TECHNICAL PAPERS
Jul 15, 2004

Effective Practice Utilization Using Performance Prediction Software

Publication: Journal of Construction Engineering and Management
Volume 130, Issue 4

Abstract

A successful capital facility project requires effective usage of practices to satisfy the expected high level of project objectives. To provide an effective practice usage plan, the impacts of implementing practices need to be quantified and better methods or tools for practice usage plan and control are also required. Despite a number of efforts at quantifying the impact of practice usage, little interest has been shown in developing the tools and techniques for improved implementation of practice use. This paper develops performance prediction models for project cost and schedule performance using predictive discriminant function analysis (DFA). The models are integrated into an automated and practical software program named the DFA program that helps deliver effective and dynamic project planning. The DFA program has a user-friendly interface that project managers or field engineers can easily apply to their projects to predict cost and schedule performance and to allow for improvement where possible. An overall project performance improvement process using the DFA program application is provided.

Get full access to this article

View all available purchase options and get full access to this article.

References

Albanese, R. (1993). “Team building: Implications for the design/construction process.” Rep. Source Document 87 (Feb.), Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
Construction Industry Institute (CII). (1986). “Constructability: A primer.” Publication 3-1 (July), Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
Construction Industry Institute (CII). (1993). “Zero injury techniques.” Publication 32-1 (May), Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
Construction Industry Institute (CII). (1994). “Project change management.” Special Publication 43-1 (Nov.), Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
Construction Industry Institute (CII). (1999). “Benchmarking and metrics value of best practices report.” BMM99-3 (July), Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
Construction Industry Institute (CII). (2000). “Benchmarking and metrics data report for 2000.” BMM2000-2 (Aug.), Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
Gibson, G. E., and Hamilton, M. R. (1994). “Analysis of preproject planning effort and success variables for capital facility projects.” Rep. Source Document 105 (Nov.), to the Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
Huberty, C. J. (1994). Applied discriminant analysis, Wiley, New York.
Lee, S. (2001). “Discriminant function analysis for categorization of best practices.” PhD dissertation, Univ. of Texas at Austin, Austin, Tex.
Marhotra, N. K. (1996). Marketing research: An applied orientation, Prentice-Hall, Englewood Cliffs, N.J.
McKim, R., Hegazy, T., and Attalla, M.(2000). “Project performance control in reconstruction projects.” J. Constr. Eng. Manage., 126(2), 137–141.
Morrow, T. K. (1998). “Effects of selected practices on project cost performance.” PhD dissertation, Univ. of Texas at Austin, Austin, Tex.
Padilla, E. M., and Carr, R. I.(1991). “Resource strategies for dynamic project management.” J. Constr. Eng. Manage., 117(2), 279–293.
Ragsdale, C. T. (1998). Spreadsheet modeling and decision analysis, South-Western College Publishing, Cincinnati.
Rasdorf, W. J., and Abudayyeh, O. Y.(1991). “Cost and schedule control integration: Issues and needs.” J. Constr. Eng. Manage., 117(3), 486–502.
Sharma, S. (1996). Applied multivariate techniques, Wiley, New York.
Stevens, J. (1996). Applied multivariate statistics for the social sciences, Lawrence Erlbaum, Mahwah, N.J.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 130Issue 4August 2004
Pages: 576 - 585

History

Received: Jul 31, 2002
Accepted: May 6, 2003
Published online: Jul 15, 2004
Published in print: Aug 2004

Permissions

Request permissions for this article.

Authors

Affiliations

Sang-Hoon Lee
Assistant Professor, Dept. of Engineering Technology, Univ. of Houston, Houston, TX 77204-4020.
Stephen R. Thomas, M.ASCE
Associate Director, CII, Univ. of Texas at Austin, Austin, TX 78759-5316.
Richard L. Tucker, F.ASCE
Professor, Dept. of Civil Engineering, Univ. of Texas at Austin, Austin, TX 78712-1076.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share