Expert knowledge and lessons learned in the construction phase of a project are not systematically incorporated into the design and construction phases of subsequent projects. The advancement of construction since ancient times has been predicated on the communication of lessons learned. Although past efforts have focused on the design phase, opportunities for the collection and utilization of lessons learned exist in all phases of a project life cycle. Constructability, the early integration of construction knowledge into all phases of a project, can be improved by effective use of lessons learned. This paper identifies feedback channels in a project life cycle and describes previous and current efforts to develop lessons-learned systems. Next, the paper describes the design and implementation of a constructability feedback prototype called interactive knowledge-intensive system (IKIS) for constructability improvement (IKIS-Constructability). Finally, the paper highlights the operation of this system and its potential benefits.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
AEPIC—architecture and engineering performance notes. (1988). J. Loss, ed., 4(1–5), AEPIC, Univ. of Maryland, College Park, Md.
2.
Antelman, A. (1991). “Improving NAVFAC's total quality management of construction drawings with CLIPS.”Proc., 2nd CLIPS Conf.; Vol. 2, Nat. Aeronautics and Space Admin., Washington, D.C., 357–364.
3.
ASCE Committee on Construction Management.(1991). “Constructability and constructability programs: white paper.”J. Constr. Engrg. and Mgmt., 117(1), 67–89.
4.
Banerjee, J., Kim, W., Chou, H., and Garza, J. (1988). “Operations and implementations of complex objects,”Proc., Data Engrg. Conf.
5.
Bowen, P. A., and Erwin, G. J. (1990). “The impact of second generation expert systems on building design evaluation.”Proc., Int. Symp. on Build. Economics and Constr. Mgmt., CIB, Sydney, Australia, 419–427.
6.
“Can your design be built?” (1986). Civ. Engrg., ASCE, 56(1), 49–51.
7.
Carper, K. L.(1987). “Failure information: dissemination strategies.”J. Perf. Constr. Fac., ASCE, 1(1), 1–10.
8.
Committee on Failures and Accidents to Large Dams of the United States Committee on Large Dams, and ASCE. (1975). “Lessons from dam incidents.” ASCE, New York, N.Y.
9.
“Constructability: a primer.” (1986). Publ. 3-1, Constr. Industry Inst. (CII), Austin, Tex.
10.
“Constructability concepts file.” (1987). Publ. 3-3, Constr. Industry Inst. (CII), Austin, Tex.
11.
Construction Specifications Institute (CSI). (1983). MASTERFORMAT —master list of section titles and numbers, Alexandria, Va.
12.
Eck, R. W.(1987). “Center for excellence in construction safety.”J. Perf. Constr. Fac., ASCE, 1(3), 122–130.
13.
Fischer, M. (1991). “Constructibility improvement for the preliminary design of reinforced concrete structures,” PhD thesis, Dept. of Civ. Engrg., Stanford Univ., Stanford, Calif.
14.
“Guidelines for implementing a constructability program.” (1987). Publ. 3-2, Constr. Industry Inst. (CII), Austin, Tex.
15.
Hydraulic Structures Committee of the Hydraulic Division, ASCE, (1986). “Lessons learned from design, construction, and performance of hydraulic structures.” New York, N.Y.
16.
Ivancevich, Donnelly, and Gibson. (1989). Management principles and functions, 4th Ed., Richard D. Irwin, Inc.
17.
Kagan, H. A.(1985). “How designers can avoid construction claims.”J. Profl. Issues Engrg. Education and Practice, ASCE, 111(3), 100–106.
18.
Kavanagh, T. C., Muller, F., and O'Brien, J. J. (1978). Construction management —a professional approach. McGraw-Hill Book Co., Inc., New York, N.Y.
19.
Kim, W., Banerjee, J., Chou, H., and Garza, J.(1990). “Object oriented database support for CAD.”Comp. Aided Des., 22(8), 469–478.
20.
Kirby, J. G. et al. (1991). “Concept development of an automated construction design review advisor.”USACERL Interim Rep. P-91/13, Constr. Engrg. Res. Lab., U.S. Army Corps of Engrs., Champaign, Ill.
21.
Ledbetter, W. B., Davis, K., and Burati, J. L. Jr.(1989). “Measuring design and construction quality costs.”J. Constr. Engrg. and Mgmt., ASCE, 115(3), 385–400.
22.
Loss, J.(1987). “AEPIC project: update.”J. Perf. Constr. Fac., ASCE, 1(1), 11–29.
23.
More construction for the money. (1983). Business Roundtable, New York, N.Y.
24.
Nelson, M. C., and Diekmann, J. E.(1985). “Construction claims: frequency and severity.”J. Constr. Engrg. and Mgmt., ASCE, 111(1), 74–81.
25.
Nigro, W. T. (1984). “REDICHECK: a system of interdisciplinary coordination.”DPIC Communique, 11(6).
26.
O'Connor, J. T., and Davis, V. S. (1988). “Constructability improvement during field operations.”Rep., Constr. Industry Inst. (CII), Univ. of Texas at Austin, Tex.
27.
O'Connor, J. T., Rusch, S. E., and Schulz, M. J.(1987). “Constructability concepts for engineering and procurement.”J. Constr. Engrg. Mgmt., ASCE, 113(2), 235–248.
28.
Paulson, B. C. Jr.(1976). “Designing to reduce construction costs.”J. Constr. Engrg. Mgmt., ASCE, 102(4), 587–592.
29.
Plockmeyer, D. R. (1988). “Building performance analysis, the missing element in project management,” MSc thesis, Univ. of Maryland, College Park, Md.
30.
Tatum, C. B.(1987). “Improving constructibility during conceptual planning,”J. Constr. Engrg. Mgmt., ASCE, 113(2), 191–207.
31.
Vannoy, D. W. (1983). “20/20 hindsight with the aid of a computer.”Proc., Conf. on Constr. Failures: Legal and Engrg. Perspectives, ASCE, New York, N.Y.
32.
Yachnis, M. (1985). Lessons learned from design & engineering of naval facilities; NAVFAC P-1010, Naval Fac. Engrg. Command, Alexandria, Va.
Information & Authors
Information
Published In
Copyright
Copyright © 1996 American Society of Civil Engineers.
History
Published online: Mar 1, 1996
Published in print: Mar 1996
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.