Probabilistic Cost Estimating with Subjective Correlations
Publication: Journal of Construction Engineering and Management
Volume 119, Issue 1
Abstract
One of the difficulties in probabilistic estimating is accounting for the existing correlations among cost components modeled as random variables. Even if the estimator is aware of the existence of correlations among random variables, calculating accurate values of correlation coefficients is not feasible most of the time. A methodology for generating correlated random numbers in a Monte Carlo simulation for construction cost estimating is reviewed. A methodology is then suggested that simplifies the process of incorporating the effect of correlation coefficients in probabilistic estimating. This methodology consists of assigning subjective measures of correlation between variables. Also, a method is suggested for adjusting the covariance matrix in which correlation estimates are not accurate. Procedures presented are further explained by two examples using actual construction cost data.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Curran, M. W. (1989). “Range estimating.” Cost Engrg., 31(3), 18–26.
2.
Devore, J. L. (1991). Probability and statistics for engineering and sciences. 3rd Ed., Brooks/Cole Publishing Co., Pacific Grove, Calif.
3.
Fishman, G. S. (1978). Principles of discrete simulation. John Wiley and Sons, New York, N.Y.
4.
Iman, R. L., and Conover, W. J. (1982). “A distribution‐free approach to inducing rank correlation among input variables.” Communications in Statistics: Simulation and Computations, 11(3), 311–334.
5.
Johnson, M. E., and Ramberg, J. S. (1978). “Transformations of the multivariate normal distribution with applications to simulation.” Tech. Rep. LA‐UR‐77‐2595, Los Alamos Scientific Lab., Los Alamos, N.M.
6.
Law, A. M., and Kelton, W. D. (1991). Simulation modeling and analysis. 2nd Ed., McGraw‐Hill, Inc., New York, N.Y.
7.
Means construction cost data. (1991). R. S. Means Co., Inc., Kingston, Mass.
8.
Morgan, M. G., and Henrion, M. (1990). Uncertainty: A guide to dealing with uncertainty in quantitative risk and policy analysis. Cambridge Univ. Press, New York, N.Y.
9.
Pritsker, A. A. B. (1986). Introduction to simulation and SLAM II. 3rd Ed., Systems Publishing Corp., West Lafayette, Ind.
10.
SLAM II/PC user's manual. (1987). Pritsker and Assoc., Inc., West Lafayette, Ind.
11.
Spooner, J. E. (1974). “Probabilistic estimating.” J. Constr. Div., ASCE, 100(1), 65–77.
12.
Touran, A., and Wiser, E. (1992). “Monte Carlo technique with correlated random variables.” J. Constr. Engrs. and Mgmt., ASCE, 11(2), 258–272.
13.
Wiser, E. (1991). “Analysis of cost data in commercial construction projects,” Ms thesis, Northeastern University, Boston, Mass.
Information & Authors
Information
Published In
Copyright
Copyright © 1993 American Society of Civil Engineers.
History
Received: Jul 15, 1992
Published online: Mar 1, 1993
Published in print: Mar 1993
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.