Enhancements of CORSIM Model in Simulating Transit Operations
Publication: Journal of Transportation Engineering
Volume 126, Issue 5
Abstract
A CORSIM-based microscopic simulation model is developed, which provides transit planners and operators with the ability to simulate bus operations on transit routes. Several modules in CORSIM for processing bus operations are modified to calculate bus dwell times at stops. The bus dwell time is dynamically determined by the passenger arrival rate, average boarding time, and vehicle interdeparture time (headway). Bunching of buses—due to variations in passenger demand at stops, travel times on streets, and delays at intersections—deteriorates the quality of service and operating efficiency, which can be observed from the simulation results. The input requirements and the modular nature of the proposed model are highlighted. Outputs, including bus arrival and departure times, dwell time, and average passenger waiting time at each stop, are generated for the evaluation of bus operations. The proposed simulation model is calibrated and validated by two sets of data collected from bus route 39 of the New Jersey Transit Corporation.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Abkowitz, M., Eiger, A., and Engelstein, I. (1986). “Optimal control of headway variation on transit routes.” J. Advanced Transp., 20(1), 73–88.
2.
Adamski, A. (1992). “Probabilistic model of passenger service processes at bus stops.” Transp. Res., 26B(4), 253–259.
3.
Chien, I. J. ( 1995). “Optimization of coordinated intermodal transit networks.” PhD dissertation, Civ. Engrg. Dept., Transp. Studies Ctr., University of Maryland at College Park, College Park, Md.
4.
Chien, I. J., and Ding, Y. ( 1999). “A real-time headway control strategy in transit operations.” Accepted for publication and presentation, ITS Toronto.
5.
Chien, I. J., Ding, Y., and Zayas, N. ( 1999). “Validation of enhanced CORSIM for simulating transit operations.” Working Paper 99-01, Inst. for Transp., New Jersey Institute of Technology, Newark.
6.
Federal Highway Administration (FHWA). ( 1996). “CORSIM user's manual.” Contract No. DTFH61-92-Z-00074, Washington, D.C.
7.
Guenthner, R. P., and Hamat, K. (1988). “Distribution of bus transit on-time performance.” Transp. Res. Rec. 1202, Transportation Research Board, Washington, D.C., 1–8.
8.
Guenthner, R. P., and Sinha, K. C. (1983). “Modeling bus delays due to passenger boardings and alightings.” Transp. Res. Rec. 915, Transportation Research Board, Washington, D.C., 7–13.
9.
Transportation Research Board (TRB). (1997). “Transit capacity: Chapter 12.” Highway Capacity Manual, Spec. Rep. 209, 2nd Ed., National Research Council, Washington, D.C.
10.
Holroyd, E. M., and Scraggs, D. A. (1966). “Waiting times for buses in central London.” Traffic Engrg. and Control, London, 8(3), 158–160.
11.
Jolliffe, J. K., and Hutchinson, T. P. (1975). “A behavioral explanation of the association between bus and passenger arrivals at a bus stop.” Transp. Sci., 9(3), 248–282.
12.
Koffman, D. (1978). “A simulation study of alternative real-time bus headway control strategies.” Transp. Res. Rec. 663, Transportation Research Board, Washington, D.C., 41–46.
13.
Kraft, W. H., and Deutschman, H. (1977). “Bus passenger service-time distributions.” Transp. Res. Rec. 625, Transportation Research Board, Washington, D.C., 37–43.
14.
Kulash, D. ( 1970). “Routing and scheduling in public transportation systems.” PhD thesis, Massachusetts Institute of Technology, Cambridge, Mass.
15.
Larson, R. C., and Odoni, A. R. (1976). Urban operations research, Prentice-Hall, Englewood Cliffs, N.J.
16.
Lee, K. K. T., and Schonfeld, P. M. (1991). “Optimal slack times for timed transfers at a transit terminal.” J. Advanced Transp., 25(3), 281–308.
17.
O'Flaherty, C. A., and Mangan, D. O. (1970). “Bus passenger waiting times in central areas.” Traffic Engrg. and Control, London, 11(9), 419–421.
18.
Osuna, E. E., and Newell, G. F. (1972). “Control strategies for an idealized public transportation system.” Transp. Sci., 6(1), 52–72.
19.
Seddon, P. A., and Day, M. P. (1974). “Bus passenger waiting times in greater Manchester.” Traffic Engrg. and Control, London, 15(9), 442–445.
20.
Talley, W. K., and Becker, A. J. (1987). “On-time performance and the exponential probability distribution.” Transp. Res. Rec. 1108, Transportation Research Board, Washington, D.C., 22–26.
21.
Turnquist, M. A. (1978). “A model for investigating the effects of service frequency and reliability on bus passenger waiting time.” Transp. Res. Rec. 663, Transportation Research Board, Washington, D.C., 70–73.
22.
Vandebona, U., and Richardson, A. J. (1985). “TRAMS: Transit route animation and modeling by simulation.” J. Advanced Transp., 19(2), 153–177.
23.
Welding, P. I. (1957). “The instability of close interval service.” Operational Res. Quarterly, 8(3), 133–148.
24.
Zografos, K. G., and Levinson, H. S. (1986). “Passenger service time for a no-fare bus system.” Transp. Res. Rec. 1051, Transportation Research Board, Washington, D.C., 42–48.
Information & Authors
Information
Published In
History
Received: Dec 23, 1997
Published online: Sep 1, 2000
Published in print: Sep 2000
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.