Technical Papers
Sep 25, 2017

Measuring Impacts and Risks to the Public of a Privately Operated Toll Road Project by Considering Perspectives in Cost-Benefit Analysis

Publication: Journal of Transportation Engineering, Part A: Systems
Volume 143, Issue 12

Abstract

Decision making about transport infrastructure investment is based on the net impacts and risks to the community. The private sector is often involved in toll road projects, including various schemes to design, build, operate and/or finance the project, either in a partnership with a host government, independently, or in some combination. The cost-benefit analysis of a privately operated toll road requires careful allocation of the project impacts, in order to accurately reflect the net impacts and risks to the community from the host government’s perspective. This study investigated whether alternative assumptions from differing perspectives are valid when toll roads are delivered and operated privately rather than by a host government. The treatments of tolls and other toll road project-related payments were considered from different perspectives. Cost-benefit analysis was conducted for a synthesized toll tunnel project case, by considering alternative treatments of some impacts. That led to the exploration of the analysis outcomes of the treatment of tolls from two perspectives: the toll as a transfer payment and the toll as an end-user cost . Various scenarios were explored, including public versus private operations. The Monte Carlo simulation approach was used to account for the risks of variables in the analysis. The synthesized case study revealed that, for privately operated toll roads, treating toll charges as a transfer payment, and alternatively as an end-user cost, can both be valid approaches but from two perspectives. The analysis outcomes under different perspectives are particularly helpful for making decisions on the basis of the impacts and risks solely from the perspective of the host government. The proposed methodology can be used to examine scenarios other than the ones examined in this study, and it can be very useful in the project evaluations of privately operated toll road projects.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The authors would like to thank Professor Stephen Kajewski for constructive input. The authors also acknowledge the support of the School of Civil Engineering and Built Environment at Queensland University of Technology.

