Manage., 05013001.
Denisa, F. (2012). “Bottleneck management in discrete batch production.” J. Competitiveness, 4(2), 161–171.
Gardner, B. J., Gransberg, D. D., and Jeong, H. D. (2016). “Reducing data-collection efforts for conceptual cost estimating at a highway agency.” J. Constr. Eng. Manage., 04016057.
Girmscheid, G. (2005). “Industrialization in building construction—Production technology or management concept?” Understanding the construction business and companies in the new millennium, Technical Research Centre of Finland (VTT) and Association of Finnish Civil Engineers (RIL), Espoo and Helsinki, Finland, 427–441.
Glorot, X., Bordes, A., and Bengio, Y. (2011). “Deep sparse rectifier neural networks.” Proc., 14th Int. Conf. on Artificial Intelligence and Statistics (AISTATS) 2011, Fort Lauderdale, FL.
Gunduz, M., Ugur, L. O., and Ozturk, E. (2011). “Parametric cost estimation system for light rail transit and metro trackworks.” Expert Syst. Appl., 38(3), 2873–2877.
Hanna, A., Boodai, F., and El Asmar, M. (2013). “State of practice of building information modeling in mechanical and electrical construction industries.” J. Constr. Eng. Manage., 04013009.
Hanna, A. S., Camlic, R., Peterson, P. A., and Lee, M. (2004). “Cumulative effect of project changes for electrical and mechanical construction.” J. Constr. Eng. Manage., 762–771.
Hanna, A. S., Menches, C. L., Sullivan, K. T., and Sargent, J. R. (2005). “Factors affecting absenteeism in electrical construction.” J. Constr. Eng. Manage., 1212–1218.
Hanna, A. S., Peterson, P., and Lee, M. (2002). “Benchmarking productivity indicators for electrical/mechanical projects.” J. Constr. Eng. Manage., 331–337.
Hanna, A. S., Russell, J. S., Nordheim, E. V., and Bruggink, M. J. (1999). “Impact of change orders on labor efficiency for electrical construction.” J. Constr. Eng. Manage., 224–232.
Hoopes, B. J., and Triantis, K. P. (2001). “Efficiency performance, control charts and process improvement: Complementary measurement and evaluation.” IEEE Trans. Eng. Manage., 48(2), 239–253.
Horman, M. J., Orosz, M. P., and Riley, D. R. (2006). “Sequence planning for electrical construction.” J. Constr. Eng. Manage., 363–372.
Jaillon, L., and Poon, C. S. (2014). “Life cycle design and prefabrication in buildings: A review and case studies in Hong Kong.” Autom. Constr., 39, 195–202.
Jansson, G., Lundkvist, R., and Olofsson, T. (2015). “The role of experience feedback channels in the continuous development of house-building platforms.” Constr. Innov., 15(2), 236–255.
Karmarkar, U. S., Lederer, P. J., and Zimmerman, J. L. (1990). “Choosing manufacturing production control and cost accounting systems.” Chapter 12, Measures for manufacturing excellence, R. Kaplan, ed., Harvard Business School Press, Boston, 353–396.
Khanzode, A, Fischer, M, and Reed, D (2008). “Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project.” J. Inf. Technol. Constr., 13(22), 324–342.
Kock, N., and Lynn, G. S. (2012). “Lateral collinearity and misleading results in variance-based SEM: An illustration and recommendations.” J. Assoc. Inf. Syst., 13(7), 546–580.
Korman, T. M., and Tatum, C. B. (2006). “Prototype tool for mechanical, electrical, and plumbing coordination.” J. Comput. Civ. Eng., 38–48.
Kwieciński, K, and Slyk, J. (2014). “System for customer participation in the design process of mass-customized houses.” Proc., 31st Int. Conf. on Education and Research in Computer Aided Architectural Design in Europe, E. M. Thompson, ed., Vol. 1, Northumbria Univ., Newcastle upon Tyne, U.K.
Li, Z., Shen, G. Q., and Xue, X. (2014). “Critical review of the research on the management of prefabricated construction.” Habitat Int., 43, 240–249.
Love, P., Edwards, D. J., Watson, H., and Davis, P. (2010). “Rework in civil infrastructure projects: Determination of cost predictors.” J. Constr. Eng. Manage., 275–282.
Lowe, D, Emsley, M. W., and Harding, A. (2006). “Predicting construction cost using multiple regression techniques.” J. Constr. Eng. Manage., 750–758.
Lucko, G., and Rojas, E. M. (2010). “Research validation: Challenges and opportunities in the construction domain.” J. Constr. Eng. Manage., 127–135.
Menches, C. L., and Hanna, A. S. (2006). “Conceptual planning process for electrical construction.” J. Constr. Eng. Manage., 1306–1313.
MHC (McGraw Hill Construction). (2011). Prefabrication and modularization: Increasing productivity in the construction industry, Washington, DC.
Mierswa, I., Wurst, M., Klinkenberg, R., Scholz, M., and Euler, T. (2006). “YALE: Rapid prototyping for complex data mining tasks.” Proc., 12th ACM SIGKDD Int. Conf. on Knowledge Discovery and Data Mining, Association for Computing Machinery, New York, 935–940.
