TECHNICAL PAPERS
Jun 1, 2006

Developing a Complexity Measure for Project Schedules

This article has a reply.
VIEW THE REPLY
This article has a reply.
VIEW THE REPLY
Publication: Journal of Construction Engineering and Management
Volume 132, Issue 6

Abstract

Several factors contribute to the complexity of project schedules, including the number of activities, the level of detail, and the shape of the project network. This paper presents a measure that assesses the complexity of project schedules in terms of the connectivity of the activities. Unlike similar complexity measures, the proposed complexity measure does not consider redundant relationships in the project’s schedule. In addition, the measure is expressed as a percentage and therefore has the advantage of being intuitively understand by project managers. The measure considers the degree of interrelationships between the activities in the project’s schedule. The measure has been implemented in a computerized tool to help managers assess the complexity of their projects. The tool is developed as an add-in to popular commercial scheduling software like MS Project.

Get full access to this article

View all available purchase options and get full access to this article.

References

Badiru, A., and Pulat, P. A. (1995). “Comprehensive project management: Integrating, optimization models.” Management principles and computers, Prentice-Hall, Englewood Cliffs, N.J.
Davies, E. M. (1974). “An experimental investigation of resource allocation in multiactivity projects.” Oper. Res. Q., 24(4), 587–591.
Edmonds, B. (1998). “What is complexity? The philosophy of complexity per se with application to some examples in evolution.” The evolution of complexity, F. Heylighen and D. Aerts eds., Kluwer, Dordrecht, The Netherlands.
Elmaghraby, S. E., and Herroelen, W. S. (1980). “On the measurement of complexity in activity networks.” Eur. J. Oper. Res., 5(4), 225–230.
Kaimann, R. A. (1974). “Coefficient of network complexity and coefficient of network complexity.” Manage. Sci., 21(2), 172–177.
Latva-Koivisto, A. M. (2001). “Finding a complexity measure for business process models.” Research Rep. prepared for Helsinki Univ. of Technology, Systems Analysis Laboratory, Espoo, Finland.
National Institute of Building Sciences (NIBS). (2002). Unified facilities guide specification for network analysis systems (UFGS), NIBS, Washington, D.C.
Pascoe, T. L. (1966). “Allocation of resources—CPM.” Rev. Fr. Rech. Oper., 38(1), 31–38.
Temperley, H. M. V. (1981). Graph theory and applications, Ellis Horwood Ltd., U.K.
Thesen, A. (1977). “Measures of the restrictiveness of project networks.” Networks, 7(3), 193–208.
Wantanakorn, D. (2002). “Project network complexity.” Construction Management Group, Thammasat Univ., Thammasat, Thailand.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 132Issue 6June 2006
Pages: 554 - 561

History

Received: Sep 10, 2004
Accepted: Nov 23, 2005
Published online: Jun 1, 2006
Published in print: Jun 2006

Permissions

Request permissions for this article.

Authors

Affiliations

Khaled M. Nassar [email protected]
Associate Professor, Dept. of Technology, Univ. of Maryland Eastern Shore, Princess Ann, MD 21853. E-mail: [email protected]
Mohamed Y. Hegab, M.ASCE [email protected]
P.E.
Assistant Professor, Civil Engineering and Applied Mechanics Dept., California State Univ., Northridge, 18111 Nordhoff St., Northridge, CA 91330 (corresponding author). E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share