Quality Function Deployment—A System for Meeting Customers' Needs
Publication: Journal of Construction Engineering and Management
Volume 119, Issue 3
Abstract
Quality function deployment (QFD) has been in existence for almost 20 years, but it has been confined primarily to the manufacturing industry. With the continuing emphasis on quality within the construction industry, QFD may make the difference between success or failure in an ever‐increasing competitive environment. The relationships between QFD and other proven quality‐control methods, such as total quality control (TQC) and total quality management (TQM) are addressed. Two levels of quality, expected quality and exciting quality, are defined and a concept of customer relationships not generally recognized will be introduced. Although the QFD method is currently not in routine use in the construction industry, it represents an additional management tool that cannot be ignored.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Akao, Y. (1990). Quality function deployment: Integrating customer requirements into product design. G. H. Mazur, Trans., Productivity Press, Cambridge, Mass.
2.
Bossert, J. L. (1991). Quality function deployment: A practitioner's approach. ASQC Quality Press, Milwaukee, Wis.
3.
Barrie, D. S., and Paulson, B. C. (1984). Professional construction management. 2nd ed., McGraw‐Hill, New York, N.Y.
4.
Burati, J. L., and Farrington, J. J. (1987). “Costs of quality deviations in design and construction.” Source Document No. 29, Construction Industry Institute, Clemson University, Clemson, S.C.
5.
Deming, W. E. (1986). Out of the crisis. Massachusetts Institute of Technology, Cambridge, Mass.
6.
Fortuna, R. M. (1987). Beyond SPC: Taking quality upstream. Association for Manufacturing Excellence, Inc., Wheeling, Ill.
7.
Gitlow, H. S. (1990). Planning for quality, productivity and competitive position. Dow Jones‐Irwin, Homewood, Ill.
8.
Imai, M. (1986). Kaizen: The key to Japan's competitive success. Random House, New York: N.Y.
9.
Ishikawa, K. (1985). What is total quality control? D. J. Lu, Trans., Prentice‐Hall, Englewood Cliffs, N.J.
10.
Juran, J. M. (1988). Juran on planning for quality. The Free Press, New York, N.Y.
11.
King, R. (1989). Better designs in half the time. 3rd ed., GOAL/QPC, Methuen, Mass.
12.
Matthews, M. F., and Burati, J. L. (1989). “Quality management organizations and techniques.” Source Document No. 51, Construction Industry Institute, Clemson University, Clemson, S.C.
Information & Authors
Information
Published In
Copyright
Copyright © 1993 American Society of Civil Engineers.
History
Received: Jul 27, 1992
Published online: Sep 1, 1993
Published in print: Sep 1993
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.