TECHNICAL PAPERS
Mar 1, 1991

Management of Engineering/Design Phase

Publication: Journal of Construction Engineering and Management
Volume 117, Issue 1

Abstract

This paper critiques the common practice in managing and tracking the engineering/design phase of major projects and presents an alternative integrated approach. It addresses in detail the development of control budget, project schedule, progress measurement procedure, and project data base to accomplish full cost and scheduling integration. Cost/schedule integration is achieved by: (1) Developing control budget based on the project work breakdown structure (WBS); (2) identifying all project documents on the project WBS; (3) grouping the project documents in work packages; (4) making reference to the work packages on the project schedule; (5) determining distinguishable events (control points) for each package; and (6) using the earned value concept as the means for progress measurement. The procedure is capable of objectively determining the progress of the scheduling activities, performance indices, and budget forecasts. A numerical example and a case study are provided to illustrate the implementation and computational procedure of the presented approach.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Eldin, N. N. (1989). “Measurement of Work Progress: Quantitative Technique,” J. Constr. Engrg. and Mgmt., ASCE, 115(3), 462–474.
2.
Construction Industry Institute (1988). “Project control for engineering.” Publication No. 6‐1, Bureau of Engineering Research, Univ. of Texas at Austin.
3.
Rogers, M. F. (1979). “Cost/Performance Measurements—A New Concept for Contractors,” American Association of Cost Engineers, Transaction of the 23rd Annual Meeting, Cincinnati: pp. D.8.1–D.8.4.
4.
Russell, A. D. (1982). “General Contractor Project Control Practices and MIS,” J. Constr. Div., ASCE, 108(3), 419–437.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 117Issue 1March 1991
Pages: 163 - 175

History

Published online: Mar 1, 1991
Published in print: Mar 1991

Permissions

Request permissions for this article.

Authors

Affiliations

Neil N. Eldin, Member, ASCE
Asst. Prof. of Constr. Mgmt., Univ. of Wisconsin, 460 Henry Mall—232D, Madison, WI 53706

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share