References

Aldrete, R., Bujanda, A., and Valdez, G. A. (2012). “Valuing public-sector revenue risk exposure in transportation public-private partnerships.” Transp. Res. Rec., 2297, 88–96.
Anas, A., and Lindsey, R. (2011). “Reducing urban road transportation externalities: Road pricing in theory and in practice.” Rev. Environ. Econ. Policy, 5(1), 66–88.
Australian Bureau of Infrastructure Transport and Regional Economics. (2012). “Research report 127: Traffic growth in Australia.” ⟨https://bitre.gov.au/publications/2012/files/report_127.pdf⟩ (Jan. 2016).
Australian Department of Infrastructure and Regional Development. (2013). “National public private partnership guidelines. Volume 5: Discount rate methodology and guidance.” ⟨http://www.infrastructureaustralia.gov.au/public_private/files/Volume_5_Discount_Rate_Methodology_Guidance_August_2103.pdf⟩ (Jan. 2016).
Australian Department of Infrastructure and Transport. (2011). “Review of traffic forecasting performance toll roads.” ⟨http://www.infrastructure.gov.au/infrastructure/public_consultations/files/attach_a_bitre_literature_review.pdf⟩ (Jan. 2016).
Australian Transport Council. (2006). “National guidelines for transport system management in Australia. Volume 4: Urban transport.” ⟨http://transportinfrastructurecouncil.gov.au/publications/⟩ (Jan. 2016).
Australian Transport and Infrastructure Council. (2016a). “Australian transport assessment and planning guidelines: T3 wider economic benefits.” ⟨http://atap.gov.au/tools-techniques/wider-economic-benefits/files/t3_wider_economic_benefits.pdf⟩ (Dec. 2016).
Australian Transport and Infrastructure Council. (2016b). “National guidelines for transport system management in Australia: Cost benefit analysis (T2).” ⟨http://atap.gov.au/tools-techniques/cost-benefit-analysis/index.aspx⟩ (Dec. 2016).
Bain, R. (2009). “Error and optimism bias in toll road traffic forecasts.” Transportation, 36(5), 469–482.
Beck, M., and Hensher, D. (2015). “Finding long-term solutions to financing 21st century infrastructure needs—A think piece.” Road Transp. Res., 24(3), 57–61.
Bel, G., and Foote, J. (2009). “Tolls, terms and public interest in road concessions privatization: A comparative analysis of recent transactions in the USA and France.” Transp. Rev., 29(3), 397–413.
Boardman, A., Greenberg, D., Vining, A., and Weimer, D. (2014). Cost-benefit analysis: Concepts and practice, 4th Ed., Pearson Education, Harlow, Essex, U.K.
Boardman, A., Vining, A., and Waters, W. G. (1993). “Association for public policy analysis and management costs and benefits through bureaucratic lenses: Example of a highway project.” J. Policy Anal. Manage., 12(3), 532–555.
BrisConnections. (2011). “BrisConnections—Delivering smarter ways to move.” ⟨https://www.airportlinkm7.com.au/media/8777/fact_sheet_-_smarter_ways_to_move.pdf⟩ (Jul. 2015).
BrisConnections. (2012). “AirportlinkM7 traffic.” ⟨http://www.brisconnections.com.au/media/13435/03.09.2012_airportlinkm7_traffic.pdf⟩ (Jul. 2015).
Bunker, J., and Troutbeck, R. (2003). “Prediction of minor stream delays at a limited priority freeway merge.” Transp. Res. Part B Methodol., 37(8), 719–735.
Carpintero, S. (2010). “Toll roads in central and eastern Europe: Promises and performance.” Transp. Rev., 30(3), 337–359.
Cowan, R. J. (1975). “Useful headway models.” Transp. Res., 9(6), 371–375.
Decorla-Souza, P., Lee, D., Timothy, D., and Mayer, J. (2013). “Comparing public-private partnerships with conventional procurement.” Transp. Res. Rec., 2346, 32–39.
De Rus, G. (2010). Introduction to cost-benefit analysis, Edward Elgar Publishing, Cheltenham, U.K.
GHD. (2013). “West petrie bypass business case report refined option G.” ⟨https://www.moretonbay.qld.gov.au/westpetrie/⟩ (Jan. 2016).
Glasserman, P. (2003). Monte Carlo methods in financial engineering, Springer, New York.
Go VIA. (2015). “Clem Jones tunnel—Facts, figures and milestones.” ⟨http://www.clem7.com.au/content/2218/Facts-Figures-and-Milestones⟩ (Oct. 9, 2015).
Go VIA. (2016). “Clem7.” ⟨http://govianetwork.com.au/our-roads/clem7/⟩ (Feb. 1, 2016).
Hensher, D. A., and Bliemer, M. C. J. (2014). “What type of road pricing scheme might appeal to politicians? Viewpoints on the challenge in gaining the citizen and public servant vote by staging reform.” Transp. Res. Part A Policy Pract., 61, 227–237.
Joksimovic, D., Bliemer, M., and Bovy, P. (2005). “Optimal toll design problem in dynamic traffic networks with joint route and departure time choice.” Transp. Res. Rec., 1923, 61–72.
Lemp, J. D., and Kockelman, K. M. (2009). “Understanding and accommodating risk and uncertainty in toll road projects.” Transp. Res. Rec., 2132, 106–112.
Li, Z., and Hensher, D. A. (2010). “Toll roads in Australia: An overview of characteristics and accuracy of demand forecasts.” Transp. Rev., 30(5), 541–569.
Liyanage, C., and Villalba-Romero, F. (2015). “Measuring success of PPP transport projects: A cross-case analysis of toll roads.” Transp. Rev., 35(2), 140–161.
Lombard, P. C., Sinha, K. C., and Brown, D. J. (1992). “Investigation of the relationship between highway infrastructure and economic development in Indiana.” Transp. Res. Rec., 1359, 76–81.
Mishra, S., Khasnabis, S., and Dhingra, S. L. (2013a). “A simulation approach for estimating value at risk in transportation infrastructure investment decisions.” Res. Transp. Econ., 38(1), 128–138.
Mishra, S., Khasnabis, S., and Swain, S. (2013b). “Multi-entity perspective transportation infrastructure investment decision making.” Transp. Policy, 30, 1–12.
Mishra, S., Khasnabis, S., and Swain, S. (2015). “Incorporating uncertainty and risk in transportation investment decision-making.” Transp. Plann. Technol., 38(7), 738–760.
