Channel Degradation Downstream from the Three Gorges Project and Its Impacts on Flood Level
Publication: Journal of Hydraulic Engineering
Volume 135, Issue 9
Abstract
The effects of the sediment regime on the flood level in the middle reach of the Yangtze River before and after the construction of the Three Gorges Dam (TGD) are investigated. Before the dam construction, the sediment regime has driven the flood level higher and higher over recent decades in the middle reach of the Yangtze River, which has reflected changes in the location and amount of sediment deposition. After dam completion, the magnitude and rate of channel degradation determines the process of flood stage lowering but they are difficult to estimate owing to insufficient understanding of the sediment discharge recovery process. To make a rational prediction of channel degradation of the Yangtze River downstream from the TGD, the sediment transport rate during channel degradation downstream from other dams is examined. It is found that, for any grain size, postdam sediment transport rates cannot exceed the predam level at any location along the downstream channel. Erosion amounts predicted for the reach downstream from the TGD before its closure are too high. In light of this, a numerical simulation of the channel degradation process is carried out. The results indicate that, although degradation takes place immediately after the TGD closure, the flood level in the middle reach of the Yangtze River will still remain at its predam condition in the following 20 years. This is determined not only by the regional characteristics of the middle reach of the Yangtze River but also by the common law of sediment transportation downstream from dams.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
The study is supported by the National Key Basic Research and Development Program (Grant No. UNSPECIFIED2003CB415200).
References
Brandt, S. A. (2000). “Classification of geomorphological effects downstream of dams.” Catena, 40, 375–401.
Chen, Z. Y., Li, J. F., Shen, H. T., and Wang, Z. H. (2001). “Yangtze River of China: Historical analysis of discharge variability and sediment flux.” Geomorphology, 41, 77–91.
Chien, N. (1985). “Changes in river regime after the construction of upstream reservoirs.” Earth Surf. Processes Landforms, 10, 143–159.
China Institute of Water Resources and Hydropower Research (CIWHR). (2002). “Research on riverbed erosion process downstream the Three Gorges Project.” Research on sediment problem of the Three Gorges Project in 1996–2000, Vol. 7, Intellectual Property, Beijing, 149–210 (in Chinese).
Friedman, J. M., Osterkamp, W. R., Scott, M. L., and Auble, G. T. (1998). “Downstream effects of dams on channel geometry and bottomland vegetation, regional patterns in the Great Plains.” Wetlands, 18, 619–633.
Gilvear, D. J. (2004). “Patterns of the channel adjustment to impoundment of the upper River Spey, Scotland (1942–2000).” River Res. Appl., 20, 151–165.
Grasser, M. M., and Gamal, F. E. (1994). “Aswan High Dam: Lesson learnt and on-going research.” Int. Water Power Dam Constr., 46(1), 35–39.
Hales, Z. L., Shindala, A., and Denson, K. H. (1970). “River degradation prediction.” Water Resour. Res., 6, 549–556.
Han, Q. W., and He, M. M. (1995). “Erosion of river reach downstream Three Gorges Reservoir and its influence on flood prevention.” J. Hydroelectric Eng., 3, 34–46 (in Chinese).
Hydrologic Engineering Center (HEC). (1977). HEC-6 scour and deposition in rivers and reservoirs, users manual, U.S. Army Corps of Engineers, Davis, Calif.
Li, Y. T. (1987). “Bed-material sediment gradation for nonuniform sediment transport.” J. Sediment Res., 1, 82–87 (in Chinese).
Li, Y. T., and Shang, Q. M. (1998). “Modeling of sediment transport in unsteady flow.” J. Sediment Res., 1, 81–87 (in Chinese).
Phillips, J. D. (2003). “Toledo Bend Reservoir and geomorphic response in the lower Sabine River.” River Res. Appl., 19, 137–159.
Shalash, S. (1983). “Degradation of the River Nile—1.” Int. Water Power Dam Constr., 35(7), 37–43.
Simon, A., Thomas, R. E., Curini, A., and Shields, F. D. (2002). “Case study: Channel stability of the Missouri River, eastern Montana.” J. Hydraul. Eng., 128(10), 880–890.
Wang, C. H., and Han, Q. W. (1997). “Research of tendency of the Jingjiang reach evolution after Three Gorges Project being completed.” Technical Rep. Prepared for China Institute of Water Resources and Hydro-Power Research, Beijing (in Chinese).
Wu, W. (1991). “The study and application of 1-D, horizontal 2-D and their nesting mathematical models for sediment transport.” Ph.D. dissertation, Wuhan Univ. of Hydraulic and Electric Engineering, Wuhan (in Chinese).
Xie, J. H. (1990). “Preliminary study on the meandering channel pattern in the lower Jingjiang River and its changing tendency.” Research of sediment problem of the Three Gorges Project, B. N. Lin, ed., Science and Technology, Beijing, 52–61 (in Chinese).
Yangtze River Scientific Research Institute (YRSRI). (2002). “Computational analysis of the reach from Yichang to Datong downstream the Three Gorges Project.” Research on sediment problem of the Three Gorges Project in 1996–2000, Vol. 7, Intellectual Property, Beijing, 258–311 (in Chinese).
Yangtze Water Conservancy Committee (2004). Annual Rep. Prepared for Changjiang Water and Sediment, Wuhan (in Chinese).
Yin, H., Liu, G., Pi, J., Chen, G., and Li, C. (2007). “On the river–lake relationship of the middle Yangtze reaches.” Geomorphology, 85, 197–207.
Information & Authors
Information
Published In
Copyright
© 2009 ASCE.
History
Received: Jul 7, 2006
Accepted: Apr 24, 2009
Published online: Aug 14, 2009
Published in print: Sep 2009
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.