Critical Success Factors for Value Management Studies in Construction
Publication: Journal of Construction Engineering and Management
Volume 129, Issue 5
Abstract
Value management (VM) studies often face pressure caused by limited time and resources. The identification of key factors for value management success enables appropriate allocation of the limited time and resources in order to achieve better output. Most of the related past work only identified critical success factors for value management studies in general. This paper seeks to distinguish these factors according to their degrees of importance in relation to success. A questionnaire survey was conducted to gather views from experts with experience in value management practice. The findings of the survey reveal the relative importance of the nominated success factors. Two factors that had not been highlighted by previous research are identified as having a significant influence on the success of VM studies. In order to explore the underlying construction among the identified critical success factors (CSFs), factor analysis was adopted to investigate the cluster of the relationship. The results indicate that the success of VM studies requires a combined effort from all parties involved.
Get full access to this article
View all available purchase options and get full access to this article.
References
Bartholomew, D. J., and Knott, M. (1999). Latent variable models and factor analysis, Oxford University Press, London.
Barton, R. T.(2000). “Soft value management methodology for use in project initiation: a learning journey.” J. Constr. Res., 1(2), 109–123.
Chan, D. W. M., and Kumaraswamy, M. M.(1997). “A comparative study of causes of time overruns in Hong Kong construction projects.” Int. J. Proj. Manage., 15(1), 55–63.
Chua, D. K. H., Kog, Y. C., and Loh, P. K.(1999). “Critical success factors for different project objectives.” J. Constr. Eng. Manage., 125(3), 142–150.
Dell’Isola, A. J. (1982). Value engineering in the construction industry, 3rd Ed., Van Nostrand Reinhold, New York.
Dell’Isola, A. J. (1997). Value engineering practical application: for design, construction, maintenance, and operations, R. S. Means, Kingston, Mass.
Ferry, D., and Brandon, P. (1984). Cost planning of buildings, Granada, London.
Green, S. D.(1994). “Beyond value engineering: smart value management for building projects.” Int. J. Proj. Manage., 12(1), 49–56.
Institution of Civil Engineers. (1996). ICE design and practice guide: Creating value in engineering, Thomas Telford, London.
Jaselskis, E. J., and Ashley, D. B.(1991). “Optimal allocation of project management resources for achieving success.” J. Constr. Eng. Manage., 117(2), 321–340.
Johnson, D. E. (1998). Applied multivariate methods for data analysts, Duxbury, Belmont, Calif.
Joint Technical Committee OB/6. (1994). “Australian/New Zealand standard: value management.” AS/NZS 4183:1994, Australian Standards/New Zealand Standards, Canberra, Australia.
Kaming, P. F., Olomolaiye, P. O., and Holt, G. D.(1997). “Harris FC: factors influencing construction time and cost overruns on high-rise projects in Indonesia.” Constr. Manage. Econom., 15(2), 83–94.
Kelly, J., and Male, S. (1993). Value management in design and construc-tion: The economic management of projects, E & FN Spon, London.
Kelly, J., and Male, S. (2001). “A quick approach to task fast diagrams.” SAVE Int. Conf. Proc., SAVE International, Dayton, Ohio, 219–228.
Male, S., Kelly, J., Fernie, S., Gronqvist, M., and Bowles, G. (1998). Value management benchmark: A good practice framework for clients and practitioners, Thomas Telford, London.
Maurer, J. H. (1996). “Key factors in starting and maintaining a VA/VE continuous improvement program.” SAVE Int. Conf. Proc., SAVE International, Berkeley, Calif., 147–152.
Miles, L. D. (1989). Techniques of value analysis and engineering, Eleanor Miles Walker, Northbrook, Ill.
Mootanah, D. P.(2000). “Theory meets practice: proposal for a dynamic value and risk methodology for project management.” J. Constr. Res., 1(2), 131–138.
Norton, B. R., and McElligot, C. W. (1995). Value management in construction: A practical guide, Macmillan, Basingstoke, U.K.
Norusis, M. J. (2000). SPSS 10.0 guide to data analysis, Prentice Hall, Englewood Cliffs, N.J.
Palmer, A., Kelly, J., and Male, S.(1996). “Holistic appraisal of value engineering in construction in United States.” J. Constr. Eng. Manage., 122(4), 324–328.
Romani, P. N. (1975). “The Department of Defense value engineering change proposal program.” PhD thesis, George Washington University, Washington, D.C.
Sanvido, V., Parfitt, K., Guveris, M., and Coyle, M.(1992). “Critical success factors for construction projects.” J. Constr. Eng. Manage., 118(1), 94–111.
SAVE International. (2001). “Value methodology standard.” 〈http://www.value-eng.org/manuals/vmstd.pdf〉.
Shen, Q. P. (1997). “Value management in Hong Kong’s construction industry: lessons learned.” SAVE Int. Conf. Proc., SAVE International, Dayton, Ohio, 260–265.
SPSS, Inc. (2000). SPSS 10.0 for Windows brief guide. Prentice-Hall, Englewood Cliffs, N.J.
Woodhead, R.(2000). “From individual perspectives to a global VM potential.” J. Constr. Res., 1(2), 87–90.
Zimmerman, L. W., and Hart, G. D. (1982). Value engineering: A practical approach for owners, designers, and contractors, Van Nostrand Reinhold, New York.
Information & Authors
Information
Published In
Copyright
Copyright © 2003 American Society of Civil Engineers.
History
Received: Nov 14, 2001
Accepted: Aug 22, 2002
Published online: Sep 15, 2003
Published in print: Oct 2003
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.