TECHNICAL PAPERS
Mar 1, 1994

Automated Corrective Action Selection Assistant

Publication: Journal of Construction Engineering and Management
Volume 120, Issue 1

Abstract

Automated daily site reporting coupled with computerized data interpretation as an integral part of a project management system has the potential to be the missing link for effective construction project monitoring and control. This paper describes a schema to perform the automated interpretation of daily site records, to identify activities experiencing difficulties, to identify the source(s) of these difficulties, to identify the types of problems resulting, to find corroborating information from the daily site records, to validate the causes of these problems, and to suggest likely corrective actions. A framework is presented wherein each component of the analysis schema is defined. This framework includes a set of user‐assigned activity‐interpretation attributes, a set of problem sources, and a set of corrective actions. Expert rules are used to link these components, and fuzzy logic is used to define the imprecise relationships that exist between them. A prototype system has been developed to implement and test the schema (to be presented in a companion paper).

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Al‐Tabtabai, H. M. (1989). “PROCON: a knowledge‐based approach to construction project control,” PhD thesis, Univ. of Colorado, Boulder, Colo.
2.
Ayyub, B. M., and Haldar, A. (1984). “Project scheduling using fuzzy set concepts.” J. Constr. Engrg. and Mgmt., ASCE, 110(2), 189–204.
3.
Burati, J. L. Jr., Farrington, J. J., and Ledbetter, W. B. (1992). “Causes of quality deviations in design and construction.” J. Constr. Engrg. and Mgmt., ASCE, 118(1), 34–49.
4.
Chang, T. C., Ibbs, C. W., and Crandall, K. C. (1990). “Network resource allocation with support of a fuzzy expert system.” J. Constr. Engrg. and Mgmt., ASCE, 116(2), 239–260.
5.
Diekmann, J. E., and Al‐Tabtabai, H. (1992). “Knowledge‐based approach to construction project control.” Int. J. Proj. Mgmt., 10(1), 23–30.
6.
Eldin, N. N., and Eggar, S. (1990). “Productivity improvement tool: camcorders.” J. Constr. Engrg. and Mgmt., ASCE, 116(1), 100–111.
7.
Grivas, D. A., and Shen, Y. (1991). “A fuzzy set approach for pavement damage assessments.” Civ. Engrg. Systems, 8(1), 37–47.
8.
Hendrickson, C. A. M., Zozaya‐Gorostiza, C., Rehak, D., Baracco‐Miller, E., and Lim, P. (1987). “Expert system for construction planning.” J. Comput. in Civ. Engrg., ASCE, 1(4), 253–269.
9.
Klir, G. J., and Folger, T. A. (1988). Fuzzy sets, uncertainty, and information. Prentice‐Hall, Englewood Cliffs, N.J.
10.
Kouatli, I., and Jones, B. (1991). “Improved design procedures for fuzzy control systems.” Int. J. Machine Tools and Manufacture, 31(1), 107–122.
11.
Nay, L. B. III, and Logcher, R. D. (1985). “An expert systems framework for analyzing construction project risks.” Res. Rep. R85‐4, MIT, Cambridge, Mass.
12.
Rahbar, F. F. and Yates, J. K. (1991). “A knowledge engineering system for inquiry feedback project management.” Preparing for Construction in the 21st Century; Proc.; 1991 Constr. Congr., AACE, Cambridge, Mass., 704–709.
13.
Rahbar, F. F., Yates, J. K., and Spencer, G. R. (1991). “Project management knowledge engineering system.” Cost Engrg., 33(7), 15–24.
14.
Russell, A. D. (1993). “Computerized daily site reporting.” J. Constr. Engrg. and Mgmt., ASCE, 119(2), 385–402.
15.
Schmucker, K. J. (1984). Fuzzy sets, natural language computations, and risk analysis. Computer Science Press, Rockville, Md.
16.
Smith, G. R., and Hancher, D. E. (1989). “Estimating precipitation impacts for scheduling.” J. Constr. Engrg. and Mgmt., 115(4), 552–566.
17.
Stukart, G. (1990). “Bar code standards.” Trans. of the Am. Assoc. of Cost Engrs., D.4.1–D.4.5.
18.
Tee, A. B., and Bowman, M. D. (1991). “Bridge condition assessment using fuzzy weighted averages.” Civ. Engrg. Systems, 8(1), 49–57.
19.
Thomas, H. R. et al. (1990). “Modeling of construction labor productivity.” J. Constr. Engrg. and Mgmt., ASCE, 116(4), 705–726.
20.
Thomas, H. R., Sanders, S. R., and Horner, R. M. W. (1988). Procedures manual for collecting productivity and related data of labor‐intensive activities on commercial construction projects. Pennsylvania State University, University Park, Pa.
21.
Tong, R. M., and Bonissone, P. P. (1984). “Linguistic solutions to fuzzy decision problems.” Fuzzy Sets and Decision Anal., 20, 323–334.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 120Issue 1March 1994
Pages: 11 - 33

History

Published online: Mar 1, 1994
Published in print: Mar 1994

Permissions

Request permissions for this article.

Authors

Affiliations

Alan D. Russell, Member, ASCE
Prof., Dept. of Civ. Engrg., Univ. of British Columbia, 2324 Main Mall, Vancouver, B.C., Canada, V6T 1Z4
Aminah Fayek
Grad. Res. Asst., Dept. of Civ. Engrg., Univ. of British Columbia, 2324 Main Mall, Vancouver, B.C., Canada, V6T 1Z4

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share