TECHNICAL PAPERS
Aug 12, 2010

Empirical Analysis of the Determinants of Organizational Flexibility in the Construction Business

Publication: Journal of Construction Engineering and Management
Volume 137, Issue 3

Abstract

Flexibility has been touted as an important requirement for firms to survive and prosper in turbulent and volatile economic environments. The aim of this research is to investigate the relevance of organizational flexibility management to construction firms, because firms that are more flexible are more likely to survive and prosper than less flexible firms. More specifically, the objectives are to define a model that will allow contractors to understand the complex factors that contribute to organizational flexibility; ascertain whether organizational flexibility should be treated as a uni- or multidimensional construct; and identify the key determinants that drive organizational flexibility. A two-pronged research method with exploratory interviews and an industrywide survey was adopted. Data were collected from face-to-face interviews with construction industry experts. The data collection instrument for the survey was a structured questionnaire specifically designed for this study. By using structural equation modeling, the study empirically investigated the key dimensions and determinants of organizational flexibility. The results showed that organizational flexibility should be treated as a multidimensional concept, comprising operational flexibility, tactical flexibility, and strategic flexibility. The key determinants—employees’ skills and behavior, supply chain capabilities, and business strategies—were found to have the highest positive impacts on operational flexibility, tactical flexibility, and strategic flexibility, respectively. The structural equation model developed from this research provides guidance to practitioners on the organizational attributes that they could improve to achieve organizational flexibility, which would help them to survive and grow.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The research Grant Nos. UNSPECIFIEDR-703-000-011-646 and UNSPECIFIEDR-703-000-011-720 provided by Berkeley–National University of Singapore (NUS) Risk Management Institute to conduct this research are acknowledged with grateful thanks.

