TECHNICAL PAPERS
Jan 1, 2006

Use of a WBS Matrix to Improve Interface Management in Projects

Publication: Journal of Construction Engineering and Management
Volume 132, Issue 1

Abstract

Many researchers agree that smoother construction would result from better communication between designers and constructors about specific requirements and constraints for construction that can be incorporated into the design. The same principle can be generalized to apply to all the phases of a construction project (design, equipment procurement, transport, delivery, installation, and testing, as well as hand-over activities), to the different partners (main contractors, subcontractors, and suppliers), and even internally to the teams working on different parts of a system for the same contractor. Specific requirements and constraints at work interfaces that are technical, organizational, temporal, and geographical in nature have to be made transparent so that they can be managed and resolved to avoid unnecessary reworks and delays. This paper proposes to use the work breakdown structure (WBS) concept to improve work interface management. In the manufacturing industry, the WBS concept is well exploited by crossing a horizontal breakdown of production activities with a vertical breakdown of final products, thus obtaining a WBS matrix, which is more complete and useful than the classical WBS tree. In this paper, the WBS and interface management concepts are first clarified. Then, it is proposed to transpose the WBS matrix concept into the construction industry and to analyze, in a case study, how it may be used to improve interface management. The case study involves the construction of a segment of a mass rapid transit system comprising many specialty trades spanning track works, power supply, signaling, passenger vehicles, and control.

Get full access to this article

View all available purchase options and get full access to this article.

References

Albert, N. (1995). “Developing a useable work breakdown structure.” Parametric cost estimating handbook, 1st Ed., Appendix B. ⟨http://www.jsc.nasa.gov/bu2/PCEHHTML/pceh.htm⟩.
Ayas, K. (1997). “Integrating corporate learning with project management.” Int. J. Prod. Econ., 51, 59–67.
Bachy, G., and Hameri, A.-P. (1997). “What to be implemented at the early stage of a large-scale project.” Int. J. Proj. Manage., 16(4), 211–218.
Caron, F., Marchet, G., and Perego, A. (1998). “Project logistics: Integrating the procurement and construction processes.” Int. J. Proj. Manage., 16(5), 311–319.
Christensen, M. J., and Thayer, R. H. (2001). “The work breakdown structure.” The project manager’s guide to software engineering’s best practices, IEEE Computer Society, Los Alamitos, Calif.
Colenso, K. (2000). “Creating the work breakdown structure.” White Papers. ⟨http://www.aisc.com/us/lang̱en/library/white̱papers/Creating̱a̱WorḵBreakdowṉStructure.pdf⟩.
De Heredia Scasso, R., and Santana Larenas, G. (1991). “Project-breakdown structure: The tools for representing the project system in project management.” Int. J. Proj. Manage., 9(3), 157–161.
Globerson, S. (1994). “Impact of various work-breakdown structures on project conceptualization.” Int. J. Proj. Manage., 12(3), 165–171.
Healy, P. (1997). “Interfaces.” Project management: Getting the job done on time and in budget, Butterworth-Heinemann, Port Melbourne, Vic., 267–278.
Lanford, H. W., and McCann, T. M. (1983). “Effective planning and control of large projects—Using work breakdown structure.” Long Range Plann., 16(2), 38–50.
Leiringer, R. (2000). “Construction process models—Enabling a shared project understanding.” Int. Group for Lean Construction Eighth Annual Conf.
Matthews, M. D. (1986). “Networking and information management: Its use by the project planning function.” Information and Management, 10, 1–9.
Morris, P. W. G. (1983). “Managing project interfaces—Key points for project success.” Project management handbook, D. I. Cleland and W. R. King, eds., Van Nostrand Reinhold, New York, 3–36.
Reilly, N. B. (1993). “The work breakdown structure.” Successful systems engineering for engineers and managers, Van Nostrand Reinhold, New York, 45–68.
Richman, L. (2002). “Creating a work breakdown structure.” Project management step-by-step, Amacom, New York, 75–78.
Ruskin, A. M., and Estes, W. E. (1995). “Work breakdown structure paradigms and processes.” What every engineer should know about project management, M. Dekker, New York, 221–236.
Saynisch, M. (1983). “Project management system for a large international project.” Proj. Manage. J., 1(2), 115–121.
Smith, L. A., and Mills, J. (1983). “Reporting characteristics of automated project management systems.” Proj. Manage. J., 1(3).
Stuckenbruck, L. C. (1983). “Integration: The essential function of project management.” Project Management Handbook, D. I. Cleland and W. R. King, eds., Van Nostrand Reinhold, New York, 37–58.
Sundgren, N. (1999). “Introducing interface management in new product family development.” Journal of Production and Innovation Management, 16, 40–51.
Tiner, W. D. (1985). “Subdivision of work on construction projects.” Proj. Manage. J., 3(1), 13–18.
Töpfer, A. (1995). “New products-cutting the time to market.” Long Range Plann., 28(2), 61–78.
Verzuh, E. (1999). “Work breakdown structure.” The fast forward MBA in project management, J. Wiley, New York, 101–119.
Warner, P. (1997). “How to use a work breakdown structure.” Field guide to project management, D. I. Cleland, ed., Van Nostrand Reinhold, New York, 74–89.
Wren, D. A. (1967). “Interface and interorganizational coordination.” Acad. Manage J., 10(1), 69–81.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 132Issue 1January 2006
Pages: 67 - 79

History

Received: Jun 22, 2004
Accepted: Jan 31, 2005
Published online: Jan 1, 2006
Published in print: Jan 2006

Permissions

Request permissions for this article.

Authors

Affiliations

David K. Chua, M.ASCE [email protected]
Associate Professor, Dept. of Civil Engineering, National Univ. of Singapore, Singapore 119260. E-mail: [email protected]
Myriam Godinot
Research Scholar, Dept. of Civil Engineering, National Univ. of Singapore, Singapore 119260.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share