Abstract
Intuitively, there should be a relationship between the size of the design fee for a transportation project and the quality of the resulting design. This study sought that relationship by looking at the fee expressed as a percentage of the construction cost and the final construction cost growth from the engineer’s initial estimate of the construction cost at the time the design contract was awarded. The research team analyzed 31 projects from the Oklahoma Turnpike Authority with a total construction value of $90 million. The projects were divided into road and bridge projects. Based on the results of the analysis, it seems that as the design fee decreases, the absolute percentage of construction cost growth from the engineer’s early estimate increases. The relationship is strongest for bridge projects, which tend to be more technically complex to design than roadway projects. This confirms for U.S. projects the result of an earlier study in Saudi Arabia. This paper concludes that the design fee should be viewed as an investment at a point in time where the ability to impact the project is the highest and can accrue the benefit of reduced cost growth.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
The writers would like to gratefully express their appreciation for the funding received from the Oklahoma Transportation Center and the support from the Oklahoma Turnpike Authority to complete this project.
References
Beemer, J. (2005). “The cost of perfection in public works projects: A design professional’s perspective.” American Council of Engineering Companies, Government Advocacy, ⟨http://www.acec.org/advocacy/pdf/tcop_2006-04-20.pdf⟩ (July 10, 2006).
Brown, J. T. (2002). “Controlling costs using design quality workshops.” 2002 transactions, AACEI, Washington, D.C., CSC.10.1–CSC10.9.
Bubshait, A. A., Al-Said, F. A., and Abolnour, M. M. (1998). “Design fee versus design deficiency.” J. Archit. Eng., 4(2), 44–46.
Burati, J. L., Farrington, J. J., and Ledbetter, W. B. (1992). “Causes of quality deviations in design and construction.” J. Constr. Eng. Manage., 118(1), 34–49.
Carr, P. G., and Beyor, P. S. (2005). “Design fees, the state of the profession, and a time for corrective action.” J. Manage. Eng., 21(3), 110–117.
Construction Management Association of America (CMAA). (2003). “Speed, communication, and commissioning issues are top owner concerns, FMI/CMAA survey finds.” ⟨http://cmaanet.org/owners_survey.php⟩ (June 24, 2006).
Flyvbjerg, B., Holm, M., and Buhl, S. (2002). “Underestimating costs in public works projects: Error or lie?” J. Am. Plan. Assn., 68(3), 279–295.
Gransberg, D. D., and Villarreal, M. E. (2002). “Construction project performance metrics.” 2002 transactions, AACEI, Portland, Ore., CSC.02.01–CSC.02.05.
Janacek, J. (2006). “Construction costs going through the roof?” Presentation, 2006 Public Works Officer Institute, Los Angeles.
Kirby, J. G., Furry, D. A., and Hiks, D. K. (1988). “Improvements in design review management.” J. Constr. Eng. Manage., 114(1), 69–82.
Konchar, M., and Sanvido, V. (1998). “Comparison of U.S. project delivery systems.” J. Constr. Eng. Manage., 124(6), 435–444.
Love, P. E. D., Smith, J., Treloar, G. J., and Li, H. (2000). “Some empirical observations of service quality in construction.” Eng., Constr., Archit. Manage., 7(2), 191–196.
McGeorge, J. F. (1988). “Design productivity: Quality problem.” J. Manage. Eng., 4(4), 350–362.
McSkimming, J., Peck, B., Hoy, B., and Carr, S. (2005). “The quality of design documents: What can the cm do?” CMAA forum on quality of design documents, ⟨http://cmaanet.org/user_images/forum.quality_of_design_documents_-_mcskimming.pdf⟩ (Jan. 5, 2007).
Molenaar, K. R. (2005). “Programmatic cost risk analysis for highway megaprojects.” J. Constr. Eng. Manage., 131(3), 343–353.
Morgen, E. T. (1986). Claims by the federal government against its A/E—Guidelines for improving practice, Office for Professional Liability Research, Victor O. Schinner and Co., Washington, D.C.
National Society of Professional Engineers (NSPE). (1999). “Qualifications based selection issue paper.” NSPE issue briefs, ⟨http://www.nspe.org/govrel/gr2%2D4022.asp⟩ (July 9, 1999).
Newbold (1988). Statistics for business and economics, 2nd Ed., Prentice-Hall, Englewood Cliffs, N.J., 462–463.
Trost, S. M., and Oberlender, G. D. (2003). “Predicting accuracy of early cost estimates using factor analysis and multivariate regression.” J. Constr. Eng. Manage., 129(2), 198–204.
Venters, V. G. (2004). “Cost of quality.” 2004 transactions, AACEI, Washington, D.C., EST.04.01–EST.04.07.
Information & Authors
Information
Published In
Copyright
© 2007 ASCE.
History
Received: Sep 25, 2006
Accepted: Nov 13, 2006
Published online: Jun 1, 2007
Published in print: Jun 2007
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.