Formalized Approach to Discretize a Continuous Plant in Construction Simulations
Publication: Journal of Construction Engineering and Management
Volume 140, Issue 8
Abstract
The lack of the expertise and resources, the unavailability of sufficient and complete operations data, and the absence of relevant site information present obstacles to applying combined simulation modeling in practice. Construction modelers are required to make critical decisions in a short turnaround time for planning operations and improving productivity. Thus, a more convenient discrete event simulation-based approach in simulating the production capacity of the continuous plant given limited data availability is desirable and formalized, which essentially discretizes the modeling of continuous elements in a predominantly discrete system without loss of significance or accuracy. As such, a direct application of a discrete simulation method intended for construction applications will offer a straightforward, sufficient solution to model the whole system. A concrete pumping case is used to illustrate the proposed approach. The effectiveness of the proposed approach is further demonstrated to tackle a real-world challenge: modeling iron ore mining operations to achieve efficiency and enhance productivity. Especially, the formula proposed is applied to simplify the modeling of the iron ore processing plant with magnetic separation drums, which constitutes the major plant used for extracting iron sand from the slurry of iron ore. A discrete event simulation model was rapidly developed for the complex mining system and the insight derived from simulation experiments assisted a mining company in (1) configuring the processes of raw sand excavation, iron sand magnetic separation and iron sand shipment at a seaport, (2) optimizing resource allocation and utilization. In conclusion, the proposed approach adds to the usefulness and flexibility of a discrete simulation methodology in modeling complicated construction systems.
Get full access to this article
View all available purchase options and get full access to this article.
References
AbouRizk, S., and Hajjar, D. (1998). “A framework for applying simulation in construction.” Can. J. Civ. Eng., 25(3), 604–617.
AbouRizk, S., and Wales, R. (1997). “Combined discrete-event/continuous simulation for project planning.” J. Constr. Eng. Manage., 11–20.
Anson, M., Tang, S. L., and Ying, K. C. (2002). “Measurement of the performance of ready mixed concreting resources as data for system simulation.” Constr. Manage. Econ., 20(3), 237–250.
Anson, M., and Wang, S. Q. (1994). “Hong Kong performance yardsticks for concrete placing during building construction.” HKIE Trans., 1(1), 1–18.
Anson, M., and Wang, S. Q. (1998). “Performance of concrete placing in Hong Kong buildings.” J. Constr. Eng. Manage., 116–124.
Chan, D. W. M., and Kumaraswamy, M. M. (1995). “A study of the factors affecting construction durations in Hong Kong.” Constr. Manage. Econ., 13(4), 319–333.
Hajjar, D., and AbouRizk, S. (2000). “Application framework for development of simulation tools.” J. Comput. Civ. Eng., 160–167.
Hajjar, D., AbouRizk, S., and Xu, J. (1998). “Construction site dewatering analysis using a special purpose simulation-based framework.” Can. J. Civ. Eng., 25(5), 819–828.
Halpin, D. W. (1977). “CYCLONE—Method for modeling job site processes.” J. Constr. Div., 103(3), 489–499.
Kannan, G., and Vorster, M. (2000). “Development of an experience database for truck loading operations.” J. Constr. Eng. Manage., 201–209.
Law, A. M., and Kelton, W. D. (2000). Simulation modeling and analysis, 3rd Ed., McGraw-Hill, New York.
Lee, Y. H., Cho, M. K., and Kim, Y. B. (2002). “Supply chain simulation with discrete—Continuous combined modeling.” Comput. Ind. Eng., 43(1–2), 375–392.
Lu, M. (2003). “Simplified discrete-event simulation approach for construction simulation.” J. Constr. Eng. Manage., 537–546.
Lu, M., and Anson, M. (2004). “Establish concrete placing rates using quality control records from Hong Kong building construction projects.” J. Constr. Eng. Manage., 216–224.
Lu, M., Anson, M., Tang, S. L., and Ying, Y. C. (2003). “HKCONSIM: A practical simulation solution to planning concrete plant operations in Hong Kong.” J. Constr. Eng. Manage., 547–554.
Lu, M., Lau, S. C., and Chan, E. K. Y. (2007). “Combined simulation modeling using simplified discrete event simulation approach—A mining case study.” Proc., 2007 Summer Computer Simulation Conf., Society for Computer Simulation, San Diego, CA, 421–428.
Lu, M., and Wong, L. C. (2007). “Comparison of two simulation methodologies in modeling construction systems: Manufacturing-oriented PROMODEL versus construction-oriented SDESA.” Autom. Constr., 16(1), 86–95.
Martinez, J. C. (1996). “STROBOSCOPE state and resource based simulation of construction processes.” Ph.D. dissertation, Civil and Environmental Engineering, Univ. of Michigan, Ann Arbor, MI.
Mohamed, Y., and AbouRizk, S. (2005). “Framework for building intelligent simulation models of construction operations.” J. Comput. Civ. Eng., 277–291.
Mohamed, Y., and AbouRizk, S. (2006). “A hybrid approach for developing special purpose simulation tools.” Can. J. Civ. Eng., 33(12), 1505–1515.
Oloufa, A. A., Ikeda, M., and Nguyen, T. H. (1998). “Resource-based simulation libraries for construction.” Autom. Constr., 7(4), 315–326.
Pritsker, A. A. B., and O’Reilly, J. J. (1999). Simulation with visual SLAM and AweSim, 2nd Ed., Systems Publishing Corp., West Lafayette, IN.
Shi, J. (1999). “Activity-based construction (ABC) modeling and simulation method.” J. Constr. Eng. Manage., 354–360.
Shi, J., and AbouRizk, S. (1997). “Resource-based modeling for construction simulation.” J. Constr. Eng. Manage., 26–33.
Shi, J., and AbouRizk, S. (1998). “Continuous and combined event-process models for simulating pipeline construction.” Constr. Manage. Econ., 16(4), 489–498.
Smith, S. D. (1998). “Concrete placing analysis using discrete-event simulation.” Proc., Inst. Civ. Eng., Struct. Build., 128(4), 351–358.
Song, L., and AbouRizk, S. M. (2006). “Virtual shop model for experimental planning of steel fabrication projects.” J. Comput. Civ. Eng., 308–316.
Zayed, T. M., and Halpin, D. W. (2000). “Construction engineering I: Simulation as a tool for resource management.” Proceedings of the 32nd Conf. on Winter Simulation, Society for Computer Simulation International, 1897–1906.
Information & Authors
Information
Published In
Copyright
© 2014 American Society of Civil Engineers.
History
Received: Sep 13, 2013
Accepted: Mar 18, 2014
Published online: May 9, 2014
Published in print: Aug 1, 2014
Discussion open until: Oct 9, 2014
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.