TECHNICAL PAPERS
Jun 10, 2009

Performance Consequences of Psychological Empowerment

Publication: Journal of Construction Engineering and Management
Volume 135, Issue 12

Abstract

The relationship between psychological empowerment and job performance, and whether three intermediate performance determinants; motivation, ability, and opportunity to perform hold the key to unlocking the empowerment-performance relationship dilemma are addressed. Using hierarchical linear modeling to analyze responses from 380 project management-level staff, the results show that psychological empowerment not only has direct and positive performance consequences, but also indirect effects, mediated by intrinsic motivation, opportunity to perform and ability to perform. The findings provide preliminary evidence in support of a comprehensive model of work performance that takes into consideration not only motivation and ability but opportunity to perform. Indeed, opportunity to perform actually emerged as a stronger mediator in the psychological empowerment-contextual performance behaviors relationship than ability to perform. The findings of both direct and indirect relationships however demonstrate that the relationship between empowerment and performance is more complex than previously thought. Yet, by demonstrating that empowered employees exhibit positive performance behaviors, psychological empowerment clearly emerges as a valuable path for organizations to pursue in their search for performance improvement in project settings.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The support of Grant No. UNSPECIFIED712204E (The Impact of Culture on Project Performance) from the Hong Kong Research Grants Council in providing funding for part of this study is gratefully acknowledged.UNSPECIFIED

