Technical Papers
Feb 26, 2016

Quantifying Hazard Exposure Using Real-Time Location Data of Construction Workforce and Equipment

Publication: Journal of Construction Engineering and Management
Volume 142, Issue 8

Abstract

Traditional risk-assessment methods typically evaluate accident probability, exposure frequency or duration, and consequence severity, respectively, and finally determine a quantitative risk score or a qualitative risk level. The assessment process is prospective and subjective. Changing and complex construction situations impede their practical and efficient application. To assess safety risk with regard to changing site conditions in an objective and efficient way, this study proposes a quantitative model for hazard exposure assessment based on real-time location data of construction workforce and equipment, collected by a location-based proximity warning system. In contrast with traditional risk-assessment methods, the model proposed in this study combines accident probability and hazard exposure duration into a single quantitative concept—hazard exposure amount. This concept takes into account the space factor as well as the time factor of construction activities. For ease of understanding, a hazard is analogized as a radiation source and the hazard exposure is then referred to as the radiation quantity received. The longer duration and closer proximity in which a person is exposed to a radiation (hazard), the more radiation the person receives (the higher risk to which the person is exposed). A trial study is described in which a proximity warning system was developed and used to demonstrate and test the model’s capability of hazard exposure assessment. This shows that the system can provide safety officers with an ongoing and immediate means of comparing safety risk trends from worker, hazard, and project perspectives.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

Many thanks go to Bo Ye, Wei Lu, and Xintao Yang for their indispensable efforts in the system development and trial studies. The work was supported by the Innovation and Technology Commission of Hong Kong, under the public sector trial scheme of a project “Location-Based Technologies for Asset Tracking and Risk Management” (ITT/004/15LP), and the Research Grants Council of Hong Kong with the grant titled “Proactively Monitoring Construction Progress by Integrating 3D Laser-Scanning and BIM” (PolyU 152093/14E).

