TECHNICAL PAPERS
Mar 1, 1996

New Approach for Optimization of Overall Construction Schedule

Publication: Journal of Construction Engineering and Management
Volume 122, Issue 1

Abstract

This paper is concerned with one of the most important tasks in construction management—scheduling of construction project—and shows how to optimize the overall construction schedule. The current optimization methods seem to provide very little support for construction project managers, as the managers require a schedule based on the simultaneous considerations of several factors, such as investment allocation, total cost, resource supply, and weather. With a view of systematization, the paper first quantitatively analyzes the factors that influence the overall construction schedule. It then indicates that the optimization of overall construction schedule must be closely combined with the investment allocation, resource supply, and weather. The relationships between these factors are analyzed, and their mathematical submodels are established. Based on these submodels, a mathematical model is then established with the objective of the best economic benefit (the lowest construction cost). Finally, the solution of this model is provided, a computer program is developed to solve this model, and an example is taken to show the procedures of solution.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Koehn, E., and Brown, J.(1985). “Climatic effects on construction.”J. Constr. Engrg. and Mgmt., ASCE, 111(2), 129–137.
2.
Ling, Z. (1990). Construction organisation . Shanghai Tongji University Publishing Housing, Shanghai, China (in Chinese).
3.
Lock, D. (1992). Project management . 5th Ed., Gower Publishing Co. Ltd., Aldershot, England.
4.
Oberlender, G. D. (1993). Project management for engineering and construction . McGraw-Hill, Inc., New York, N.Y.
5.
O'Brien, J. J. (1993). CPM in construction management . 4th Ed., McGraw-Hill, Inc., New York, N.Y.
6.
Ying, J., and Li, S. (1993). Schedule control for construction project . DIZHENG Publishing House, Chongqing, China (in Chinese).

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 122Issue 1March 1996
Pages: 7 - 13

History

Published online: Mar 1, 1996
Published in print: Mar 1996

Permissions

Request permissions for this article.

Authors

Affiliations

Shirong Li
Res. Fellow, Dept. of Constr. Mgmt. and Engrg., Univ. of Reading, Whiteknights, P.O. Box 219, Reading, RG6 2AW, United Kingdom.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share