References

Ahadzie, D. K., Proverbs, D. G., and Olomolaiye, P. (2008). “Towards developing competency-based measures for construction project managers: Should contextual behaviors be distinguished from task behaviors?” Int. J. Proj. Manag., 26(6), 631–645.
Anvuur, A. M. (2008). “Cooperation in construction projects: Concept, antecedents, and strategies.” Ph.D. thesis, Dept. of Civil Engineering, The Univ. of Hong Kong, Hong Kong.
Armstrong, J. S., and Overton, T. S. (1977). “Estimating non-response bias in mail surveys.” J. Mark. Res., 14(3), 396–402.
Aryee, S., and Chen, Z. X. (2006). “Leader-member exchange in a Chinese context: Antecedents, the mediating role of psychological empowerment and outcomes.” J. Bus. Res., 59(7), 793–801.
Bakalis, S., Joiner, T. A., and Zie, Z. (2007). “Decision-making delegation: Implications for Chinese managers’ performance and satisfaction.” Int. J. Hum. Resour. Dev. Manage., 7(3/4), 286–299.
Bandura, A. (1977). Social learning theory, Prentice-Hall, Englewood Cliffs, N.J.
Bandura, A. (1986). Social foundations of thought and action: A social cognitive theory, Prentice-Hall, Englewood Cliffs, N.J.
Barcikowski, R. S. (1981). “Statistical power with group mean as the unit of analysis.” J. Educ. Stat., 6, 267–285.
Baron, R. M., and Kenny, D. A. (1986). “The moderator-mediator variable distinction in social psychological research: Conceptual, strategic, and statistical considerations.” J. Pers. Soc. Psychol., 51(6), 1173–1182.
Bickel, R. (2007). Multilevel analysis for applied research: It’s just regression!, Guilford, New York.
Bliese, P. D. (2000). “Within-group agreement, non-independence, and reliability: Implications for data aggregation and analyses.” Multilevel theory, research, and methods in organizations: Foundations, extensions, and new directions, K. J. Klein and S. W. J. Kozlowski, eds., Jossey-Bass, San Francisco, 349–381.
Bliese, P. D., and Hanges, P. J. (2004). “Being both too liberal and too conservative: The perils of treating grouped data as though they were independent.” Organ. Res. Methods, 7(4), 400–417.
Blumberg, M., and Pringle, C. D. (1982). “The missing opportunity in organizational research: Some implications for a theory of work performance.” Acad. Manage. Rev., 7(4), 560–569.
Borman, W. C., and Motowidlo, S. J. (1993). “Expanding the criterion domain to include elements of contextual performance.” Personnel selection in organizations, N. Schmitt et al., eds., Jossey-Bass, San Francisco, 71–98.
Breaugh, J. A. (2008). “Important considerations in using statistical procedures to control for nuisance variables in non-experimental studies.” Hum. Resour. Manage. Rev., 18(4), 282–293.
Brief, A. P., and Aldag, R. J. (1977). “The intrinsic-extrinsic dichotomy: Toward conceptual clarity.” Acad. Manage. Rev., 2(3), 496–500.
Campbell, J. P., McCloy, R. A., Oppler, S. H., and Sager, C. E. (1993). “A theory of performance.” Personnel selection in organizations, N. Schmitt, et al., eds., Jossey-Bass, San Francisco, 35–70.
Chen, G., Kirkman, B. L., Kanfer, R., Allen, D., and Rosen, B. (2007). “A multilevel study of leadership, empowerment and performance in teams.” J. Appl. Psychol., 92(2), 331–346.
Cheng, E. W. L., Li, H., and Fox, P. (2007). “Job performance dimensions for improving final project outcomes.” J. Constr. Eng. Manage., 133(8), 592–599.
Cohen, J., and Cohen, P. (1983). Applied multiple regression/correlation analysis for the behavioral sciences, Lawrence Erlbaum Associates, Hillsdale, N.J.
Conger, J. A., and Kanungo, R. N. (1988). “The empowerment process: Integrating theory and practice.” Acad. Manage. Rev., 13(3), 471–482.
Cooke, W. N. (1994). “Employee participation programs, group-based incentives, and company performance: A union-nonunion comparison.” Ind. Labor Relat. Rev., 47(4), 594–609.
Courtney, R., and Winch, G. (2003). “Re-engineering construction: The role of research and implementation.” Build. Res. Inf., 31(2), 172–178.
Courville, T., and Thompson, B. (2001). “Use of structure coefficients in published multiple regression articles: β is not enough.” Educ. Psychol. Meas., 61(2), 229–248.
Cramer, D. (2003). “A cautionary tale of two statistics: Partial correlation and standardized partial regression.” J. Psychol., 137(5), 507–511.
Crowne, D. P., and Marlowe, D. (1960). “A new scale of social desirability independent of psychopathology.” J. Consult. Psychol., 24(4), 349–354.
Dainty, A. R. J., Bryman, A., and Price, A. D. F. (2002). “Empowerment within the U.K. construction sector.” Leadership Organiz. Devel. J., 23(5/6), 333–342.
Dainty, A. R. J., Bryman, A., Price, A. D. F., Greasley, K., Soetanto, R., and King, N. (2005). “Project affinity: The role of emotional attachment in construction projects.” Constr. Manage. Econom., 23(3), 241–244.
Dainty, A. R. J., Cheng, M. -I., and Moore, D. R. (2003). “Redefining performance measures for construction project managers: An empirical evaluation.” Constr. Manage. Econom., 21(2), 209–218.