References

Abderrahim, M., Garcia, E., Diez, R., and Balaguer, C. (2005). “A mechatronics security system for the construction site.” Autom. Constr., 14(4), 460–466.
Baradan, S., and Usmen, M. A. (2006). “Comparative injury and fatality risk analysis of building trades.” J. Constr. Eng. Manage., 533–539.
Behzadan, A. H., Aziz, Z., Anumba, C. J., and Kamat, V. R. (2008). “Ubiquitous location tracking for context-specific information delivery on construction sites.” Autom. Constr., 17(6), 737–748.
Carbonari, A., Giretti, A., and Naticchia, B. (2011). “A proactive system for real-time safety management in construction sites.” Autom. Constr., 20(6), 686–698.
Choset, H., et al. (2005). Principles of robot motion: Theory, algorithms, and implementations (intelligent robotics and autonomous agents series), MIT Press, Cambridge, MA.
Cvach, M. (2012). “Monitor alarm fatigue: An integrative review.” Biomed. Instrum. Technol., 46(4), 268–277.
Department of Motor Vehicles. (2011). “Defensive driving.” Chapter 8, NYS DMV—Driver’s manual, New York.
Ding, L. Y., et al. (2013). “Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the internet of things.” Autom. Constr., 36, 25–37.
Fung, I. W. H., Tam, V. W. Y., Lo, T. Y., and Lu, L. L. H. (2010). “Developing a risk assessment model for construction safety.” Int. J. Project Manage., 28(6), 593–600.
Hallowell, M., and Gambatese, J. (2009). “Activity-based safety risk quantification for concrete formwork construction.” J. Constr. Eng. Manage., 990–998.
Hinze, J., Pedersen, C., and Fredley, J. (1998). “Identifying root causes of construction injuries.” J. Constr. Eng. Manage., 67–71.
Holt, S. J. A. (2001). “Principles of construction safety.” Construction safety, Blackwell Science, Oxford, U.K.
Hwang, S. (2012). “Ultra-wide band technology experiments for real-time prevention of tower crane collisions.” Autom. Constr., 22, 545–553.
Jannadi, O. A., and Almishari, S. (2003). “Risk assessment in construction.” J. Constr. Eng., 492–500.
Lee, K.-P., Lee, H.-S., Park, M., Kim, H., and Han, S. (2014). “A real-time location-based construction labor safety management system.” J. Civ. Eng. Manage., 20(5), 724–736.
Lee, U.-K., Kim, J.-H., Cho, H., and Kang, K.-I. (2009). “Development of a mobile safety monitoring system for construction sites.” Autom. Constr., 18(3), 258–264.
Li, H., et al. (2015a). “Chirp-spread-spectrum-based real time location system for construction safety management: A case study.” Autom. Constr., 55, 58–65.
Li, H., Lu, M., Hsu, S.-C., Gray, M., and Huang, T. (2015b). “Proactive behavior-based safety management for construction safety improvement.” Safety Sci., 75, 107–117.
Manuele, F. A. (2005). “Risk assessment and hierarchies of control.” Prof. Safety, 50(5), 33–39.
Marks, E., and Teizer, J. (2012). “Proximity sensing and warning technology for heavy construction equipment operation.” Construction Research Congress 2012, ASCE, Reston, VA, 981–990.
Marks, E. D., and Teizer, J. (2013). “Method for testing proximity detection and alert technology for safe construction equipment operation.” Constr. Manage. Econ., 31(6), 636–646.
Mitropoulos, P., and Namboodiri, M. (2010). “New method for measuring the safety risk of construction activities: Task demand assessment.” J. Constr. Eng. Manage., 30–38.
Occupational Safety and Health Branch. (2014). Occupational safety and health statistics 2013, Labour Dept., HKSAR, Hong Kong.
OSHA Directorate of Training and Education. (2011a). “Construction focus four: Caught-in or -between hazards.” Occupational Safety and Health Administration (OSHA) Training Institute, Washington, DC.
OSHA Directorate of Training and Education. (2011b). “Construction focus four: Electrocution hazards.” Occupational Safety and Health Administration (OSHA) Training Institute, Washington, DC.
OSHA Directorate of Training and Education. (2011c). “Construction focus four: Fall hazards.” Occupational Safety and Health Administration (OSHA) Training Institute, Washington, DC.
OSHA Directorate of Training and Education. (2011d). “Construction focus four: Struck-by hazards.” Occupational Safety and Health Administration (OSHA) Training Institute, Washington, DC.
Razavi, S. N., and Moselhi, O. (2012). “GPS-less indoor construction location sensing.” Autom. Constr., 28, 128–136.
Road Safety Authority. (2014). “The two-second rule.” 〈http://www.rotr.ie/rules-for-driving/speed-limits/speed-limits_2-second-rule.html〉 (Jul. 27, 2015).
Rozenfeld, O., Sacks, R., and Rosenfeld, Y. (2009). “‘CHASTE’: Construction hazard assessment with spatial and temporal exposure.” Constr. Manage. Econ., 27(7), 625–638.
Ruff, T. (2006). “Evaluation of a radar-based proximity warning system for off-highway dump trucks.” Accid. Anal. Preven., 38(1), 92–98.
Ruff, T. M., and Holden, T. P. (2003). “Preventing collisions involving surface mining equipment: A GPS-based approach.” J. Safety Res., 34(2), 175–181.
Sammarco, J., Gallagher, S., Mayton, A., and Srednicki, J. (2012). “A visual warning system to reduce struck-by or pinning accidents involving mobile mining equipment.” Appl. Ergon., 43(6), 1058–1065.
Schiffbauer, W. H. (2002). “Active proximity warning system for surface and underground mining applications.” Min. Eng., 54(12), 40–48.
Schiffbauer, W. H., and Mowrey, G. L. (2001). “An environmentally robust proximity warning system for hazardous areas.” Proc., ISA Emerging Technologies Conf., International Society of Automation, Research Triangle Park, NC, 1–10.
Sousa, V., Almeida, N. M., and Dias, L. A. (2015). “Risk-based management of occupational safety and health in the construction industry—Part 2: Quantitative model.” Safety Sci., 74, 184–194.
Sun, Y., Fang, D., Wang, S., Dai, M., and Lv, X. (2008). “Safety risk identification and assessment for Beijing Olympic venues construction.” J. Manage. Eng., 40–47.
Teizer, J., Allread, B. S., Fullerton, C. E., and Hinze, J. (2010). “Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system.” Autom. Constr., 19(5), 630–640.
Teizer, J., Mantripragada, U., Venugopal, M., and Walia, A. (2008). “Analyzing the travel patterns of construction workers.” Proc., 25th Int. Symp. on Automation and Robotics in Construction, Institute of Internet and Intelligence Technologies, Vilnius Gediminas Technical Univ., Vilnius, Lithuania, 26–29.
Vega, A. N. (2001). “Development of a real-time proximity warning and 3D mapping system based on wireless networks, virtual reality graphics, and GPS to improve safety in open-pit mines.” Ph.D. dissertation, Colorado School of Mines, Golden, CO.
Wang, J., and Razavi, S. (2015). “Low false alarm rate model for unsafe-proximity detection in construction.” J. Comput. Civ. Eng., 04015005.
Wang, W.-C., Liu, J.-J., and Chou, S.-C. (2006). “Simulation-based safety evaluation model integrated with network schedule.” Autom. Constr., 15(3), 341–354.
Wu, H., et al. (2013). “A location based service approach for collision warning systems in concrete dam construction.” Safety Sci., 51(1), 338–346.
Yi, K., and Langford, D. (2006). “Scheduling-based risk estimation and safety planning for construction projects.” J. Constr. Eng. Manage., 626–635.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 142Issue 8August 2016

History

Received: May 12, 2015
Accepted: Dec 8, 2015
Published online: Feb 26, 2016
Discussion open until: Jul 26, 2016
Published in print: Aug 1, 2016

Permissions

Request permissions for this article.

Authors

Affiliations

Senior Research Fellow, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Hung Hom, Kowloon 999077, Hong Kong (corresponding author). E-mail: [email protected]
Professor, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Hung Hom, Kowloon 999077, Hong Kong. E-mail: [email protected]
Senior Research Fellow, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Hung Hom, Kowloon 999077, Hong Kong. E-mail: [email protected]
M. Skitmore [email protected]
Professor, School of Civil Engineering and the Built Environment, Queensland Univ. of Technology (QUT), Brisbane, QLD 4027, Australia. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share