Research Article
Sep 1979

Real-Time Hourly Reservoir Operation

Publication: Journal of the Water Resources Planning and Management Division
Volume 105, Issue 2

Abstract

An hourly optimization model is developed for on-line use in the operation of the Central Valley Project (CVP) in California. The hourly model is supplemental to monthly and daily optimization models previously developed for the CVP, and maximizes a weighted summation of generated power over a 24-hr period subject to specified plant releases obtained from a daily model, a desired hourly power schedule, and appropriate system and equipment constraints. The procedure has been developed in two phases. Phase I involves a determination of a good feasible policy (a set of releases) through an iterated linear programming and adjust process. Phase II uses this feasible policy as a starting policy in an incremental dynamic programming, successive approximations process to derive an optimal policy. CVP operational records of some typical days are compared with the model outputs for these days, and significant improvements are observed.

Get full access to this article

View all available purchase options and get full access to this article.

Information & Authors

Information

Published In

Journal of the Water Resources Planning and Management Division
Volume 105Issue 2September 1979
Pages: 187 - 203

History

Published in print: Sep 1979
Published online: Feb 12, 2021

Permissions

Request permissions for this article.

Authors

Affiliations

William W-G. Yeh, AM.ASCE
Prof., Engrg. Systems Dept., Univ. of California, Los Angeles, Calif
Leonard Becker
Asst. Research Engr., Univ. of California, Los Angeles, Calif
Wen-Sen Chu
Grad. Student, Engrg. Systems Dept., Univ. of California, Los Angeles, Calif

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share