Technical Papers
May 4, 2013

Where to Focus for Successful Adoption of Building Information Modeling within Organization

Publication: Journal of Construction Engineering and Management
Volume 139, Issue 11

Abstract

Suggestions abound for successful adoption of building information modeling (BIM); however, a company with limited resources cannot adopt them all. The factors that have top management priority for successful accomplishment of a task are termed critical success factors (CSFs). This paper aims to derive the CSFs for four questions commonly asked by companies in the first wave of BIM adoption: (1) What are the CSFs for adopting BIM in a company? (2) What are the CSFs for selecting projects to deploy BIM? (3) What are the CSFs for selecting BIM services? (4) What are the CSFs for selecting company-appropriate BIM software applications? A list of consideration factors was collected for each question, based on a literature review, and then refined through face-to-face interviews based on experiences of BIM experts. An international survey was conducted with leading BIM experts. From the 206 distributed surveys, 52 responses from four continents were collected. This study used quantitative data analysis to derive a manageable number (4–10) of CSFs for each category from dozens of anecdotal consideration factors. The derived CSFs are expected to be used as efficient metrics for evaluating and managing the level of BIM adoption and as a basis for developing BIM evaluation models in the future.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

This research is supported by the Technology Innovation Program (World Best Software Project, 10040794) funded by the Ministry of Trade, Industry and Energy (MOTIE, Korea).

