Building Better: Technical Support for Construction
Publication: Journal of Construction Engineering and Management
Volume 131, Issue 1
Abstract
Increasing complexity of many constructed facilities and escalating demands for project performance are driving significant changes in design and construction. Increased project integration and technical support of construction operations provide a promising response to these demands. This paper identifies and describes nine critical activities to increase technical support for construction: integrate early planning; plan for regulatory compliance; consider construction methods and sequences in design; tailor and time technical information to users’ needs; provide materials to support effective construction; identify and provide construction-applied resources; create an environment for safe, productive, and high quality work; technically support efficient construction operations and completion; and transfer experience between projects. The paper’s relevance to industry practitioners includes multiple benefits of completing these activities for firms, projects, and professionals, along with the necessary steps to develop this capability and gain these benefits. Educators and researchers can use the activities to structure course topics related to technical fundamentals of construction and integration with design, along with future investigations of construction process knowledge.
Get full access to this article
View all available purchase options and get full access to this article.
References
Construction Industry Institute (CII) (1987). “Constructability concepts file.” Constructability task force, publication 3-3, Austin, Tex.
Fischer, M., and Froese, T. (1996). “Examples and characteristics of shared project models,” J. Comput. Civ. Eng., 10(3), 174–182.
Fischer, M. A. and Tatum, C. B. (1997). “Characteristics of design-relevant constructability knowledge.” J. Constr. Eng. Manage., 123(3), 253–260.
Gugel, J. G., and Russell, J. S. (1994). “Model for constructability approach selection,” J. Constr. Eng. Manage., 120(3), 509–521.
Hampson, K., and Tatum, C. B. (1997). “Technology strategy and competitive performance in bridge construction.” J. Constr. Eng. Manage., 123(2), 153–161.
Kartam, N. (1997). “Constructability feedback systems: Issues and illustrative prototype.” J. Perform. Constr. Facil., 11(4), 178–183.
Nam, C. H., Gasiorowski, J. G., and Tatum, C. B. (1991). “Microlevel study of integration in high-strength concrete innovation.” J. Constr. Eng. Manage., 117(2), 294–309.
O’Connor, J. T., and Tucker, R. L. (1986). “Industrial project constructability improvement.” J. Constr. Eng. Manage., 112(1), 69–82.
Parsons, R. (1972). “System for control of construction quality.” J. Constr. Eng. Div., 98(1), 21–36.
Porter, M. (1980). Competitive strategy, techniques for analyzing industries and competitors, The Free Press, New York.
Stewart, W. S., and Tatum, C. B. (1988). “Segmental placement of the renton outfall: Construction innovation.” J. Constr. Eng. Manage., 114(3), 390–407.
Tatum, C. B. (1983a). “Heavy rigging for nuclear projects.” J. Constr. Eng. Manage., 109(1), 48–60.
Tatum, C. B. (1983b) “Innovations in nuclear concrete construction.” J. Constr. Eng. Manage., 109(2), 131–145.
Tatum, C. B. (1984). “Organizing large projects: How managers decide.” J. Constr. Eng. Manage., 110(3) 346–358.
Tatum, C. B. (1987). “Improving constructibility during conceptual planning.” J. Constr. Eng. Manage., 113(2) 191–207.
Tatum, C. B., (1989a). “Management challenges of integrating construction methods and design approaches.” J. Manage. Eng., 5(2), 139–154.
Tatum, C. B., (1989b). “Managing for increased design and construction innovation.” J. Manage. Eng., 5(4) 385–399.
Tatum, C. B., Bauer, M. F., and Meade, A. W. (1989). “Process of innovation for “up∕down” construction at Rowes Wharf.” J. Constr. Eng. Manage., 115(2) 179–195.
Tatum, C. B., and Harris, J. A. (1981). “Construction plant requirements for nuclear sites.” J. Constr. Div., Am. Soc. Civ. Eng., 107(4), 543–550.
Tatum, C. B., and Korman, T. (2000). “Coordinating building systems: Process and knowledge.” J. Archit. Eng., 6(4), 116–121.
Tatum, C. B., and Teague, F. G. (1981). “Managing the engineering∕construction interface for improved project performance.” Project Management Institute Proc., Boston.
Information & Authors
Information
Published In
Copyright
© 2004 ASCE.
History
Received: Apr 8, 2003
Accepted: Feb 24, 2004
Published online: Jan 1, 2005
Published in print: Jan 2005
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.