Highway Maintenance Fund Allocation: Tabulated Manual Procedure
Publication: Journal of Transportation Engineering
Volume 123, Issue 5
Abstract
Several variables are usually considered when fund is allocated for highway improvement programs. Among these variables are the project improvement alternatives for each highway, the different locations available, and the annual maintenance budget. The different improvements and location alternatives provide the flexibility needed to optimize the costs or benefits of improvement projects within the constraint of a given budget. Integer programming techniques and computer programs are the basic requirement for solving the fund allocation problems. These programs and the appropriate computers, despite the decrease of hardware and software costs, may not always be available, especially in developing countries. There can also be a shortage of professionals who can use the integer programming techniques to solve the problem. This paper presents a developed tabulated manual procedure to get the optimum or “nearly optimum” solution for the highway maintenance fund allocation problems. A sample project solved by the computerized integer program is given, and the result is compared with that obtained by the developed tables.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Ahmed, N. U. (1983). “An analytical decision model for resource allocation in highway maintenance management.”Transp. Res., 17A(2), 133–138.
2.
Carnahan, J. V.(1988). “Analytical framework for optimizing pavement maintenance.”J. Transp. Engrg., ASCE, 114(3), 307–322.
3.
Carnahan, J. V., Davis, W. J., Shahin, M. Y., Keane, P. L., and Wu, M. I.(1987). “Optimal maintenance decisions for pavement management.”J. Transp. Engrg., ASCE, 113(5), 554–572.
4.
Corby, O., Allez, F., and Neveu, B. (1990). “A multi-expert system for pavement diagnoses and rehabilitation.”Transp. Res., 24A(1), 53–57.
5.
Fwa, T. F., and Chan, W. T.(1993). “Priority rating of highway maintenance needs by neural networks.”J. Transp. Engrg., ASCE, 119(3), 419–432.
6.
Fwa, T. F., Sinha, K. C., and Riverson, J. D.(1988). “Highway routine maintenance programming at network level.”J. Transp. Engrg., ASCE, 114(5), 539–554.
7.
Golabi, K., Kulkarni, R., and Way, G.(1982). “A statewide pavement management system.”Interfaces, 12(6), 5–21.
8.
Janson, B. N.(1988). “Method of programming regional highway projects.”J. Transp. Engrg., ASCE, 114(5), 584–606.
9.
Johnson, E. L., Kostreva, M. M., and Suhl, U. H.(1985). “Sloving 0-1 integer programming problems arising from large scale planning model.”Operational Res., 33(4), 803–819.
10.
Klein, M.(1962). “Inspection-maintenance-replacement schedules under Markovian deterioration.”Mgmt. Sci., 9(1), 25–32.
11.
Kolesar, P.(1966). “Minimum cost replacement under Markovian deterioration.”Mgmt. Sci., 12(9), 694–766.
12.
LINDO user manual (Linear, INteractive and Discrete Optimizer). (1982). Lindo System Inc.
13.
Nemhauser, G. L., and Ullmann, Z.(1969). “Discrete dynamic programming and capital allocation.”Mgmt. Sci., 15(9), 494–505.
14.
Ritchie, S., Yeh, C., Mahoney, J., and Jackson, N.(1987). “Surface condition expert system for pavement rehabilitation planning.”J. Transp. Engrg., ASCE, 113(2), 155–167.
15.
Sinha, K. C., Kaji, T., and Liu, C. C. (1981). “Optimal allocation of funds for highway safety improvement projects.”Transp. Res. Rec., 808.
16.
Weingartner, H. M. (1963). Mathematical programming and the analysis of capital budgeting problems. Prentice-Hall, Inc., Englewood Cliffs, N.J.
Information & Authors
Information
Published In
Copyright
Copyright © 1997 American Society of Civil Engineers.
History
Published online: Sep 1, 1997
Published in print: Sep 1997
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.