References

Aaker, D. A., and Mascarenhas, B. (1984). “The need for strategic flexibility.” J. Bus. Strategy, 5(2), 74–82.
Anderson, J. C., and Gerbing, D. W. (1988). “Structural equation modeling in practice: A review and recommended two-step approach.” Psychol. Bull., 103(3), 411–423.
Browne, J., Dubois, D., Rathmill, K., Sethi, S. P., and Stecke, K. E. (1984). “Classification of flexible manufacturing systems.” Flexibility Manuf. Syst. Mag., 2(2), 114–117.
Buckley, A. (1997). “Valuing tactical and strategic flexibility.” J. Gen. Manage., 22(3), 74–91.
Carlsson, B. (1989). “Flexibility and the theory of the firm.” Int. J. Ind. Organ., 7(2), 179–203.
Cartlidge, D. (2004). Procurement of built assets, Butterworth Heinemann, Oxford, UK.
Child, J. (1972). “Organizational structure, environment and performance: The role of strategic choice.” Sociology, 6(1), 1–22.
Chin, W. W. (1998). “The partial least squares approach to structural equation modeling.” Modern methods for business research, G. A. Marcoulides, ed., Lawrence Erlbaum Associates, Mahwah, NJ, 295–335.
Comrey, A. L. (1973). A first course in factor analysis, Academic Press, New York.
Correa, H. L. (1994). “The flexibility of technological and human resources in automotive manufacturing.” Integr. Manuf. Syst., 5(1), 33–40.
Cox, A., and Thompson, I. (1997). “‘Fit for purpose’ contractual relations: Determining a theoretical framework for construction projects.” Eur. J. Purch. Supply Manage., 3(3), 127–135.
Cyert, R. M., and March, J. G. (1963). A behavioural theory of firm, Prentice Hall, Upper Saddle River, NJ.
Dijkstra, T. (1983). “Some comments on maximum likelihood and partial least squares methods.” J. Econometrics, 22(1-2), 67–90.
Dikmen, I., Birgonul, M. T., and Kiziltas, S. (2005). “Prediction of organizational effectiveness in construction companies.” J. Constr. Eng. Manage., 131(2), 252–261.
Drucker, P. F. (1980). Managing in turbulent times, Harper and Row, New York.
Efron, B. (1987). “Better bootstrap confidence intervals.” J. Am. Stat. Assoc., 82(397), 171–185.
Evans, J. S. (1991). “Strategic flexibility for high technology manoeuvres: A conceptual framework.” J. Manage. Stud., 28(1), 69–89.
Falk, R. F., and Miller, N. B. (1992). A primer for soft modeling, Univ. of Akron, Akron, OH.
Fornell, C., and Bookstein, F. L. (1982). “Two structural equation models: LISREL and PLS applied to consumer exit-voice theory.” J. Mark. Res., 19(4), 440–452.
Fornell, C., and Larcker, D. F. (1981). “Evaluating structural equation models with unobserved variables and measurement error.” J. Mark. Res., 18(1), 39–50.
Fredericks, E. (2005). “Infusing flexibility into business-to-business firms: A contingency theory and resource-based view perspective and practical implications.” Ind. Mark. Manage., 34(6), 555–565.
Genus, A. (1995). Flexible strategic management, Chapman and Hall, London.
Gerwin, D. (1993). “Manufacturing flexibility: A strategic perspective.” Manage. Sci., 39(4), 395–410.
Gil, N., Tommelein, I. D., Stout, A., and Garrett, T. (2005). “Embodying product and process flexibility to cope with challenging project deliveries.” J. Constr. Eng. Manage., 131(4), 439–448.
Gruneberg, S. L. (2009). “Construction markets in a changing world economy.” Economics for the modern built environment, L. Ruddock, ed., Taylor and Francis, New York, 153–167.
Hair, J. F., Anderson, R. E., Tatham, R. L., and Black, W. C. (1998). Multivariate data analysis with readings, Prentice Hall, Upper Saddle River, NJ.
Handa, V., and Adas, A. (1996). “Predicting the level of organizational effectiveness: A methodology for the construction firm.” Constr. Manage. Econ., 14(4), 341–352.
Harman, H. H. (1967). Modern factor analysis, Univ. of Chicago, Chicago.
Hillebrandt, P. M., and Cannon, J. (1990). The modern construction firm, Macmillan, London.
Hillebrandt, P. M., Cannon, J., and Lansley, P. (1995). The construction company in and out recession, Macmillan, London.
Ho, S. P., and Liu, L. Y. (2003). “How to evaluate and invest in emerging A/E/C technologies under uncertainty.” J. Constr. Eng. Manage., 129(1), 16–24.
Hulland, J. (1999). “Use of partial least squares (PLS) in strategic management research: A review of four recent studies.” Strategic Manage. J., 20(2), 195–204.
Joreskog, K. G., and Wold, H. (1982). “The ML and PLS technique for modeling with latent variables: Historical and comparative aspects.” System under indirect observation: Causality, structure, prediction—Part 1, K. G. Joreskog and H. Wold, eds., North Holland, Amsterdam, The Netherlands, 263–270.
Kale, S., and Arditi, D. (1998). “Business failure: Liabilities of newness, adolescence, and smallness.” J. Constr. Eng. Manage., 124(6), 458–464.
Kale, S., and Arditi, D. (2001). “General contractors’ relationships with subcontractors: A strategic asset.” Constr. Manage. Econ., 19(5), 541–549.
Koste, L. L., and Malhotra, M. K. (1999). “A theoretical framework for analyzing the dimension of manufacturing flexibility.” J. Oper. Manage., 18(1), 75–93.
Koste, L. L., and Malhotra, M. K. (2000). “Trade-offs among the elements of flexibility: A comparison from the automotive industry.” Omega, 28(6), 693–710.