References

Allen, R. K., Becerik, B., Pollalis, S. N., and Schwegler, B. R. (2005). “Promise and barriers to technology enabled and open project team collaboration.” J. Prof. Issues Eng. Educ. Pract., 131(4), 301–311.
American Institute of Architects - Committee on Integrated Practice. (2006). Report on integrated practice, American Institute of Architects, Washington, DC.
American Institute of Architects (AIA), AIA Minnesota, and School of Architecture University of Minnesota. (2012). IPD case studies, AIA, Washington, DC.
Anumba, C., et al. (2010). The BIM project execution planning guide and templates—version 2.0, CIC Research Group, Dept. of Architectural Engineering, Pennsylvania State Univ., University Park, PA.
Autodesk. (2003). Building information modeling, Autodesk, San Rafael, CA.
Bentley, K., and Workman, B. (2003). Does the building industry really need to start over? A response from Bentley to Autodesk’s BIM/Revit proposal for the future, Bentley Systems, Exton, PA.
Bernstein, H. M., et al. (2010). The business value of BIM in Europe, McGraw-Hill Construction, Bedford, MA.
Bernstein, H. M., Jones, S. A., and Russo, M. A. (2012). The business value of BIM in North America: Multi-year trend analysis and user rating (2007–2012), McGraw-Hill Construction, Bedford, MA.
Construction Users Roundtable (CURT). (2005). Optimizing the construction process: An implementation strategy, CURT, Cincinnati, OH.
Cuff, D. (1991). Architecture: The story of practice, MIT Press, Cambridge, MA.
Cyon Research Corporation. (2003). The building information model: A look at Graphisoft’s Virtual Building concept, White paper, Bethesda, MD.
D’Agostino, B., Mikulis, M., and Bridgers, M. (2007). FMI/CMAA Eighth Annual Survey of Owners: The perfect storm—construction style, FMI Corp./Construction Management Association of America, Raleigh, NC.
Dossick, C. S., and Neff, G. (2010). “Organizational divisions in BIM-enabled commercial construction.” J. Constr. Eng. Manage., 136(4), 459–467.
Eastman, C., Teicholz, P., Sacks, R., and Liston, K. (2008). BIM handbook—A guide to building information modeling for owners, managers, designers, engineers, and contractors, Wiley, Hoboken, NJ.
Eastman, C. M. (1976). “General purpose building description systems.” Comput. Aided Des., 8(1), 17–26.
Eastman, C. M., Fisher, D., Lafue, G., Lividini, J., Stoker, D., and Yessios, C. (1974). An outline of the Building Description System, Institute of Physical Planning, Carnegie Mellon Univ., Pittsburgh.
Egan, J. (1998). Rethinking construction, Dept. of Trade and Industry, London.
Gilligan, B., and Kunz, J. (2007). “VDC use in 2007: Significant value, dramatic growth, and apparent business opportunity.” Construction Users Roundtable (CURT) National Meeting, Center for Integrated Facility Engineering (CIFE), Stanford Univ., Stanford, CA.
Gu, N., and London, K. (2010). “Understanding and facilitating BIM adoption in the AEC industry.” Autom. Constr., 19(8), 988–999.
Hartmann, T. (2008). “A grassroots model of decision support system implications by construction project teams.” Ph.D. dissertation, Stanford Univ., Palo Alto, CA.
Jung, Y., and Joo, M. (2011). “Building information modelling (BIM) framework for practical implementation.” Autom. Constr., 20(2), 126–133.
Khanzode, A., Fischer, M., and Reed, D. (2008). “Benefits and lessons learned of implementing buliding virtual design and construction (VDC) technologies for coordination of mechanical, electrial, and plumbing (MEP) systems on a large healthcare project.” ITcon, 13, 324–342.
Khemlani, L. (2006). “2006 2nd annual BIM awards, part 1.” AECBytes, 〈http://www.aecbytes.com/buildingthefuture/2006/BIM_Awards.html〉 (Aug. 1, 2012).
Khemlani, L. (2007a). “2007 3rd annual BIM awards.” AECBytes, 〈http://www.aecbytes.com/buildingthefuture/2007/BIM_Awards_Part1.html〉 (Aug. 1, 2012).
Khemlani, L. (2007b). Top criteria for BIM solutions: AECbytes survey results, AECbytes Special Report, 〈http://www.aecbytes.com/feature/2007/BIMSurveyReport.html〉 (Aug. 1, 2012).
Kim, I.-h. (1995). “A study on the decision methodology for the introduction of new technology in buliding areas.” J. Archit. Inst. Korea, 11(3), 91–102.
Kreider, R., Messner, J., and Dubler, C. (2010). “Determining the frequency and impact of applying BIM for different purposes on building projects.” Proc., 6th Int. Conf. on Innovation in Architecture, Engineering and Construction (AEC), Pennsylvania State Univ., University Park, PA, USA.
Kulatunga, U., Amaratunga, D., and Haigh, R. (2009). “Critical success factors of construction research and development.” Constr. Manage. Econ., 27(9), 891–900.
Kuprenas, J. A., and Mock, C. S. (2009). “Collaborative BIM modeling case study—Process and results.” Computing in Civil Engineering, ASCE, Austin, TX.
