Research Article
Jan 1949
Operation of the Conowingo Hydroelectric Plant
This article has a reply.
VIEW THE REPLYThis article has a reply.
VIEW THE REPLYPublication: Transactions of the American Society of Civil Engineers
Volume 114, Issue 1
Abstract
Large run-of-river hydroelectric (or “hydro”) developments on rivers with extremely wide variations in flow can only be justified on a sound economic basis provided such plants can be operated in conjunction with a large steam generating system so as to attain the greatest possible economic use of the hydroelectric power. By reducing the steam generating costs to a minimum, over-all economies can be effected to ∼aximum advantage for the entire system. Allocation of hydroelectric energy to the best advantage requires determinative river flow forecasting, proper use of pondage, maintenance of head, and station efficiency so that maximum capacity and maximum energy can be obtained from the available water to replace the most expensive steam generation. This paper presents in detail the methods by which the various factors are analyzed to determine the most effective operation sequences for a large hydroelectric installation.
Get full access to this article
View all available purchase options and get full access to this article.
Information & Authors
Information
Published In
Copyright
© 1949 American Society of Civil Engineers.
History
Published in print: Jan 1949
Published online: Feb 10, 2021
Permissions
Request permissions for this article.
Authors
Affiliations
Robert E. Turner, M.ASCE
Hydrographer, The Susquehanna Elec. Co., Conowingo, Md.
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.
View Options
Get Access
Access content
Please select your options to get access
Log in/Register
Log in via your institution (Shibboleth)
ASCE Members:
Please log in to see member pricing
Purchase
Save for later Item saved, go to cart Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Get Access
Access content
Please select your options to get access
Log in/Register
Log in via your institution (Shibboleth)
ASCE Members:
Please log in to see member pricing
Purchase
Save for later Item saved, go to cart Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.