TECHNICAL PAPERS
May 15, 2003

Bridge Falsework Productivity—Measurement and Influences

Publication: Journal of Construction Engineering and Management
Volume 129, Issue 3

Abstract

One principal element of the construction cost of a cast-in-place prestressed box girder concrete bridge is the erection of falsework. This paper presents the results of the analysis of labor-hours and quantity of work in erecting the falsework for 20 such bridges. Analysis of the bridge data has shown that the best productivity for falsework erection occurs when constructing a low structure on relatively flat ground. Location and design factors such as steep slopes, traffic openings, and tall structures, as well as such construction techniques as the use of cranes or lifts and the type of bent material selected, can reduce falsework erection productivity (measured through installation data for setting of pads, constructing bents, setting stringers, and rolling out the soffit) by over 50%. A belief network diagram was constructed to show graphically the falsework erection productivity influences identified through a study of the 20 bridges. With the collection of additional data, the belief network can be used to calculate a total falsework erection productivity value based on dozens of combinations of influencing factors.

Get full access to this article

View all available purchase options and get full access to this article.

References

Ashley, D. B., and Perng, Y. H. (1987). “An intelligent construction risk identification system.” Proc., 6th Int. Symp. on Offshore Mechanics and Arctic Engineering, ASCE, New York.
California Dept. of Transportation (Caltrans). Standard specifications, (1995). Sections 51-1.06B, 51-11–51-12.
Diekman, J. E., et al. (1996). “Project cost risk analysis using influence diagrams.” Proj. Manage. J., XXVII(4).
Hampson, K., and Fischer, M.(1997). “Structural designs and construction technologies for California highway bridges.” J. Constr. Eng. Manage., 123(3), 269–275.
Jeljeli, M. N., and Russell, J. S.(1995). “Coping with uncertainty in environmental construction: Decision-analysis approach.” J. Constr. Eng. Manage., 121(4), 370–380.
Kuprenas, J. A. (1988). “Use of influence diagrams to assess the cost and schedule impact of construction changes.” Technical Rep. No. 14, Dept. of Civil Engineering, Construction Engineering and Management, Univ. of California, Berkeley, Calif.
Laufer, A., and Cohenca, D.(1990). “Factors affecting construction-planning outcomes.” J. Constr. Eng. Manage., 116(1), 135–156.
McCabe, B. (1998). “Belief networks a probabilistic knowledge-base.” 1st Int. Conf. on New Information Technologies for Decision Making in Civil Engineering.
Olmsted, S. M. (1983). “On representing and solving decision problems.” PhD thesis, Stanford Univ., Stanford, Calif.
Spetzler, C. S., and Zamora, R. M. (1984). “Decision analysis of a facilities investment and expansion problem.” The principles and applications of decision analysis, Vol. I: General Collection, Strategic Decisions Group, Menlo Park, Calif.
Thomas, H. R., Maloney, W. F., Horner, R. M. W., Smith, G. R., Handa, V. K., and Sanders, S. R.(1990). “Modeling construction labor productivity.” J. Constr. Eng. Manage., 116(4), 705–726.
Thomas, H R., and Sanvido, V. E.(2000). “Role of the fabricator in labor productivity.” J. Constr. Eng. Manage., 126(5), 358–365.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 129Issue 3June 2003
Pages: 243 - 250

History

Received: Aug 10, 2001
Accepted: Apr 9, 2002
Published online: May 15, 2003
Published in print: Jun 2003

Permissions

Request permissions for this article.

Authors

Affiliations

Thomas E. Tischer, P.E., M.ASCE
Project Engineer, HBG Constructors, Inc., 10090 I-25 Frontage Rd., Longmont, CO 80504.
John A. Kuprenas, P.E., M.ASCE
Project Director, Vanir Construction Management, 3435 Wilshire Blvd., Los Angeles, CA 90014; Assistant Research Professor, Dept. of Civil Engineering, Univ. of Southern California, Los Angeles, CA 90089-2531.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share