Sequencing Knowledge for Construction Scheduling
Publication: Journal of Construction Engineering and Management
Volume 117, Issue 1
Abstract
This paper describes and formalizes knowledge utilized by skilled schedulers for sequencing construction activities. Although it is recognized that construction scheduling involves many tasks (activity identification, duration estimation, etc.), the focus here is limited to an understanding of a number of key activity sequencing principles. This paper provides a grammar or language that represents governing factors for construction activity sequencing. Four basic factors are identified and described in detail. The physical relationships that exist among the different building components is one of the factors. Another is the interaction of construction trades. Sequencing is also affected by the requirement of an interference‐free path for all the objects to be displaced around the job site at construction time. Code regulations are also relevant for determining the order of execution of certain activities. A discussion of the flexibility of these four different sequencing constraints and of their relation to time is also presented. Finally, a brief overview of a knowledge‐based prototype system that incorporates a few of the identified sequencing governing factors is provided.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
“American national standard safety requirements for steel erection.” (1978). Publication No. A10.13‐1978, American Nat. Standards Inst. Inc., New York, N.Y., Jul.
2.
Chang, T. C., Ibbs, C. W., and Crandall, K. C. (1990). “Network resource allocationwith support of a fuzzy expert system.” J. Constr. Engrg. and Mgmt., 116(2), 239–260.
3.
Cherneff, J. M. (1988). “Automatic generation of construction schedules from architectural drawings,” thesis presented to MIT, at Boston, Massachusetts, in partial fulfillment of the requirements for the degree of Master of Science.
4.
“Construction industry OSHA safety and health standards.” OSHA Publication No. 2207, U.S. Dept. of Labor, Washington, D.C.
5.
Echeverry, D., Ibbs, C. W., and Kim, S. (1989). “A knowledge‐based approach to support the generation of construction schedules.” Proc. of the International Conference on Application of Artificial Intelligence Techniques to Civil and Structural Engineering, City Univ., London, U.K.
6.
Gray, C. (1986). “Intelligent construction time and cost analysis.” Constr. Mgmt. and Economics J., 4(2), 135–150.
7.
Kartam, N., and Levitt, R. E. (1990). “Intelligent planning of construction projects.” J. Comput. in Civ. Engrg., ASCE, 4(2), 155–175.
8.
Navinchandra, D., Sriram, D., and Logcher, R. D. (1988). “GHOST: Project Network Generator.” J. Comp. in Civ. Engrg., ASCE, 2(3), 239–254.
9.
Simons, K. L., Thornberry, H. L., and Wickard, D. A. (1988). “Simulation system for construction planning and scheduling.” Presented at the Joint ASME/IEEE Power Generation Conference, American Society of Mechanical Engineers, Philadelphia, Pa.
10.
Zozaya‐Gorostiza, C., and Hendrickson, C. (1988). “Knowledge‐based planning for construction projects.” Technical Report No. R‐88‐170, Dept. of Civ. Eng., Carnegie Mellon Univ., Pittsburgh, Pa.
Information & Authors
Information
Published In
Copyright
Copyright © 1991 ASCE.
History
Published online: Mar 1, 1991
Published in print: Mar 1991
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.