Mills, G. E., and Gay, L. R. (2015). Educational research: Competencies for analysis and applications, 11th Ed., Pearson Education, Upper Saddle River, NJ.
Mullens, M., and Arif, M. (2006). “Structural insulated panels: Impact on the residential construction process.” J. Constr. Eng. Manage., 786–794.
Nadim, W., and Goulding, J. S. (2010). “Offsite production in the UK: The way forward? A UK construction industry perspective.” Constr. Innov., 10(2), 181–202.
Nahmens, I., and Mullens, M. (2009). “The impact of product choice on lean homebuilding.” Constr. Innov., 9(1), 84–100.
Noyce, D. A., and Hanna, A. S. (1997). “Planned schedule compression concept file for electrical contractors.” J. Constr. Eng. Manage., 189–197.
Pan, W., Gibb, A. G. F., and Dainty, A. R. J. (2007). “Perspectives of UK housebuilders on the use of offsite modern methods of construction.” Constr. Manage. Econ., 25(2), 183–194.
Persson, S., Malmgren, L., and Johnsson, L. (2009). “Information management in industrial housing design and manufacture.” J. Inf. Technol.Constr., 14, 110–122.
Polat, G. (2008). “Factors affecting the use of precast concrete systems in the United States.” J. Constr. Eng. Manage., 169–178.
Pons, O., and Aguado, A. (2012). “Integrated value model for sustainable assessment applied to technologies used to build schools in Catalonia, Spain.” Build. Environ., 53, 49–58.
Prokhorov, A. V. (2001). “Kendall coefficient of rank correlation.” Encyclopedia of mathematics, M. Hazewinkel, ed., Springer, New York.
RapidMiner [Computer software]. RapidMinder, Boston.
Riley, D. R., Varadan, P., James, J. S., and Thomas, H. R. (2005). “Benefit-cost metrics for design coordination of mechanical, electrical, and plumbing systems in multistory buildings.” J. Constr. Eng. Manage., 877–889.
Rojas, E. (2013). “Identifying, recruiting, and retaining quality field supervisors and project managers in the electrical construction industry.” J. Manage. Eng., 424–434.
Rowings, J. E., Federle, M. O., and Rusk, J. (2000). “Design/build methods for electrical contracting industry.” J. Constr. Eng. Manage., 15–21.
Said, H. (2015a). “Modeling and likelihood prediction of prefabrication feasibility for electrical construction firms.” J. Constr. Eng. Manage., 04015071.
Said, H. (2015b). “Prefabrication best practices and improvement opportunities for electrical construction.” J. Constr. Eng. Manage., 04015045.
Said, H., Chalasani, T., and Logan, S. (2016). “Exterior prefabricated panelized walls platform optimization.” Autom. Constr., 76(Apr), 1–13.
Serban, F. (2010). “Auto-experimentation of KDD workflows based on ontological planning.” 9th Int. Semantic Web Conf. (ISWC) 2010, Vol. 6497, Springer, Berlin.
Shewchuk, J., and Guo, C. (2012). “Panel stacking, panel sequencing, and stack locating in residential construction: Lean approach.” J. Constr. Eng. Manage., 1006–1016.
SMACNA (Sheet Metal and Air Conditioning Contractors Association). (2006). “HVAC systems duct design.” ⟨https://isgweb.smacna.org/ISGweb/Purchase/ProductDetail.aspx?Product_code=1958⟩ (Sep. 20, 2017).
Suresh, P., and Wassick, J. M. (2011). “Real time performance measurement for batch chemical plants.” Proc., 2011 Winter Simulation Conf., INFORMS, Phoenix.
Theodoridis, S. (2015). Machine learning, Elsevier, San Diego.
Turton, R., Bailie, R. C., Whiting, W. B., and Shaeiwitz, J. A. (2009). Analysis, synthesis, and design of chemical processes, 3rd Ed., Prentice Hall, Upper Saddle River, NJ.
Wikberg, F., Olofsson, T., and Ekholm, A. (2014). “Design configuration with architectural objects: Linking customer requirements with system capabilities in industrialized house-building platforms.” Constr. Manage. Econ., 32(1–2), 196–207.
Yang, Z., Ma, Z., and Wu, S. (2016). “Optimized flowshop scheduling of multiple production lines for precast production.” Autom. Constr., 72(Part 3), 321–329.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 144Issue 2February 2018

History

Received: Feb 16, 2017
Accepted: Jul 27, 2017
Published online: Nov 28, 2017
Published in print: Feb 1, 2018
Discussion open until: Apr 28, 2018

Permissions

Request permissions for this article.

Authors

Affiliations

Assistant Professor, Dept. of Civil Engineering, Santa Clara Univ., 500 El Camino Real, Santa Clara, CA 95053; Adjunct Lecturer, Dept. of Structural Engineering, Cairo Univ., Giza 12613, Egypt (corresponding author). ORCID: https://orcid.org/0000-0002-6601-9498. E-mail: [email protected]
Prathyaj Kandimalla [email protected]
Graduate Research Assistant, Dept. of Civil Engineering, Santa Clara Univ., 500 El Camino Real, Santa Clara, CA 95053. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share