Laborde, M., and Sanvido, V. (1994). “Introducing new process technologies into construction companies.” J. Constr. Eng. Manage., 120(3), 488–508.
Langford, D. A., and Male, S. P. (2001). Strategic management in construction, 2nd Ed., Blackwell Science, London.
Lansley, P. R. (1983). “A practical approach to auditing organizational flexibility.” Constr. Manage. Econ., 1(2), 145–156.
Lansley, P. R. (1987). “Corporate strategy and survival in the UK construction industry.” Constr. Manage. Econ., 5(2), 141–155.
Lansley, P., Quince, T., and Lea, E. (1979). “Flexibility and efficiency in construction management.” The Final Rep. on a Research Project with Financial Support of the Dept. of the Environment, Building Industry Group, Ashridge Management Research Unit, Hertfordshire, UK.
Lim, B. T. H., and Oo, B. L. (2007). “Flexibility: A uni- or multi-dimensional concept for construction business?” Proc., Management in Construction and Researchers Association (MICRA) Meetings and Conf., Faculty of Architecture, Planning and Surveying (FSPU), Univ. Teknologi MARA, Shah Alam, Selangor, Malaysia.
Lim, B. T. H., Ling, F. Y. Y., and Ofori, G. (2007). “Flexibility management in the changing competitive environment.” Proc., CME 25th Anniversary Int. Conf., Univ. of Reading, Reading, UK.
Llorens, F. J., Molina, L. M., and Verdu, A. J. (2005). “Flexibility of manufacturing systems, strategic change and performance.” Int. J. Prod. Econ., 98(3), 273–289.
Miles, R. E., and Snow, C. C. (1978). Organizational strategy, structure and process, McGraw-Hill, New York.
Mitropoulos, P., and Tatum, C. B. (2000). “Forces driving adoption of new information technologies.” J. Constr. Eng. Manage., 126(5), 340–348.
Nunnally, J. C. (1978). Psychometric theory, 2nd Ed., McGraw-Hill, New York.
Ofori, G., and Debrah, Y. A. (1998). “Flexible management of workers: Review of employment practices in the construction industry in Singapore.” Constr. Manage. Econ., 16(4), 397–408.
Oke, A. (2005). “A framework for analyzing manufacturing flexibility.” Int. J. Oper. Prod. Manage., 25(10), 973–996.
Penrose, E. T. (1995). The theory of the growth of the firm, 3rd Ed., Oxford Univ., Oxford, UK.
Prigogine, I., and Stengers, I. (1984). Order out of chaos, Heinemann, London.
Sanchez, R. (1995). “Strategic flexibility in product competition.” Strategic Manage. J., 16(summer—special issue), 135–159.
Sethi, A. K., and Sethi, P. S. (1990). “Flexibility in manufacturing: A survey.” Int. J. Flexible Manuf. Syst., 2(4), 289–328.
Sinkula, J. M., Baker, W. E., and Noordewier, T. (1997). “A framework for market-based organizational learning: Linking values, knowledge, and behaviour.” J. Acad. Mark. Sci., 25(4), 305–318.
Slack, N. (2005). “The changing nature of operations flexibility—Update.” Int. J. Oper. Prod. Manage., 25(12), 1201–1210.
SmartPLS 2.0 M3 [Computer software]. Hamburg Univ. of Technology, Institute for Human Resource Management Organizations, Hamburg, Germany.
Suarez, F. F., Cusumano, M. A., and Fine, C. H. (1995). “An empirical study of flexibility in manufacturing.” Sloan Manage. Rev. Bank Mark., 37(1), 25–32.
Sull, D. N. (1999). “Why good companies go bad.” Harvard Bus. Rev., 77(4), 42–50.
Swafford, P. M., Ghosh, S., and Murthy, N. (2006). “The antecedents of supply chain agility of a firm: Scale development and model testing.” J. Oper. Manage., 24(2), 170–188.
Verona, G. A. (1999). “A resource-based view of product development.” Acad. Manage. Rev., 24(1), 132–142.
Winch, G. M. (2000). “Institutional reform in British construction: Partnering and private finance.” Build. Res. Inf., 28(2), 141–155.
Yadav, R. N., Narain, R., Sarkis, J., and Cordeiro, J. J. (2000). “The strategic implications of flexibility in manufacturing systems.” Int. J. Agile Manage. Syst., 2(3), 202–213.
Zhang, Q. Y., Vonderembse, M. A., and Lim, J. S. (2003). “Manufacturing flexibility: Defining and analyzing relationships among competence, capability and customer satisfaction.” J. Oper. Manage., 21(2), 173–191.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 137Issue 3March 2011
Pages: 225 - 237

History

Received: Nov 22, 2009
Accepted: Aug 11, 2010
Published online: Aug 12, 2010
Published in print: Mar 1, 2011

Permissions

Request permissions for this article.

Authors

Affiliations

Benson T. H. Lim [email protected]
Research Assistant, Dept. of Building, National Univ. of Singapore, 4 Architecture Dr., Singapore 117566. E-mail: [email protected]
Florence Y. Y. Ling [email protected]
Associate Professor, Dept. of Building, National Univ. of Singapore, 4 Architecture Dr., Singapore 117566 (corresponding author). E-mail: [email protected]
C. William Ibbs, M.ASCE [email protected]
Professor, Dept. of Civil and Environmental Engineering, Univ. of California, 213 McLaughlin Hall, Berkeley, CA 94720. E-mail: [email protected]
Benny Raphael [email protected]
Assistant Professor, Dept. of Building, National Univ. of Singapore, 4 Architecture Dr., Singapore 117566. E-mail: [email protected]
George Ofori [email protected]
Professor, Dept. of Building, National Univ. of Singapore, 4 Architecture Dr., Singapore 117566. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share