Is Construction Labor Productivity Really Declining?
This article has a reply.
VIEW THE REPLYThis article has a reply.
VIEW THE REPLYPublication: Journal of Construction Engineering and Management
Volume 129, Issue 1
Abstract
Macroeconomics data suggest that labor productivity declined significantly in the construction industry during the 1979–1998 period. However, microeconomic studies indicate the contrary. This paper critically examines the construction labor productivity macroeconomic data in the United States from 1979 to 1998 to determine their validity and reliability. Data collection, distribution, manipulation, analysis, and interpretation are reviewed and problems are identified. The paper also presents a comparison of construction and manufacturing labor productivity during this period. The main conclusion of the study is that the raw data used to calculate construction productivity values at the macroeconomic level and their further manipulation and interpretation present so many problems that the results should be deemed unreliable. The uncertainty generated in the process of computing these values is such that it cannot be determined if labor productivity has actually increased, decreased, or remained constant in the construction industry for the 1979–1998 period.
Get full access to this article
View all available purchase options and get full access to this article.
References
Allen, S.(1985). “Why construction industry productivity is declining.” Rev. Econ. Stat., 67(4), 661–669.
Allen, S.(1989). “Why construction industry productivity is declining: Reply.” Rev. Econ. Stat., 71(3), 547–549.
Allmon, E., Hass, C. T., Borcherding, J. D., and Goodrum, P. M.(2000). “U.S. construction labor productivity trends, 1970–1998.” J. Constr. Eng. Manage., 126(2), 97–104.
Arditi, D.(1985). “Construction productivity improvement.” J. Constr. Eng. Manage., 111(1), 1–14.
Christian, J., and Hachey, D.(1995). “Effects of delay times on production rates in construction.” J. Constr. Eng. Manage., 121(1), 20–26.
CICE: The next five years and beyond. (1988). Business Round Table, New York.
Dean, E.(1999). “The accuracy of the BLS productivity measures.” Monthly Labor Rev., February, 24–34.
Pieper, P.(1989). “Why construction industry productivity is declining: Comment.” Rev. Econ. Stat., 71(3), 543–546.
“Productivity in civil engineering and construction.” (1983). Civ. Eng., 53(2), 60–63.
Tucker, R. L.(1986). “Management of construction productivity.” J. Manage. Eng., 2(3), 148–156.
U.S. Census Bureau. (2000). Value of construction put in place, U.S. Department of Commerce, Washington, D.C.
Information & Authors
Information
Published In
Copyright
Copyright © 2003 American Society of Civil Engineers.
History
Received: Nov 13, 2001
Accepted: Jan 29, 2002
Published online: Jan 15, 2003
Published in print: Feb 2003
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.