TECHNICAL PAPERS
Sep 1, 1996

An Interactive Planning Environment for Critical Operations

Publication: Journal of Construction Engineering and Management
Volume 122, Issue 3

Abstract

In this paper, an interactive critical operations planning environment (COPE) is described for planning critical construction operations involving large semistationary equipment such as cranes, concrete pumps, and manipulators. Careful planning is necessary for the use of semistationary equipment; however, formal planning methods and tools are limited. Planning is typically the responsibility of a small pool of experts whose knowledge is largely undocumented. Automating and formalizing aspects of the planning process can improve the productivity and effectiveness of expert or nonexpert critical operations planners. The proposed planning environment uses computer-aided drafting tools and a set of computerized planning primitives to facilitate a very visual planning process. The planning principles implemented include human-computer interaction, constraint enforcement, and performance measurement. Implementation details and initial research results are presented in this paper, which follows previous work. With the developed planning environment and process, a significant amount of planning time can be saved so that more alternatives can be evaluated. A better plan can be determined through comparison of more alternatives. The structured planning process also allows planners to perform more detailed analyses on planning problems. Better decisions can thus be made based on the analyses.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Beliveau, Y. B., Dixit, S. S., Dal, T., and Morad, A. A.(1992). “Multi-task motion planning (MTMP) for material handling in construction.”J. Constr. Engrg. and Mgmt., ASCE, 119(1), 180–191.
2.
Benckert, I. H. (1991). “Computer controlled concrete distribution.”Proc., 8th Int. Symp. on Automation and Robotics in Constr., Fraunhofer-Institute for Manufacturing, Engrg., and Automation, Stuttgart, Germany.
3.
Bennett, C., and Ditlinger, S. (1994). “Bechtel automated lift planning system.”Robotics for challenging environments, ASCE, New York, N.Y.
4.
C. A. R.: Computer aided rigging manual. (1990). Brown & Root Braun, Houston, Tex.
5.
Chalabi, F., and Yandow, C. (1989). “Crane, an expert system for optimal tower crane selection and placement.”Proc., Constr. Congr. I, ASCE, New York, N.Y., 290–297.
6.
Chen, L. (1994). “Automated path finding for crane lifts,” Master's Rep., Univ. of Texas, Austin, Tex.
7.
“Concrete today: concrete re-invents government center.” (1995). ENR, 234(18), 48.
8.
Craig, J. J. (1986). Introduction to robotics. Addison-Wesley Publishing Co., Reading, Mass.
9.
Furusaka, S., and Gray, C.(1984). “A model for the selection of the optimum crane for construction sites.”Constr. Mgmt. and Economics, 2, 157–176.
10.
Gatlin, C. E. Jr. (1989). “Benefits of 3D CAD in the construction of power plants.”Proc., 1st Int. Conf. Fossil Plant Constr., A. Armor, ed., Electric Power Res. Inst., Palo Alto, Calif.
11.
Gray, C., and Little, J.(1985). “A systematic approach to the selection of an appropriate crane for a construction site.”Constr. Mgmt. and Economics, 3, 121–144.
12.
Haas, C. T., Dailey, C., Greer, R., Kim, Y. S., and Thomas, G. (1995). “Feasibility study of alternative clinker clearing solutions.”Rep. Draft Prepared for Electrical Power Res. Inst., (EPRI), EPRI, Palo Alto, Calif.
13.
Hsieh, T.-Y., and Haas, C. T. (1993). “Performance evaluation model for construction manipulators.”Automation and robotics in construction X, G. H. Watson, R. L. Tucker, and J. K. Walters, eds., Elsevier, New York, N.Y., 301–308.
14.
Hornaday, W. C. (1992). “Computer aided planning for construction heavy lifts,” Master's thesis, University of Texas, Austin, Tex.
15.
Hornaday, W. C., Haas, C. T., O'Connor, J. T., and Wen, J.(1993). “Computer-aided planning for heavy lifts.”J. Constr. Engrg. and Mgmt., ASCE, 119(3), 498–515.
16.
Kunigahalli, R., and Russell, J. S. (1994). “Visibility graph approach to detailed path planning in CNC concrete placement.”Automation and robotics in construction XI, D. A. Chamberlain, ed., Elsevier, New York, N.Y., 141–148.
17.
Lin, K.-L. (1995). “A model for spatial planning of critical construction operations using large semi-stationary equipment,” PhD dissertation, Dept. of Civ. Engrg., Univ. of Texas, Austin, Tex.
18.
Mahoney, J. J., and Tatum, C. B.(1994). “Construction site applications of CAD.”J. Constr. Engrg. Mgmt., ASCE, 120(3), 617–631.
19.
Nelco Manufacturing. (1993). “Porta shot blast: H-D-VE-100.”Product literature, Oklahoma City, Okla.
20.
Reinschmidt, K. F., and Zabilski, R. J. (1989). “Application of computer graphics in construction.”Proc., Constr. Congr. I-Excellence in Constr. Proj., ASCE, New York, N.Y., 137–142.
21.
Sandroid System. (1993). “The sandroid system.”Product literature, Boynton Beach, Fla.
22.
Shapiro, H. I., Shapiro, J. P., and Shapiro, L. K. (1991). Crane and derricks, 2nd Ed., McGraw-Hill Book Co., Inc., New York, N.Y.
23.
Varghese, K., and O'Connor, J. T.(1995). “Routing large vehicles on industrial construction site.”J. Constr. Engrg. and Mgmt., ASCE, 121(1), 1–12.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 122Issue 3September 1996
Pages: 212 - 222

History

Published online: Sep 1, 1996
Published in print: Sep 1996

Permissions

Request permissions for this article.

Authors

Affiliations

Kuo-Liang Lin, Student Member, ASCE
Res. Asst., Dept. of Civ. Engrg., 5.2 ECJ, Univ. of Texas, Austin, TX 78712.
Carl T. Haas, Member, ASCE
Prof., Dept. of Civ. Engrg., 5.2 ECJ, Univ. of Texas, Austin, TX.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share