Estimating Future Highway Construction Costs
Publication: Journal of Construction Engineering and Management
Volume 129, Issue 3
Abstract
The objective of this research was to develop a model that estimates future highway construction costs in Louisiana. The model describes overall highway construction cost in terms of a highway construction cost index. The index is a composite measure of the cost of construction labor, materials, and equipment; the characteristics of contracts; and the environment in which contracts are let. Future construction costs are described in terms of predicted index values based on forecasts of the price of construction labor, materials, and equipment and the expected contract characteristics and contract environments. The contract characteristics and contract environments that are under the control of highway agency officials, can be manipulated to reflect future cost-cutting policies. Application of the model in forecasting to highway construction costs in Louisiana shows that the model closely replicates past construction costs for the period 1984–1997. When applied to forecasting future highway construction costs, the model predicts that highway construction costs in Louisiana will double between 1998 and 2015. Applying cost-cutting policies and assuming input costs are 20% less than anticipated, the model estimates highway construction costs will increase by 75% between 1998 and 2015.
Get full access to this article
View all available purchase options and get full access to this article.
References
Elhag, T. M. S., and Boussebaine, A. H. (1998). “Factors affecting cost and duration of construction projects.” EPSRC Research Rep. Phase (1), School of Architecture and Building Engineering, Univ. of Liverpool, Liverpool, U.K.
Fayek, A.(1998). “Competitive bidding strategy model and software system for bid preparation.” J. Constr. Eng. Manage., 124(1), 1–10.
Hartgen, D. T., Bowman, V. B., and Horner, M. W. (1997). “Baseline market forecasts for state highway construction engineering, maintenance and administration programs 1997–2001.” Transportation Publication Number 151, Center for Interdisciplinary Transportation Studies, Univ. of North Carolina, Charlotte, N.C.
Hartgen, D. T., and Talvitie, A. P. (1995). “Comparative performance of transportation systems: Pitfalls and prospects.” Proc., World Conf. on Transit Research, Sydney, Australia.
Hegazy, T., and Ayed, A.(1998). “Neural network model for parametric cost estimation of highway projects.” J. Constr. Eng. Manage., 124(3), 210–218.
Herbsman, Z. (1986). “Model for forecasting highway construction cost.” Transportation Research Record 1056, Transportation Research Board, Washington, D.C., 47–54.
Koehn, E., Fallon, B., Seling, F., and Young, R.(1978). “Cost of delays in construction.” J. Constr. Div., Am. Soc. Civ. Eng., 104(3), 323–331.
Koppula, S. D.(1981). “Forecasting engineering costs: two case studies.” J. Constr. Div., Am. Soc. Civ. Eng., 107(4), 733–743.
Olson, R. M., and Epps, J. A. (1981). “Construction cost trend.” Research Rep. 214–29, Texas A&M Univ., College Station, Tex.
Pindyck, R. S., and Rubinfeld, D. L. (1981). Econometric models and economic forecasts, 2nd Ed., McGraw-Hill, New York.
Stevens, J. D. (1995). “Cost estimating and forecasting for highway work in Kentucky.” Research Rep. KTC 95-12, Kentucky Transportation Center, University of Kentucky, Lexington, Ky.
Information & Authors
Information
Published In
Copyright
Copyright © 2003 American Society of Civil Engineers.
History
Received: Jan 25, 2001
Accepted: May 21, 2002
Published online: May 15, 2003
Published in print: Jun 2003
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.