Deci, E. L., and Ryan, R. M. (1985). Intrinsic motivation and self-determination in human behavior, Plenum, New York.
Dewettinck, K., Singh, J., and Buyens, D. (2003). “Psychological empowerment in the workplace: Reviewing the empowerment effects on critical work outcomes.” Vlerick Leuven Gent working paper series no. 2003.29, Ghent University, 2–26.
Dimitriades, Z., and Kufidu, S. (2004). “Individual, job, organizational, and contextual correlates of employment empowerment: Some Greek evidence.” Electron. J. Bus. Ethics Organ. Stud., 9(2), 36–43.
Eylon, D., and Au, K. Y. (1999). “Exploring empowerment cross-cultural differences along the power distance dimension.” International Journal of Intercultural Relations, 23(3), 373–385.
Field, A. P. (2005). Discovering statistics using SPSS: (and sex, drugs, and rock’n’roll), 2nd Ed., SAGE, London.
Ford, J. K., Quinones, M. A., Sego, D. J., and Sorra, J. S. (1992). “Factors affecting the opportunity to perform trained tasks on the job.” Pers. Psychol., 45(3), 511–527.
Gist, M. E., and Mitchell, T. R. (1992). “Self-efficacy: A theoretical analysis of its determinants and malleability.” Acad. Manage. Rev., 17(2), 183–211.
Hackman, J. R., and Oldham, G. R. (1976). “Motivation through the design of work: Test of a theory.” Organ Behav. Hum. Perform., 16(2), 250–279.
Hair, J. F., Anderson, R. E., Tatham, R. L., and Black, W. C. (1998). Multivariate data analysis, 4th Ed., Prentice-Hall, Upper Saddle River, N.J.
Hofmann, D. A. (1997). “An overview of the logic and rationale of hierarchical linear models.” J. Manage., 23(6), 723–744.
Hui, M. K., Au, K., and Fock, H. (2004). “Empowerment effects across cultures.” J. Int. Business Stud., 35(1), 46–60.
Humborstad, S. I. W., Humborstad, B., Whitfield, R., and Perry, C. (2008). “Implementation of empowerment in Chinese high power-distance organizations.” Int. J. Human Resour. Manage, 19(7), 1349–1364.
Kanter, R. M. (1977). Men and women of the corporation, 1st Ed., Basic Books, New York.
Kanter, R. M. (1993). Men and women of the corporation, 2nd Ed., Basic Books, New York.
Kenny, D. A., and Judd, C. M. (1986). “Consequences of violating the independence assumption in analysis of variance.” Psychol. Bull., 99(3), 422–431.
Kenny, D. A., and Judd, C. M. (1996). “A general procedure for the estimation of interdependence.” Psychol. Bull., 119(1), 138–148.
Liden, R. C., Wayne, S. J., and Sparrowe, R. T. (2000). “An examination of the mediating role of psychological empowerment on the relations between the job, interpersonal relationships, and work outcomes.” J. Appl. Psychol., 85(3), 407–416.
Liu, A. M. M., Chiu, W. M., and Fellows, R. (2007). “Enhancing commitment through work empowerment.” Eng., Constr., Archit. Manage., 14(6), 568–580.
Liu, A. M. M., and Fang, Z. (2006). “A power-based leadership approach to project management.” Constr. Manage. Econom., 24(5), 497–507.
Loosemore, M. (1999). “Responsibility, power, and construction conflict.” Constr. Manage. Econom., 17(6), 699–709.
Luke, D. A. (2004). Multilevel modeling, Sage, Thousand Oaks, Calif.
Maassen, G. H., and Bakker, A. B. (2001). “Suppressor variables in path models: Definitions and interpretations.” Sociolog. Methods Res., 30(2), 241–270.
MacKinnon, D. P., Lockwood, C. M., Hoffman, J. M., West, S. G., and Sheets, V. (2002). “A comparison of methods to test mediation and other intervening variable effects.” Psychol. Methods, 7(1), 83–104.
Mitchell, M., and Jolley, J. (2001). Research design explained, 4th Ed., Harcourt College Publishers, Fort Worth, Tex.
Motowidlo, S. J. (2003). “Job performance.” Handbook of psychology: Industrial and organizational psychology, W. C. Borman, D. R. Ilgen, and R. J. Klimoski, eds., Wiley, New York, 39–53.
Ng, S. T., Rose, T. M., Mak, M., and Chen, S. E. (2002). “Problematic issues associated with project partnering-the contractor perspective.” Int. J. Proj. Manag., 20(6), 437–449.
Parker, S. K., and Turner, N. (2002). “Work design and individual work performance: Research findings and an agenda for future inquiry.” Psychological management of individual performance, S. Sonnentag, ed., Wiley, New York, 69–93.
Peters, L. H., and O’Connor, E. J. (1980). “Situational constraints and work outcomes: The influences of a frequently overlooked construct.” Acad. Manage. Rev., 5(3), 391–397.
Podsakoff, P. M., Niehoff, B. P., MacKenzie, S. B., and Williams, M. L. (1993). “Do substitutes for leadership really substitute leadership? An empirical examination of Kerr and Jermier's situational leadership model.” Org. Behav. Hum. Decis. Process, 54, 1–44.
Preacher, K. J., and Leonardelli, G. J. (2001). “An interactive calculation tool for mediation tests.” ⟨http://www.people.ku.edu/~preacher/sobel/sobel.htm⟩ (July 15, 2008).
Raudenbush, S. W., and Bryk, A. S. (2002). Hierarchical linear models: Applications and data analysis methods, 2nd Ed., Sage, Thousand Oaks, Calif.
Robinson, J. P., Shaver, P. R., and Wrightsman, L. S., eds. (1991). Measures of personality and social psychological attitudes, Academic, San Diego.