Morgans Financial. (2016). “Toll roads equity research: Transurban group.” ⟨https://my1.morgans.com.au/r.cfm/4142F0CB-1D8B-4CA7-8999-DD853BFA16D7⟩ (Jul. 2015).
Mun, J. (2010). Modeling risk: Applying Monte Carlo risk simulation, strategic real options, stochastic forecasting, and portfolio optimization, 2nd Ed., Wiley, Hoboken, NJ.
Odeck, J. (2008). “How efficient and productive are road toll companies?” Transp. Policy, 15(4), 232–241.
Oh, J., Labi, S., and Sinha, K. (2007). “Implementation and evaluation of self-financing highway pricing schemes: A case study.” Transp. Res. Rec., 1996(1), 25–33.
Pantelias, A., and Zhang, Z. (2010). “Methodological framework for evaluation of financial viability of public-private partnerships: Investment risk approach.” J. Infrastruct. Syst., 241–250.
Poole, R. W. (2011). “Rethinking the politics of freeway congestion pricing.” Transp. Res. Rec., 2221, 57–63.
Queensland Department of Transport and Main Roads. (2011). “Cost-benefit analysis manual.” ⟨http://www.tmr.qld.gov.au/business-industry/Technical-standards-publications/Cost-Benefit-Analysis-Manual.aspx⟩ (Sep. 2014).
Queensland Government. (2008). “Toowoomba bypass project business case.” ⟨http://investment.infrastructure.gov.au/publications/reports/pdf/Toowoomba_Bypass_Business_Case_Final.pdf⟩ (Jan. 2016).
Reserve Bank of Australia. (2017). “Inflation calculator.” ⟨http://www.rba.gov.au/calculator/⟩ (Feb. 13, 2017).
Rockliffe, N., Patrick, S., and Tsolakis, D. (2012). “Guide to project evaluation. 2: Project evaluation methodology.”, Austroads, Sydney, NSW, Australia.
Rogers, M., and Duffy, A. (2012). Engineering project appraisal: The evaluation of alternative development schemes, 2nd Ed., Wiley, Oxford, U.K.
Rose, J. M., and Hensher, D. A. (2014). “Toll roads are only part of the overall trip: The error of our ways in past willingness to pay studies.” Transportation, 41(4), 819–837.
Salling, K. B. (2008). “Risk analysis and decision support assessment of transport projects risk analysis and decision support.” Ph.D. thesis, Technical Univ. of Denmark, Lyngby, Denmark.
Salling, K. B., and Leleur, S. (2011). “Transport appraisal and Monte Carlo simulation by use of the CBA-DK model.” Transp. Policy, 18(1), 236–245.
SKM and Connell Wagner. (2006). “Airport link phase 2 detailed feasibility study. Chapter 16: Economic impact analysis.” ⟨http://eisdocs.dsdip.qld.gov.au/AirportLink/EIS/Volume3-TechnicalPapers/13-economics.pdf⟩ (Jul. 2015).
SKM and Connell Wagner. (2008). “Northern link phase 2—Detailed feasibility study.” ⟨http://www.statedevelopment.qld.gov.au/assessments-and-approvals/legacy-way-eis-documents.html⟩ (Jul. 2015).
Tirachini, A., Hensher, D. A., and Bliemer, M. C. J. (2014). “Accounting for travel time variability in the optimal pricing of cars and buses.” Transportation, 41(5), 947–971.
Transportation Research Board. (2010). “Highway capacity manual 2010. Volume 2: Uninterrupted flow.” ⟨http://www.trb.org/Main/Blurbs/164718.aspx⟩ (Sep. 2014).
Transurban. (2014). “Transurban 2014 investor day.” ⟨http://www.asx.com.au/asxpdf/20140918/pdf/42s90sy3hwv9g8.pdf⟩ (Jan. 2016).
Transurban. (2015). “CLEM7.” ⟨http://www.transurban.com/clem7.htm⟩ (May 30, 2016).
Transurban. (2016a). “AirportlinkM7.” ⟨http://www.transurban.com/airportlinkm7.htm⟩ (May 30, 2016).
Transurban. (2016b). “Legacy way.” ⟨http://www.transurban.com/legacyway.htm⟩ (May 30, 2016).
Troutbeck, R. (1992). “The effect of platoon dispersion on the performance of roundabouts and unsignalised intersections.” ⟨https://trid.trb.org/view.aspx?id=377241⟩ (Jul. 2016).
van Wee, B., and Rietveld, P. (2014). “CBA: Ex ante evaluation of mega-projects.” International handbook on mega-projects, H. Priemus and B. van Wee, eds., Edward Elgar, Cheltenham, U.K., 269–290.
Vassallo, J. M., and Baeza, M. (2007). “Why traffic forecasts in PPP contracts are often overestimated.” ⟨http://www.transyt.upm.es/index.php/en/deliverables.html?download=21:why-traffic-forecast-in-ppp-contracts-are-often-overstimated⟩ (Jul. 2015).
Vassallo, J. M., Ortega, A., and de los Ángeles Baeza, M. (2012). “Risk allocation in toll highway concessions in Spain.” Transp. Res. Rec., 2297, 80–87.
Welde, M. (2011). “Demand and operating cost forecasting accuracy for toll road projects.” Transp. Policy, 18, 765–771.
Zhang, L. (2008). “Welfare and financial implications of unleashing private-sector investment resources on transportation networks.” Transp. Res. Rec., 2079, 96–108.
Zhang, Z., Bai, Q., Labi, S., and Sinha, K. C. (2013). “General framework for evaluating long-term leasing of toll roads.” Transp. Res. Rec., 2345, 83–91.

Information & Authors

Information

Published In

Go to Journal of Transportation Engineering, Part A: Systems
Journal of Transportation Engineering, Part A: Systems
Volume 143Issue 12December 2017

History

Received: Feb 11, 2017
Accepted: May 22, 2017
Published online: Sep 25, 2017
Published in print: Dec 1, 2017
Discussion open until: Feb 25, 2018

Permissions

Request permissions for this article.

Authors

Affiliations

Dept. of Civil Engineering and Built Environment School, Queensland Univ. of Technology, Brisbane, QLD 4000, Australia (corresponding author). ORCID: https://orcid.org/0000-0001-7441-3877. E-mail: [email protected]
Jonathan Bunker, Ph.D.
Associate Professor, Dept. of Civil Engineering and Built Environment School, Queensland Univ. of Technology, Brisbane, QLD 4000, Australia.
Melissa Teo, Ph.D.
Dept. of Civil Engineering and Built Environment School, Queensland Univ. of Technology, Brisbane, QLD 4000, Australia.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share