DISCUSSIONS AND CLOSURES
Mar 1, 2008

Discussion of “Developing a Complexity Measure for Project Schedules” by Khaled M. Nassar and Mohamed Y. Hegab

This article is a reply.
VIEW THE ORIGINAL ARTICLE
This article is a reply.
VIEW THE ORIGINAL ARTICLE
Publication: Journal of Construction Engineering and Management
Volume 134, Issue 3
First page of PDF

Get full access to this article

View all available purchase options and get full access to this article.

References

Auyang, S. Y. (1998). Foundations of complex-system theories: In economics, evolutionary biology, and statistical physics, Cambridge University Press, Cambridge, U.K.
Badii, R., and Politi, A. (1997). Complexity: Hierarchical structures and scaling in physics, Cambridge University Press, Cambridge, U.K.
Bang-Jensen, J., and Gutin, G. (2006). Digraphs: Theory, algorithms and applications, 4th Ed., Springer, London.
Bertelsen, S. (2003). “Construction as a complex system.” Proc., 11th Annual Conf. in the Int. Group for Lean Construction, Blacksburg, Va., ⟨http://www.bertelsen.org⟩ (July 2006).
Davies, E. M. (1974). “An experimental investigation of resource allocation in multiactively projects.” Oper. Res. Q., 24(4), 587–591.
Elmaghraby, S. E. (1977). Activity networks: Project planning and control by network models, Wiley, New York.
Holland, J. H. (1998). Emergence: From chaos to order, Oxford University Press, Oxford, U.K.
Kaiman, R. A. (1974). “Coefficient of network complexity and coefficient of network complexity.” Manage. Sci., 21(2), 172–177.
Pascoe, T. L. (1966). “Allocation of resources—CPM.” Rev. Er. Rech. Oper., 38(1), 31–38.
Shalizi, C. R. (2006). “Methods and techniques of complex systems science: An overview.” Nonlinear sciences, abstract, nlin.AO/0307015, ⟨http://arxiv.org/abs/nlin.AO/0307015⟩ (July 2006).

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 134Issue 3March 2008
Pages: 228 - 230

History

Published online: Mar 1, 2008
Published in print: Mar 2008

Permissions

Request permissions for this article.

Authors

Affiliations

Ph.D. Candidate, Dept. of Construction Management, School of Management, Tianjin Univ., Tianjin, China 300072; formerly, Associate Professor, Dept. of Construction Management, School of Civil Engineering, Lanzhou Jiaotong Univ., Gansu, China 730070. E-mail: [email protected]
Yilin Yin
Professor, Inst. of Public Project Management, School of Economics and Management, Tianjin Univ. of Technology, Tianjin, China 300191.
Mingxia Gao
Ph.D. Candidate, Inst. of System Engineering, School of Management, Tianjin Univ., Tianjin, China 300072.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share