Rothbaum, F., Weisz, J. R., and Snyder, S. S. (1982). “Changing the world and changing the self: a two-process model of perceived control.” J. Pers. Soc. Psychol., 42(1), 5–37.
Scott, D., Bishop, J., and Chen, X. (2003). “An examination of the relationship of employee involvement with job satisfaction, employee cooperation and intention to quit in U.S. invested enterprises in China.” Int. J. Organ. Anal., 11(1), 3–19.
Seibert, S. E., Silver, S. R., and Randolph, W. A. (2004). “Taking empowerment to the next level: A multiple-level model of empowerment, performance, and satisfaction.” Acad. Manage. J., 47(3), 332–349.
Sobel, M. E. (1982). “Asymptotic confidence intervals for indirect effects in structural equation models.” Sociological methodology, S. Leinhardt, ed., American Sociological Association, Washington, D.C., 290–312.
Sonnentag, S., and Frese, M. (2002). “Performance concepts and performance theory.” Psychological management of individual performance, S. Sonnentag, ed., Wiley, New York, 3–25.
Spector, P. E., and Jex, S. M. (1998). “Development of four self-report measures of job stressors and strain: Interpersonal conflict at work scale, organizational constraints scale, quantitative workload inventory, and physical symptoms inventory.” J. Occup. Health Psychol., 3(4), 356–367.
Spreitzer, G. M. (1995a). “Psychological empowerment in the workplace: Dimensions, measurement and validation.” Acad. Manage. J., 38(5), 1442–1465.
Spreitzer, G. M. (1995b). “An empirical test of a comprehensive model of intrapersonal empowerment in the workplace.” Am. J. Community Psychol., 23(5), 601–629.
Spreitzer, G. M. (1997). “Toward a common ground in defining empowerment.” Research in organizational change and development, W. A. Pasmore and R. W. Woodman, eds., JAI, Oxford, England, 31–62.
Spreitzer, G. M., Kizilos, M. A., and Nason, S. W. (1997). “A dimensional analysis of the relationship between psychological empowerment and effectiveness, satisfaction, and strain.” J. Manage., 23(5), 679–704.
Strahan, R., and Gerbesi, K. C. (1972). “Short, homogeneous versions of the Marlow-Crowne social desirability scale.” J. Clin. Psychol., 28(2), 191–193.
Tabachnick, B. G., and Fidell, L. S. (2001). Using multivariate statistics, Allyn and Bacon, Needham Heights, Mass.
Thomas, K. W., and Tymon, W. G. (1994). “Does empowerment always work? Understanding the role of intrinsic motivation and personal interpretation.” J. Manage. Systems, 6(2), 1–13.
Thomas, K. W., and Velthouse, B. A. (1990). “Cognitive elements of empowerment: An interpretive model of intrinsic task motivation.” Acad. Manage. J., 15(4), 666–681.
Tuuli, M. M. (2009). “Empowerment and control dynamics in project teams: A multilevel examination of the antecedents and job performance consequences.” Ph.D. thesis, Dept. of Real Estate and Construction, The Univ. of Hong Kong, Hong Kong.
Tuuli, M. M., and Rowlinson, S. (2007a). “Empowering project teams: Toward an integrative conceptualization of empowerment.” Proc., 4th Int. Conf. on Construction in the 21st Century (CITC IV), S. M. Ahmed, S. Azhar, and S. Mohamed, eds., CITV-IV, Miami, 240–247.
Tuuli, M. M., and Rowlinson, S. (2007b). “Towards a conceptual framework of empowerment and job performance in project teams.” Proc., 23rd ARCOM Annual Conf. 2007, D. Boyd, ed., Association of Researchers in Construction Management, Belfast, Northern Ireland, 3–12.
Tuuli, M. M., and Rowlinson, S. (2009). “Empowerment in project teams: A multilevel examination of the job performance implications.” Constr. Manage. Econom., in press.
Van Scotter, J. R., and Motowidlo, S. J. (1996). “Interpersonal facilitation and job dedication as separate facets of contextual performance.” J. Appl. Psychol., 81(5), 525–531.
Vroom, V. H. (1964). Work and motivation, Wiley, New York.
Walker, A. (2002). Project management in construction, Blackwell Science, Oxford, U.K.
Wall, T. D., Cordery, J. L., and Clegg, C. W. (2002). “Empowerment, performance, and operational uncertainty: A theoretical integration.” Appl. Psychol. Int. Rev., 51(1), 146–169.
Williams, L. J., and Anderson, S. E. (1991). “Job satisfaction and organizational commitment as predictors of organizational citizenship and in-role behaviors.” J. Manage., 17(3), 601–617.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 135Issue 12December 2009
Pages: 1334 - 1347

History

Received: Sep 10, 2008
Accepted: Jun 8, 2009
Published online: Jun 10, 2009
Published in print: Dec 2009

Permissions

Request permissions for this article.

Authors

Affiliations

Martin Morgan Tuuli [email protected]
Senior Lecturer, School of Architecture and the Built Environment, University of Westminster, 35 Marylebone Rd., London NW1 5LS, U.K. (corresponding author). E-mail: [email protected]
Steve Rowlinson [email protected]
Professor, Dept. of Real Estate and Construction, The Univ. of Hong Kong, Pokfulam Rd., Hong Kong. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share