Knowledge-Based System for Construction Planning of High-Rise Buildings
Publication: Journal of Construction Engineering and Management
Volume 121, Issue 2
Abstract
The knowledge-based expert system for construction planning is part of an automated building realization process. The system uses an object-oriented representation of the building and production rules, routines, and functions to manipulate objects and to generate the construction plan. The building is represented by its zones, functional systems, and works. The procedural knowledge employs rules for the generation of activities and their dependences. The algorithms are employed to allocate resources and to generate the construction schedule. The algorithms reflect the different objectives of managerial decision making, such as least cost, managerial efficiency, or fastest completion. This paper presents the principles of the system, explains the structure of its knowledge base, and discusses various implementation aspects. It also includes an example of the application.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Al Shawi, M., Jaggar, M. D., and Brandon, P. S. (1990). “An expert system to assist in generation and scheduling of construction activities.”Proc., CIB 90, Build. Economics and Constr. Mgmt., Vol. 2, 375–384.
2.
Arditi, D., and Abulak, Z.(1986). “Line of balance scheduling in pavement construction.”J. Constr. Engrg. and Mgmt., ASCE, 112(3), 411–422.
3.
Darwich, A, Levitt, R. E., and Hayes-Roth, B.(1990). “OAR PLAN generating projects plans by reasoning about objects, action and resources.”Artificial Intelligence in Engrg. Des. and Manufacturing, 2(3), 169–181.
4.
De La Garza, J., and Ibbs, C. W. (1988). “A knowledge engineering approach to the analysis and evaluation of schedules for mid-rise buildings.”Tech. Rep. 23, Univ. of Illinois, Urbana, Ill.
5.
De La Garza, J., and Ibbs, C. W.(1990). “Knowledge elicitation study in construction scheduling domain.”J. Computing in Civ. Engrg., ASCE, 4(2), 135–154.
6.
Echeverry, D., Ibbs, C. W., and Kim, S.(1992). “Sequencing knowledge for construction scheduling.”J. Constr. Engrg. and Mgmt., ASCE, 117(1), 118–130.
7.
Kakhonen, K., and Lariba, P. (1990). “A computer program for generating and managing schedules for construction projects.”Proc., 7th Int. Symp. on Automation and Robotics in Constr., Bristol Polytechnic, Bristol, England, 311–312.
8.
Levitt, R. E., Kartam, N. A., and Kuntz, J. C.(1988). “Artificial intelligence techniques for generation of construction plans.”J. Constr. Engrg. and Mgmt., ASCE, 114(3), 329–343.
9.
Monograph on planning and environmental criteria for tall buildings. (1981). Van Nostrand Reinhold, New York, N.Y.
10.
Monograph on tall buildings and concepts. (1980). Van Nostrand Reinhold, New York, N.Y.
11.
Moselhi, O., and Nicholas, M. J. (1990). “Expert system for construction planning and scheduling.”Proc., 7th Int. Symp. on Automation and Robotics in Constr., Bristol Polytechnic, Bristol, England, 319–325.
12.
Navinchandra, D., Sriram, D., and Logcher, R. D.(1988). “GHOST: project network generator.”J. Computing in Civ. Engrg., ASCE, 2(3), 239–254.
13.
Peer, S.(1974). “Network analysis and construction planning.”J. Constr. Div., ASCE, 100(3), 203–210.
14.
Reda, R. M.(1990). “RPM: repetitive project modeling.”J. Constr. Engrg. and Mgmt., ASCE, 116(2), 316–330.
15.
Selinger, S.(1980). “Construction planning for linear projects.”J. Constr. Div., ASCE, 106(2), 195–205.
16.
Shaked, O., and Warszawski, A.(1992). “CONSCHED: expert system for scheduling of modular construction projects.”J. Constr. Engrg. and Mgmt., ASCE, 118(3), 488–506.
17.
Warszawski, A. (1990). Industrialization and robotics in building. Harper & Row, Publishers Inc., New York, N.Y.
18.
Zozaya, G., and Hendrickson, C. (1988). “Knowledge based planning for construction projects.”Rep. No. R-88-170, Carnegie Mellon Univ., Pittsburgh, Pa.
Information & Authors
Information
Published In
Copyright
Copyright © 1995 American Society of Civil Engineers.
History
Published online: Jun 1, 1995
Published in print: Jun 1995
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.