Laiserin, J. (2003). “The BIM page: Building information modeling—the great debate.” Laiserin Lett., 〈http://www.laiserin.com/features/bim/index.php〉 (Oct. 29, 2003).
Lee, G. (2007). “BIM collaboration methods for improving the efficiency of BIM.” BIM Workshop, Construction Association of Korea, Seoul, Korea.
Lee, G., Lee, J., and Jones, S. A. (2012). The business value of BIM in South Korea, McGraw-Hill Construction, Bedford, MA.
Lee, C.-J., Lee, G., and Won, J.-S. (2009). “An analysis of the BIM software selection factors.” J. Archit. Inst. Korea, 25(7), 153–163.
Liberatore, M. J., and Pollack-Johnson, B. (2003). “Factors influencing the usage and selection of project management software.” IEEE Trans. Eng. Manage., 50(2), 164–174.
Magal, S. R., Carr, H. H., and Watson, H. J. (1988). “Critical success factos for information center managers.” MIS Q., 12(3), 413–425.
Manning, R., and Messner, J. I. (2008). “Case studies in BIM implementation for programming of healthcare facilities.” ITcon, 13, 446–457.
Nitithamyong, P., and Skibniewski, M. J. (2003). “Critical succss/failure factors in implementation of web-based construction project management systems.” Proc., Construction Research Congress, ASCE, Reston, VA, 1–8.
Nitithamyong, P., and Skibniewski, M. J. (2007). “Key success/failure factors and their impacts on system performance of web-based project management systems in construction.” ITcon, 12, 39–60.
O’Brien, W. J. (2000). “Implementation issues in project web sites: A practitioner’s viewpoint.” J. Manage. Eng., 16(3), 34–39.
Park, J.-D., and Kim, J.-W. (2009). “A study on the ontology representation of the IFC based building information model.” J. Archit. Inst. Korea, 25(5), 87–94.
Paulson, B. C., and Fondahl, J. W. (1980). Toward improved transportation construction through research, Construction Institute, Stanford Univ., Stanford, CA.
Riese, M., and Peake, D. (2007). “3D BIM—Virtual design and construction—Gehry Technologies experience.” Proc., SimTecT 2007 Simulation Conf. (SimTecT 2007), Lindfield, Queensland, Australia.
Rockart, J. F. (1979). “Chief executives define their own data needs.” Harv. Bus. Rev., 57(2), 81–93.
Shen, Q., and Liu, G. (2003). “Critical success factors for value management studies in construction.” J. Constr. Eng. Manage., 129(5), 485–491.
Steenbergen, M. R., and Marks, G. (2007). “Evaluating expert judgements.” Eur. J. Political Res., 46(3), 347–366.
Tatum, C. B. (1989). “Organizing to increase innovation in the construction firm.” J. Constr. Eng. Manage., 115(4), 602–617.
Taylor, J. E., and Levitt, R. (2007). “Innovation alignment and project network dynamics: An integrative model for change.” Project Manage. J., 38(3), 22–35.
Teicholz, P. (2004). “Labor productivity declines in the construction industry: Causes and remedies.” AECbytes, 〈http://www.aecbytes.com/viewpoint/2004/issue_4.html〉 (Aug. 1, 2012).
Teo, T. S. H., and Ang, J. S. K. (1999). “Critical success factors in the alignment of IS plans with business plans.” Int. J. Inf. Manage., 19(2), 173–185.
Van Nederveen, G. A., and Tolman, F. P. (1992). “Modelling multiple views on buildings.” Autom. Constr., 1(3), 215–224.
Won, J., Lee, J., and Lee, G. (2008). “A case study on BIM collaboration and information management method.” J. Arch. Inst. Korea, 24(8), 25–32.
Yan, H., and Damian, P. (2008). “Benefits and barriers of building information modelling.” Proc., 12th Int. Conf. on Computing in Civil and Building Engineering 2008, Tsinghua University, Beijing, China.
Young, N. W., Jr., Jones, S. A., and Bernstein, H. M. (2007). Interoperability in the construction industry, McGraw-Hill Construction, Bedford, MA.
Young, N. W., Jr., Jones, S. A., and Bernstein, H. M. (2008). Building information modeling (BIM)—Transforming design and construction to achieve greater industry productivity, McGraw-Hill Construction, Bedford, MA.
Young, N. W., Jr., Jones, S. A., Bernstein, H. M., and Gudgel, J. E. (2009). The business value of BIM, McGraw-Hill Construction, Bedford, MA.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 139Issue 11November 2013

History

Received: Dec 9, 2012
Accepted: May 2, 2013
Published online: May 4, 2013
Published in print: Nov 1, 2013
Discussion open until: Dec 29, 2013

Permissions

Request permissions for this article.

Authors

Affiliations

Jongsung Won
Ph.D. Candidate, Dept. of Architectural Engineering, Yonsei Univ., Seoul 120-749, Korea.
Ghang Lee, Ph.D. [email protected]
Associate Professor, Dept. of Architectural Engineering, Yonsei Univ., Seoul 120-749, Korea (corresponding author). E-mail: [email protected]
Carrie Dossick, Ph.D.
M.ASCE
Associate Professor, Dept. of Construction Management, Univ. of Washington, Seattle, WA 98195.
John Messner, Ph.D.
M.ASCE
Professor, Dept. of Architectural Engineering, Pennsylvania State Univ., University Park, PA 16802.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share