TECHNICAL PAPERS
Mar 15, 2004

Risk Assessment Methodology for Underground Construction Projects

Publication: Journal of Construction Engineering and Management
Volume 130, Issue 2

Abstract

This paper presents a risk assessment methodology for underground construction projects. A formalized procedure and associated tools were developed to assess and manage the risks involved in underground construction. The suggested risk assessment procedure is composed of four steps of identifying, analyzing, evaluating, and managing the risks inherent in construction projects. The main tool of the proposed risk assessment methodology is the risk analysis software. The risk analysis software is built upon an uncertainty model based on fuzzy concept. The fuzzy-based uncertainty model is designed to consider the uncertainty range that represents the degree of uncertainties involved in both (1) probabilistic parameter estimates and (2) subjective judgments. Other tools developed in this study include the survey sheets for collecting risk-related information and the detail check sheets for risk identification and analysis. The paper finally discusses a detailed case study of the developed risk assessment methodology performed for a subway construction project in Korea.

Get full access to this article

View all available purchase options and get full access to this article.

References

Al-Bahar, J. F. (1988). “Risk management approach for construction projects: a systematic analytical approach for contractors.” PhD thesis, Univ. of California, Berkeley, Calif.
Ashley, D. B., and Avotes, I.(1984). “Influence diagramming for analysis of project risks.” Proj. Manage. J., XV(1), 56–62.
Ashley, D. B., and Bonner, J. J.(1987). “Political risks in international construction.” J. Constr. Eng. Manage., 113(3), 447–467.
Blockley, D. I. (1975). “Predicting the likelihood of structural accidents.” Proc., Institution of Civil Engineering, Part 2, Vol. 59, London, 659–668.
Blockley, D. I. (1980). The nature of structural design and safety, Wiley, New York.
Blockley, D. I.(1999). “Risk based structural safety methods in context.” J. Struct. Safety, 214, 335–348.
Brown, C. B.(1980). “The merging of fuzzy and crisp information.” J. Eng. Mech. Div., Am. Soc. Civ. Eng., 106(1), 123–133.
Cho, H. N., Choi, H. H., and Kim, Y. B.(2002). “A risk assessment methodology for incorporating uncertainties using fuzzy concepts.” Reliability Eng. Sys. Safety, 78, 173–183.
Cui, W., and Blockley, D. I.(1990). “Interval probability theory for evidential support.” Int. J. Intelligent Syst.,5, 183–192.
Dubois, D., and Prade, H.(1981). “Addition of interactive fuzzy numbers.” IEEE Trans. Autom. Control, 26(4), 926–936.
Featherman, W. D., and Walsh, T. A. (1997). “Cost risk analysis: applications for environmental restoration project management.” Proc., PMI 28th Annual Seminars and Symposium, 351–357.
Fujino, T. (1994). “The development of a method for investigation construction site accidents using fuzzy fault tree analysis.” PhD thesis, The Ohio State Univ., Columbus, Ohio.
Hadipriono, F. C., Lim, C. L., and Wong, K. H.(1986). “Event tree analysis to prevent failures in temporary structures.” J. Constr. Eng. Manage., 112(4), 500–513.
Hall, J. W., Davis, J. P., and Blockley, D. I.(1998). “Uncertain inference using interval probability theory.” Int. J. Approximate Reasoning, 19(3–4), 247–264.
Huang, D., Chen, T., and Wang, M.-J. J.(2001). “A fuzzy set approach for event tree analysis.” Fuzzy Sets Syst., 118, 153–165.
Nishijima, K. (1993). “Safety management.” Chung-Ang Labor Accidents Prevention Association.
Rasmussen, B. E., and Skogen, S. (1994). “Project modeling and stochastic simulation—managing project risks.” Proc., 12th Internet World Congress on Project Management, Vol. 2, 377–388.
Seoul Metropolitan Government. (1997). Safety management manual of subway construction Projects I, II, III, Seoul, Korea (in Korean).
Seoul Metropolitan Subway Corporation. (1998). Occupational Accidents Rep. in Subway Construction, Seoul, Korea (in Korean).
Watson, T. S. R., Weiss, J. J., and Donnell, M. L.(1979). “Fuzzy decision analysis.” IEEE Trans. Syst. Man Cybern., 9(1), 1–9.
Yao, J. T. P.(1980). “Damage assessment of existing structures.” J. Eng. Mech. Div., Am. Soc. Civ. Eng., 106(4), 785–799.
Zadeh, L. A.(1965). “Fuzzy sets.” Inf. Control., 8, 338–353.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 130Issue 2April 2004
Pages: 258 - 272

History

Received: Jun 20, 2002
Accepted: Dec 17, 2002
Published online: Mar 15, 2004
Published in print: Apr 2004

Permissions

Request permissions for this article.

Authors

Affiliations

Hyun-Ho Choi
Research Assistant, Dept. of Civil and Environmental Engineering, Hanyang Univ. 1271, Sa-1 Dong, Ansan, Kyungki 425-791, Korea (corresponding author).
Hyo-Nam Cho
Professor, Dept. of Civil and Environmental Engineering, Hanyang Univ. 1271, Sa-1 Dong, Ansan, Kyungki 425-791, Korea.
J. W. Seo
Professor, Dept. of Civil Engineering, Hanyang Univ., Seoul, Korea.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share